You are on page 1of 1

CHINA CIVIL ENGINEERING CONSTRUCTION

Form: RQC-UT Rev: 0


CORPERATION
UT INSPECTION REPORT Job No.: WUC 023(2020)
Pipe No: O.D. Wall Length Report No.:
(mm) (mm) (mm)
Client : Project No. : Location :
Order / Drg. No : Mark / Item no: Material : Th:
Reference Procedure Specification:EN 583-1,-2,- Surface Condition : Surface Temp
3,-4,-5 ENV 583-6
Acceptance Criteria : Heat Treatment : BSR ASR Weld Process :
Equipment & Technique
Model : SL No: Manufacturer :
Couplant type : Cable Type :
Basic Calibration Block : V1(IIW) V2 (IIW) Calibration block :
Search Unit : Manufacture : Technique :
Probe Angle 0 45 60 70 Weld Joint Sketch
SL No
Dimension
Frequency
Sensitivity
Ref gain
Range
Calibration Sheet Attached : Yes No

Item / Mark Order No. Joint No. Welder ID Tested Length Evaluation Type/ Results Remarks
Length
No.

CP- Cluster Porosity CON – Concavity BSR – Before Stress Relief ASR – After Stress Relief
NDT Inspector Approved by Witnessed by
Name
Signature
Level
Date

You might also like