MISSION 1OOO RKM ELECTRIFICATION OVER S.C. RAILWAY

qRd-rtr{iFE/Government of India
tq riilUq/N inistry of Raitways
qliPr qq Hlsouth centrat Raitway

r6rcdtr6(fr{5d )/ Gene ra I M anager[ E]


tgfeq oml(fqln eadq ua rte rs office
frfi-firdtE/Secu ndera bad-5OO O2 5
Lr. No. E.219f|RDIRE-RVNL-CON/Vo|.V frqio/oate:10.01.2023
cPD/ RE/SC, CEE/CON/SC,
GM/ E/RVNL/SC, MAS, GM/ RITES/SC,
GGM/E/RITES/Gurgaon,
ST.DEE/TRD/SC, BZA,
ST.DEE/TR/GTL, GNT, HYB, NED. ._

Sub.: Standard joint check formats SJC No.1-4-Re9

s
Standard Joint Check formats (SJdbNo, 1-4) have been have been redesigned
for carrying out RE joint check works of cantilevers, ATD, Ladder Trolley check and
Tower Car check.

All the Executing Agencies and STDEErrRD/TR's shall ensure joint check data
is recorded by all TRD stalF in the standard form i.e., SJC-1 to 4 only either in a sheet
or in a register. No other format for the joint checks is allowed and any deviation will
be viewed seriously.

(Ch. S. Red
Chief Electrical Distribution Eng n r
For Principal Chief Electrical Enginee
Date of issue 05.01.2023
STANDARD JOINT CHECK FORMAT s.lc No 1
Till next Rev OF CI. AND OHE Rev. No 0
To be prepared by TRD, Executing
lssued by PCEE/ SCR & Contractor
ratel
5.No Description/Details S.No Description/Details

1 Joint Check done on date : 2 OA date of Contract:

3 Location No.: 4 Chainage (as per LOP)

5
ion Span length :
6
7 Location on straight line/Curve: 8 Versine in mm (actual):
9 FBM code as per CSD 10 ndation type: As per CSD and actual:

11 Type of mast and make: 12 of Dwarf Mast:

13 Step Distance: t4 Super block:


15 ast embedded length
lmp
11 SOD: lmp at face of tdn.= (>2.5712.721 18 RT Oropper takint load or not (Y/N):
19 Deflection as per SED/Actual: 20 Top & Eottom attachment have Adopter/Not:
21 Muffing done / not done 22 Style of RT ( Push/Pull off):
23 Number plate provided or not 24 Luminous/Non-lominous Number Plate:
C/RL Marking on mast as per guide
25 26 Stenciling of Location Number {y/N)
nes (Y/N):
27 Structure bond provided outside of Rail (y/N): 28 Stay lnsulator Hook Direction towards ATD

29 Top & Bottom attachement ht. from R[: 30 Back distance : if less or more adjust to 2.00 m.
31 Projection of mast from top fitting: (min.15 cm) Steady clearance: (min.30 cm)
33 Catenary/Contact wire heitht 34 Stagger of catenary/contact
35 Distance of RT (C clamp)to Bracket lnsulator: (min.g cm) 36 RRT length
RRT holes out:
37 38 BT Projection(min.20cm):

39 Dimensions as per SED/Actual: A: B: c: D

40 RT Projection(min.20cm) 4t Stay sleeve make:


42 Catenary sus.8k make (write code) 43 I wire ending clamp make for ACA

44 Swivel Cilp make & year: 45 Adjuster at ACA location availabte (y/N)

46 No. of Stay adjuster holes/hotes out: 3 to 5 for 12 hote 47 checks oftightness of bolts and nuts
adjuster & 7-9 for 16 hole u5ter
48 Availability of BTIRT Cap:

49 lnsul ator make and Batch No. Stay Bkt: 9Ton:


50 lnsulator tested or not: (Y/N) (lf not replace insulator) 51 Date of test:
s2 Type of RRA Clamp provided (1371-3/4): 53 Provision of Packing Saddles (y/N):

54 E ns re rti cal I o It h ave N ut o n Eotto m exce pt c cl a m p 55 Drop Eracket Eott 10x25x20(Ftat End)(y/N):
N

55 Dropper Clip Bolt 10x3S x3o(Slot For split-Pin): 57 5ta y Sleeve Bolt(10x35x30(poinred Edge): y/N:
{Y/N)
Re ma rks tf any: No rema rks o n workmansh rp allowed.
n ca 5e ol material s honage, p la n next day or whe received
Throw rd tn8 adju stment o Car check not a lowed TR D staff to nform SrD EE of adju
p st ment not d o ne
& cont ract ors of R N R ITES tries to go to next locat o n wit h woakm
an sh d efects.

Sit. of Contractor Representative Sit. of Exe. Atency Representative Si8. of TRO Representative
(Name & Desig.) (Name & Desi8.) (Nam€ & Oesig.)
Date of issue 05.01.2023
STANDARO JOINT CHECK FORMAT SJC No. 2
Val Till next Rev OF ATD WITH TRD Rev. No 0
To be prepared TRD, Executing
lssued by PCEE/ SCR by Agency &
Contractor
Separatel
S. No Description/Details S.No Description/Details
1 joint Check done on date : 2 Section:
3 Location No.: 4 Chainage:
5 Type of Mast ( as per LOP/Actual): 6 lmplantation:
7 so D: I Step Distance:
9 Anchor foundation exposed ht. (min. locm & max.6Ocm 10 Whether BUide tube provided (Yes/No)
with extra depth of 50cm
11 Guide Tube locked/not locked (Both top & bottom): 72 uy rod setting distance

13 No. of Oroppers in OOR IMin.3 nos] l4 Muffin8 Done/Not Done:


15 Size of muff (Length x Breadth x Height) : ATD Counter weight Painted/Not Painted:
t7 Location no. stenciled on Counter weight ( y/N): 18 Condition of counter weight : No. of Counter
hts rovided No's
19 Free movement of counter weight with spring balance 20 Max./ Minimum marking of counter weight
(8 ke): movementat 15,35 & 55oC painted/not painted
on mast (Y/N):
27 Type of ATD & Make: Condition of ATD Pulley ( Crack/good)
23 Make of SS wire Rope: 24 Condition of SS wire rope : (St.ands cut/Good)
ght of Anchor Attachment from RL
25 26 Guy rod length:
7.06 M
27 Make & Batch No. of 9-ton insulator Availability of one Meter Distance Rod (y/N)
29 Catenary wire ending cone make & year: 30 Contact wire ending cone make &year:
31 ATD Hex tie rod(sleeve) provided/Not provided Sleeve Length (as per chart & actual):
33 Clevis Make: 34 Availability of Antifalling Rods with attachment
: Yes/No
35 Avaiiability of Double strap between compensatiBgplate & 36 Position of compensating plate (5 cms towards
9T insulator: Y contactwire) :
Half Tension Length:
37 38 Temperature at the time of Adjustment:
39 X' Value as per chart/actual: 40 Y'value as per chart /actual:
47 Whether 'X' or 'Y' value Adjusted 42 Ht. of 35 markinS from muff

Remarks lf any: Any item whose mfd date is before LOA date (before date recorded in or as
tiven in RTTES
certificate) div€rsion cenlficate to be submitted for approval. SSE s to advlse SrDEE & SrDEE to advise agency to
submit documents before EtG application.
Note: Throw forwarding of defects attention to Ladder Trolley check not allowed. TRD staff to talk to SrDEE in
case of non-attentlon ol defects.

Si8. of Contractor Representative Si8. of Exe. ASency Representative Sit. ofTRD Representative
(Name & oesig.) (Name & Desit.) (Name & Desig.)
Date of issue 05.01.2023
STANDARD ,IOINT CHECK FORMAT SIC No. 3
Validi Till next Rev OF LADDER TROI-tEY Rev. No 0
To be prepared TRD, Executing
lssued by PCEE/ SCR by Agency &
Contrador
Separatel
S.No Description/Details S.No Description/Details
1 Ladder Trolley done on date : 2 Section:
3 Location No,: From -To: 4 Span length:
5 No. of droppers 6 Encumbrance:
7 Availability of pins except swivel clip pin: (y/N): 8 Length of A dropper & B dropper:
lf no, shall provide next day w/o fail, deferring to T. Car
not allowed.
9 Availability of A dropper at 2.25m on either side of CL. 10 Adjustments done in Non-standard span at g
(Y/N) : Else adjust. ropper:
11 Tightening of contact & catenary dropper clips: L2 Availability of C-Jumper at ACC & distance from
(Y/N):
13 Length of C-lumper: 14 Length of F-Jumper:
15 Availability of G-Jumper of length 4.1m @ T.Out &x- 15 Availability soldering for C, F & G-Jumpers
Overs, 4.0m @ 1* sub sector & 3.gm @ other places at ends:
5.6m from CL:
t7 Any removalof kinks in contact wire with Nylon mallet- 18 'fightening of PG Clamps-(y/N)
(Y/N):

Remarks It any: Any item whose mfd' date is before LoA date (before date recorded in
or as grven in RrrEs
certificate) diverslon certlficate to be submitted for approrral, lumpers must be erected and all
split pins are to be
provided.
Note: Throw forwardint of d€fects attention to S€D/fower Ca, check not allowed.

Si8. of Conractor Representative Sig. of Exe. Atency Representative Sig. of TRD Representative
(Name & Desit.) (Name & Desit.) (Name & Desit.)
Date of issue SJC No. 4-A
Validity Till next STANDARD JOINT CHECK FORMAT OF TOWER Rev. No.
CAR CHECK WITH TRD To be prepared TRD, Executing
Issued by PCEE/SCR
by Agency & Contractor
T/Car Joint Check

DATE: Section: Profiling PTFE Details of


SI
under adj ust Kinks/Twists in
Final Adjustment Tumout Crossover adj ustment Remarks
FOB/ROB ment Contact wire
S.No Location plumb of ofdroppers adjustment adj ustment date
date date removed
CL with pins date date

G I I

al

Sig. of Contractor Representative Sig. ofExe. Agency Representative Sig. of TRD Representative
(Name & Desig.) (Name & Desig.) (Name & Desig.)
Date of ,t-B
SJC No.
issue
Till next
Validity Rev. No. 0
rev. STANDARD JOINT CHECK FOR]UAT OF TOWER CAR CHECK WITH
TRD TRD,
PCEE/SC To be Executing
Issued by
R prepared by Agency &
Contractor

T/Car Joint Check

DATE: Section:

Swivel Clip JUMPERS (if leftout in Trolley


HEIC HT STAGG ER
pin Check due to material shortage)

Final Sweeping provided or


Distance from length of Pending remarks with
S.No Location Catenarv Contact Catenary Contact Steady mne al nol (must Type jumper used
the Mast reasons
Clearance Overlaps provide)

II
II
Note-l : No pending remarks allowed, Tower car shall not move forward unless defects are attendcd except where material is not available, attend
such remarks next day without fail.
Note-2 : Throw forwarding attention of defects for trolley check not allowed. No rushing of Tower Car check in the nsmc of progress keeping above
remarks pending. TRD staffto report to SrDEE dir€ctly ifthere is pressure from Con/RE/RVNL/RITES contractors to rush without attention of
defects.

Sig. of Contractor Representative Sig. of Exe. Agency Representative Sig. of TRD Representative
(Name & Desig.) (Name & Desig.) (Name & Desig.)