AmbujaNeotia DOC No: Checklist/Super-Structure/008 Revision Number: R2

Issue Date: 02/02/23 Revision Date: 02/02/23

Project – URVISHA (Newtown) Reference Pour Card No:


Contractor’s Name – S. M. NIRMAN

Check list for: REINFORCEMENT FOR CONCRETE WORK

Location: Date of Submission -


Ambuja
Pour segment Contractor. Neotia
Group. Date of Inspection -
Drawing No.: Rev.

ITEM DESCRIPTION YES NO YES NO REMARKS

1 Is the grade of steel reinforcement


according to the specification and GFC
drawing?
2 Whether the MTC of the reinforcement
bar is received and found ok?
3 Whether the Third Party test of
reinforcement bars have been carried out &
found satisfactory?
4 Are reinforcement bars free from rust oil,
admixtures and fractures?
5 Whether the reinforcement has been laid &
maintained in place as per GFC drawing?
6 Whether the placing of Stirrups at the
junction of Beam & Column and Beam to
Beam junction are found as per GFC
drawing?
7 Whether all reinforcement bars have been
tied with binding wire properly?
8 Does the lapping length & position found
as per GFC drawing?
9 Is there an adequate amount of dowel bars?

10 Whether the specified covers of steel bar


are found as per GFC drawing?
11 Is there adequate space between the
reinforcement bars for pouring concrete?
12 Whether the 'Bar Bending Schedule' has
been prepared & checked before placing of
concrete in position?
13 Is there a need for extra reinforcement at
corner and edges?
14 Is welding of steel reinforcement required?

15 Is the rejected steel removed from


construction site?

Signature of Contractor’s representative Signature of Employer representative


Date: Date: