The document is a checklist for formwork for cement concrete work for the Urvisha project in Newtown. It contains items to check such as the quality of formwork materials, dimensions and alignment as per drawings, treatment with release agents, rigidity during pouring, gaps, joints, and guidelines for formwork removal. The contractor and employer representatives are to sign off after inspection to confirm the formwork is satisfactory and meets requirements.
The document is a checklist for formwork for cement concrete work for the Urvisha project in Newtown. It contains items to check such as the quality of formwork materials, dimensions and alignment as per drawings, treatment with release agents, rigidity during pouring, gaps, joints, and guidelines for formwork removal. The contractor and employer representatives are to sign off after inspection to confirm the formwork is satisfactory and meets requirements.
The document is a checklist for formwork for cement concrete work for the Urvisha project in Newtown. It contains items to check such as the quality of formwork materials, dimensions and alignment as per drawings, treatment with release agents, rigidity during pouring, gaps, joints, and guidelines for formwork removal. The contractor and employer representatives are to sign off after inspection to confirm the formwork is satisfactory and meets requirements.
PROJECT- URVISHA (Newtown) Reference Pour Card No:
CONTRACTOR - S. M. NIRMAN Check list for: FORM WORK FOR CEMENT CONCRETE WORK
Location: Date of Submission -
Ambuja Contractor Neotia Group Date of Inspection- Drawing No. : Rev.
ITEM DESCRIPTION YES NO YES NO REMARKS
A1 Methodology & system of formwork has been duly approved by client? A1 Whether the all shuttering materials are of good quality & in good condition and as per relevant IS Code & client’s requirement? A2 Are there an adequate and satisfactory amount of false work, temporary supports, Shoring braces and ties? A3 Are the formwork structures adequate firm and rigid with Firm footing support? A4 Whether the shapes, lines, dimension, alignment have been checked and found as shown in GFC drawing? A5 Whether all Service cutout has been kept in place as per GFC drawing? A5 Whether the face of Form Work in contact with concrete has been cleaned & treated with 'Form Release Agent' prior to place reinforcement in position? A6 Whether the Formwork is sufficiently rigid during placing and compaction of concrete? A7 Are there any openings, gaps and spaces between forms? A8 Are there any provisions for construction joints? B1 Post Pour: Whether the removal of Formwork has been made satisfying the guide line as per IS -456. IS- 14687 or structural consultant? B2 Post Pour: Whether the proper sequence of removal of Formwork has been followed?
Signature of Contractor’s representative Signature of Employer representative