PC-CL-12
Project: NH:37 Contract package – EW – II (AS-02/AS-18)
Rev. 0
Date
Received
Ref. RFI.
Checklist for : Prime Coating /Tack coating
No:
1 Equipment Check
a) Distributor
i) Heaters and pump in good working
condition?
ii) Pressure gauge or tachometer in order?
iii) Spray bar and nozzles in order?
2) Surface Preparation
a) Weather Okay?
b) Surface in order?
c) Width of surface to be coated check?
d) Area protected upon completion?
e) Surface is moist for Prime coat
f) Surface dry for Tack coat