Project: NH:37 Contract package – EW – II (AS-02/AS-18) Doc. no.

EW-CL-02
Rev. 0
Date
Received
Ref. RFI
Checklist for : Earthworks ( Excavation In Cut)
No.

Location : Other Information:

Item Description Con Con SC Remarks


Yes No Y N

1 Site clearance completed?

2 Stripping of top soil completed?

3 Peg out limits of excavation.

4 Survey of cross-section of cut


completed?

5 Any utilities affected by excavation?

6 Any existing roads, footpaths, etc that


require temporary diversion?

7 Any existing drainage channel that


require temporary/permanent
diversion?

8 Stockpile of excavated materials at


required location?

9 Are excavated materials for


embankment approved for use?
( attach test results of materials
approved )

10 FINAL INSPECTION WITH COMMENTS P F Date:

Signed for Contractor Designation : Date :

Signed for SC Designation : Date :

Please  off where appropriate