Project: NH:37 Contract package – EW – II (AS-02/AS-18) Doc. no.

EW-CL-01
Rev. 0
Date
Received
Ref. RFI
Checklist for : Earthworks ( Site Clearance )
No.

Location : Other Information:

Item Description Con Con SC Remarks


Yes No Y N
1 Setting Out
a) Centre line pegs set out?
b) R.O.W. pegs set out?

2 Stripping Top Soil


a) Top soil stripped not exceeding 150 mm
thickness?
b) Top soil stockpiled for re-use?

3 Check For Any Existing Underground


And Overhead Services Obstruction

a) Electrical Cables
b) Telecom Cable
c) Water Pipelines
d) Other services…………………………..

4. Check For Any Existing Structures


a) Bridge
b) Culverts
c) Pipes
d) Kerbs
e) Others ……………………………………..

5. Disposal Of Materials
,a) Any materials dismantled that can be
re-used?
b) If Yes, are the materials stockpiled as
Required and location identified?

6. FINAL INSPECTION WITH COMMENTS P F Date:

Signed for Contractor Designation : Date :

Signed for SC Designation : Date :