AmbujaNeotia DOC No: Checklist/Super-Structure/006 Revision Number: R2

Issue Date: 02/02/23 Revision Date: 02/02/23

PROJECT- URVISHA (Newtown) Reference Pour Card No:

CONTRACTOR - S. M. NIRMAN
Check list for: FORM WORK FOR CEMENT CONCRETE WORK

Location: Date of Submission -


Ambuja
Contractor Neotia
Group Date of Inspection-
Drawing No. : Rev.

ITEM DESCRIPTION YES NO YES NO REMARKS


A1 Methodology & system of formwork has
been duly approved by client?
A1 Whether the all shuttering materials are of
good quality & in good condition and as
per relevant IS Code & client’s
requirement?
A2 Are there an adequate and satisfactory
amount of false work, temporary supports,
Shoring braces and ties?
A3 Are the formwork structures adequate firm
and rigid with Firm footing support?
A4 Whether the shapes, lines, dimension,
alignment have been checked and found as
shown in GFC drawing?
A5 Whether all Service cutout has been kept in
place as per GFC drawing?
A5 Whether the face of Form Work in contact
with concrete has been cleaned & treated
with 'Form Release Agent' prior to place
reinforcement in position?
A6 Whether the Formwork is sufficiently rigid
during placing and compaction of concrete?
A7 Are there any openings, gaps and spaces
between forms?
A8 Are there any provisions for construction
joints?
B1 Post Pour: Whether the removal of
Formwork has been made satisfying the
guide line as per IS -456. IS- 14687 or
structural consultant?
B2 Post Pour: Whether the proper sequence
of removal of Formwork has been
followed?

Signature of Contractor’s representative Signature of Employer representative


Date: Date: