Project Manager : Consultant : Date Package : Electrical Inspection Request No Vendor : Date Description of Work : Wing : Dwg.Ref.No Rev : Inspection Request Floor : BOQ Item No Inspected by By Time Location Details : Sl. No Description Yes No Remarks 1 Check the earth pit location Chemical bags are in sealed condition and free from foreign 2 materials 3 Earthing Electrode: 3.1 a) Dia of Electrode 3.2 b) Length of Electrode 3.3 c) Fittings 4 Mat: 4.1 a) Type of Mat(GI/Cu) 4.2 b) Mat Dimension 4.3 c) Size of Strips used for Mat 5.0 Proper excavation/boring of the earth pit
6 Minimum Distance between two earthing pits are maintained
7 Adequate No of Chemical Bags used for the earth pit
Chemicals are poured in slurry form after insertion of the
8 electrode
9 Check the MAT is placed in proper depth
10 Chemical are poured surrounding the mat
11 Electordes are connected properly with the mat 12 Earthing strips connected properly with the electrode Earth resistance values are as specified. Record 13 a) For individual earth pit = Ohm. b) For Grid Earthing = Ohm. Check and ensure that the earthing grids runs as per 14 specification Observations if any :
The above works have been completed and checked and are ready for inspection
Vendor : CBRE : Client :
Signature : Signature : Signature : Name : Name : Name : Format No. F048-QC-Ch-217/Rev00/Apr2017
CBRE South Asia Pvt. Ltd. Project Management, India 1 of 1