Project: NH:37 Contract package – EW – II (AS-02/AS-18) Doc. no.

SW-CL -35
Rev. 0
Date
Checklist I: for Fabrication of Steel Girder Received
(before drilling of holes) Ref. RFI.
No:

Location : Girder No:


Date : Item No:
Time :

Item Description CON CON SC Remarks


Y N Y N Y N
A) Materials Information

1 Are the materials test report available?


2 Is the grade of steel for all components as per
drawing ?

B) Visual Inspection of Raw Material


Are any of the following defects visible?
1 Cracks, Flows, Laps etc. visible
2 Blisters
3 Ragged
4 Lamination
5 Rusts
6 Pits

C) Cutting Tolerance For All Components (IRC


24, MORTH Cl. 1900, IS 7215)

Is the cutting dimensions of all components fall


1
within permissible tolerance?

D) Preparation of Girder

Are all the components fitted in its position as per


1
drawing ?
2 Is the length within permissible tolerance ?
3 Is the depth within permissible tolerance ?
4 Is the width within permissible tolerance ?
5 Is the deviation of centre line of web from centre line
of flanges in built-up members at contact surfaces
within permissible limit ?

6 Is the deviation from flatness of web plate of built-up


members within permissible limit ?
7 Is the tilt of flange plate within permissible limit ?
8 Is the squareness of ends within permissible limit ?

134
Project: NH:37 Contract package – EW – II (AS-02/AS-18) Doc. no. SW-CL -35
Rev. 0
Date
Checklist I: for Fabrication of Steel Girder Received
(before drilling of holes) Ref. RFI.
No:

9 Is the girder free from twist ?

Signed for contractor ________________________ Designation : ________________________ Date: ___________________

Signed for SC _______________________ Designation: _______________________ Date: ___________________

Location : Girder No:


Date : Item No:
Time :

Item Description CON CON SC Remarks


Y N Y N Y N

E Welding

Are welding of all components done as per


1
drawing ?
2 Has the weld any crack?

3 Has the weld any porosity undercut and craters ?


4 Are the weld profiles (sizes & shapes) in
accordance with IS : 9595 ?

5 Is the slag removed & defect repaired before laying


the second pass?

6 Is the DPT done occasionally (at random)?

7 Is the electrode used to approved specification?

Is the fabricated girder approved for next stage of


Yes No
operation?
135
Project: NH:37 Contract package – EW – II (AS-02/AS-18) Doc. no. SW-CL -35
Rev. 0
Date
Checklist I: for Fabrication of Steel Girder Received
(before drilling of holes) Ref. RFI.
No:

Signed for contractor ________________________ Designation : ________________________ Date: ___________________

Signed for SC _______________________ Designation: _______________________ Date: ___________________

136