20F-321
Doc. No : WE/JWTS/WF154100/P31/01 Rev 1
Rev. 0C Page 1 of 56
EPCL No : ESR00400-20-QM-O4279A-2501
Sr
Description Date Doc Status Made By Prepared By Chk By
No
THERMAX LIMITED
C6 C7
C11
C8 C13
C8 to C13 C12
C9 C10
C14
C15
WELD MAP
Boiler no.:- WF154100
Equipment:- Water Drum
Drawing no.:- P31-1FM-144331 Rev.0
EPCL no.:- 20F-15317-6503 Sr. No.1
Control no.:- WE/WMAP/WF154100/P31/D/01 Rev.1
(Sheet 1 of 1)
NDE MAP FOR PROJECT NO. WF154100 TECHNIP PROJECT
F) Flaw Detection of nozzle openings > & = 10 NPS PT/MT & VT 100%
AFTHER PWHT
A) T- Joints on L & C Seam, Manhole to Dishend, Safty
PT/MT & VT 100%
Nozzle Welds
2
B) MH Rim to D"end Welds accessible area,Safety Valve
MT & VT 10%
Nozzle weld
C) Nozzle >= 10 NPS or Above 25 Thk MT & VT 100%
OTHER STAGES
A) Manhole Edge opening or any other GAS Cutting
PT/MT & VT 100%
opening
3
B) NDE on Holes coming on shells PT/MT & VT 100%
C) Hardness Test after PWHT
Hardness Random
Long Seam L1 to L4 & Circ seam C1 to C5