You are on page 1of 56

WPS/PQR for WATER DRUM

20F-321
Doc. No : WE/JWTS/WF154100/P31/01 Rev 1
Rev. 0C Page 1 of 56
EPCL No : ESR00400-20-QM-O4279A-2501

PROJ.: JEBEL ALI REFINERY EXPANSION PROJECT


CLIENT : ENOC PROCESSING COMPANY L.L.C. (EPCL)
VENDOR DOCUMENT REVIEW
MATERIAL REQUISITION NO.
071973C MR 0150.001 REV 0B 1 REVISE AND RESUBMIT

TO BE ISSUED AS FINAL PROVIDED


EPCL N.: ESR00400-20-QM-O4279A-2501 2
COMMENTS ARE INCORPORATED
RM NRM 3 NO COMMENT – FINAL ISSUE

Document Size A4 EPCL Class C 4 FOR INFORMATION ONLY

ITEM : HP Boiler 20F-321


Paolo Grancagnolo - Oct 17, 2017
SR DOC CODE: B1304

PURCHASE ORDER NO.: 04279 Rev 0 Dt 13/01/2017

2 Third Issue 18 Aug 2017 IFR AK AK RM

1 Second issue 12 Jun 2017 IFR AK AK RM

0 First Issue 20 Jan 2017 IFR KNA MKJ SV

Sr
Description Date Doc Status Made By Prepared By Chk By
No

ENOC PROCESSING COMPANY L.L.C. (EPCL)

TECHNIP ITALY S.p.A.

THERMAX LIMITED
C6 C7
C11

C8 C13

C8 to C13 C12
C9 C10
C14
C15

WELD MAP
Boiler no.:- WF154100
Equipment:- Water Drum
Drawing no.:- P31-1FM-144331 Rev.0
EPCL no.:- 20F-15317-6503 Sr. No.1
Control no.:- WE/WMAP/WF154100/P31/D/01 Rev.1
(Sheet 1 of 1)
NDE MAP FOR PROJECT NO. WF154100 TECHNIP PROJECT

SRL NO STAGES NDE METHOD EXTENT REMARK

(A) BOILER DRUMS : P31-1FM-144331 Rev.0 WATER DRUM


WELD (BEFORE PWHT)

A) Tack Welds OF Long Seam L1 to L4 & Circ seam C1


to C5 and Manway TO Dish End C6 & C7 & Nozzie Butt PT & VT 100%
Joints C8 to C21

B} Flaw Detection on Weld Edges PT & VT 100%

C) BG of Long Seam L1 to L4 & Circ seam C1 to C5 PT/MT & VT 100%


D) Aftr full welding of Long Seam L1 to L4 &
PT/MT & VT 100%
Circ seam C1 to C5

E) Weld soundness ( Long Seam L1 to L4 & Circ seam VT & RT 100%


1 C1 to C5 and but weld nozzle joint C21

F) Flaw Detection of nozzle openings > & = 10 NPS PT/MT & VT 100%

G) Nozzle Down Comer " BG" PT/MT & VT 100%

H) Full Penetration Welds UT/MT & VT 100%

I) Safty Nozzles (Full Penetration) Welds UT/MT & VT 100%

J) Manhole to Dish End Full Weld C6 & C7 UT/MT & VT 100%


K) All Welds ( nozzels & Attechments)
PT/MT & VT 100%
C8 to C20
L) PTC for L Seams RT & VT 100%

AFTHER PWHT
A) T- Joints on L & C Seam, Manhole to Dishend, Safty
PT/MT & VT 100%
Nozzle Welds
2
B) MH Rim to D"end Welds accessible area,Safety Valve
MT & VT 10%
Nozzle weld
C) Nozzle >= 10 NPS or Above 25 Thk MT & VT 100%

OTHER STAGES
A) Manhole Edge opening or any other GAS Cutting
PT/MT & VT 100%
opening
3
B) NDE on Holes coming on shells PT/MT & VT 100%
C) Hardness Test after PWHT
Hardness Random
Long Seam L1 to L4 & Circ seam C1 to C5