Earth Pit Checklist

WeWork, Futura Pune

Client : Inspection Report No


Project Manager :
Consultant : Date
Package : Electrical Inspection Request No
Vendor : Date
Description of Work :
Wing : Dwg.Ref.No Rev : Inspection Request
Floor : BOQ Item No Inspected by By Time
Location Details :
Sl. No Description Yes No Remarks
1 Check the earth pit location
Chemical bags are in sealed condition and free from foreign
2 materials
3 Earthing Electrode:
3.1 a) Dia of Electrode
3.2 b) Length of Electrode
3.3 c) Fittings
4 Mat:
4.1 a) Type of Mat(GI/Cu)
4.2 b) Mat Dimension
4.3 c) Size of Strips used for Mat
5.0 Proper excavation/boring of the earth pit

6 Minimum Distance between two earthing pits are maintained

7 Adequate No of Chemical Bags used for the earth pit

Chemicals are poured in slurry form after insertion of the


8
electrode

9 Check the MAT is placed in proper depth

10 Chemical are poured surrounding the mat


11 Electordes are connected properly with the mat
12 Earthing strips connected properly with the electrode
Earth resistance values are as specified. Record
13 a) For individual earth pit = Ohm.
b) For Grid Earthing = Ohm.
Check and ensure that the earthing grids runs as per
14
specification
Observations if any :

The above works have been completed and checked and are ready for inspection

Vendor : CBRE : Client :


Signature : Signature : Signature :
Name : Name : Name :
Format No. F048-QC-Ch-217/Rev00/Apr2017

CBRE South Asia Pvt. Ltd. Project Management, India 1 of 1