BAR BENDING SCHEDULE


Location-MLCP-2 Spacin 5th FLOOR to 6th FLOOR LVL COL Nos
Dia Break-up Total
S.l no Description of Bar of g @c/c Shape of Bar Total of Less Cutting 8 10 12 16 20
Nos of Bars Length
a b c d e f length Ben (mm) length
Bar (mm) (Mtr.)
1 16 3800 3800 d 0 3800 121.600 121.600
4 8
VERTICAL BAR in
1PC1,1PC4,1PC8,1P
C9 ,1PC22,1PC13,
1PC18, 1PC50
2 Column From 4th 16 3800 3800 0 3800 4 8 121.600 121.600
Floor to 5th Floor
level (+15000)

3 Stirrups from 8 250 670 170 670 170 80 80 1840 5 80 1760 13 8 183.040 183.040
(250*750)

4 8 250 234 170 234 170 80 80 968 5 80 888 13 8 92.352 92.352

VERTICAL BAR in
5 1PC2, 1PC3 Column 16 3800 3800 0 3800 4 2 30.400 30.400
From 4th Floor to
5th Floor level
(+15000)
12 3600 3600 3600 8 2 57.600 57.600

16 3800 3800 0 3800 8 1 30.400 30.400


VERTICAL BAR in
1PC10 Column From
4th Floor to 5th
Floor level (+15000) 12 3600 3600 3600 4 1 14.400 14.400

VERTICAL BAR in
1PC 15 & 16
6 Column From 4th 16 3800 3800 0 3800 8 2 60.800 60.800
Floor to 5th Floor
level (+15000)

VERTICAL BAR in
7 1PC 15 & 16 12 3600 3600 0 3600 4 2 28.800 28.800
Column From 4th
Floor to 5thFloor
level (+15000)
8

Stirrups For 1PC2 &


9 1PC3 (250*750) 2 8 175 670 170 670 170 80 80 1840 5 80 1760 18 2 63.360 63.360
Nos
10 8 175 143 170 143 170 80 80 785.6 5 80 705.6 36 2 50.803 50.803

11
Stirrups For 1PC10,
8 175 820 170 820 170 80 80 2140 5 80 2060 18 3 111.240 111.240
1PC15 & 16
(250*900) 3 Nos
12 8 175 175 170 175 170 80 80 849.6 5 80 769.6 36 3 83.117 83.117
2

Spacin Nos
Dia Break-up Total
S.l no Description of Bar of g @c/c Shape of Bar Total of Less Cutting 8 10 12 16 20
Nos of Bars Length
a b c d e f length Ben (mm) length
Bar (mm) (Mtr.)
13 16 3800 3800 d 0 3800 8 1 30.4 30.400
Vertical Bar in
1PC20 Column up
From 4th Floor to
14 5th Floor level 12 3600 3600 0 3600 4 1 14.4 14.400
(+15000)

Stirrup
15 (1000*250)@250 8 175 920 170 920 170 80 80 2340 5 80 2260 18 1 40.680 40.680
c/c

16 8 175 195 170 195 170 80 80 889.6 5 80 809.6 36 1 29.146 29.146

17 16 3800 3800 0 3800 8 1 30.4 30.400


Vertical Bar in
1PC11 ColumnFrom
4th Floor to 5th
18 Floor level (+15000) 12 3600 3600 0 3600 4 1 14.4 14.400

19 8 175 920 170 920 170 80 80 2340 5 80 2260 18 1 40.68 40.680


Stirrup(1000*250)
20 8 175 195 170 195 170 80 80 889.6 5 80 809.6 36 1 29.1456 29.146

21
22
Vertical Bar in
23 1PC14 Column From 16 3800 3800 0 3800 4 1 15.200 15.200
4th Floor to 5th
24 Floor level (+15000) 16 3800 3800 0 3800 4 1 15.200 15.200

25 8 250 700 170 700 170 80 80 1900 5 80 1820 13 1 23.660 23.660


Stirrup (250*750)
26 8 250 234 170 234 170 80 80 968 5 80 888 13 1 11.544 11.544

27
28 1PC 19 COL from
From 4th Floor to
29 5th Floor level 16 3800 3800 0 3800 4 1 15.200 15.200
(+15000)
30 12 3600 3600 0 3600 12 1 43.200 43.200

31 8 175 820 220 820 220 2080 5 80 2000 18 1 36 36.000


Stirrup (300*900)
32 8 175 127 220 127 220 693.714 5 80 613.714 54 1 33.140571 33.141

33
1PC 6 COLFrom 4th
34 Floor to 5thFloor 16 3800 3800 0 3800 10 1 38 38.000
level (+15000)
35 12 3600 3600 0 3600 6 1 21.6 21.600

36 stirrup (300*1000) 8 175 920 220 920 220 80 80 2440 5 80 2360 18 1 42.480 42.480
3

Spacin Nos
Dia Break-up Total
S.l no Description of Bar of g @c/c Shape of Bar Total of Less Cutting 8 10 12 16 20
Nos of Bars Length
a b c d e f length Ben (mm) length
Bar (mm) (Mtr.)
d
37 stirrup 8 175 313 170 313 170 80 80 1126.67 5 80 1046.67 18 1 18.840 18.840

38 Diamond Stirrup 8 175 220 230 230 80 80 840 4 64 776 36 1 27.936 27.936
39 link bar 8 175 220 80 80 380 2 48 332 18 1 5.976 5.976
40 16 3800 3800 0 3800 4 1 15.2 15.200
1PC 5
41 16 3800 3800 0 3800 4 1 15.2 15.200

42 8 175 670 170 670 170 80 80 1840 5 80 1760 18 1 31.680 31.680


Stirrup (250*750)
43 8 175 234 170 234 170 80 80 968 5 80 888 18 1 15.984 15.984

44 16 3800 3800 0 3800 4 2 30.4 30.400


1PC41 ,1PC33 COL
From 4th Floor to
5th Floor level
45 (+15000) 16 3800 3800 0 3800 4 2 30.4 30.400

stirrup (250*750)
46
cut of lvl -4.200 8 250 670 170 670 170 80 80 1840 5 80 1760 13 2 45.760 45.760

47 8 250 234 170 234 170 80 80 968 5 80 888 13 2 23.088 23.088

48 1PC 7 COL From 4th 16 3800 3800 1 32 3768 10 1 37.68 37.680


Floor to 5th Floor
49 level (+15000) 12 3600 3600 24 3576 6 1 21.456 21.456
1

50 stirrup (300*1000) 8 175 920 220 920 220 80 80 2440 5 80 2360 18 1 42.480 42.480

51 8 175 313 220 313 220 80 80 1226.67 5 80 1146.67 18 1 20.640 20.640

52 Diamond Stirrup 8 175 220 230 230 80 80 840 4 64 776 36 1 27.936 27.936
53 link bar 8 175 220 80 80 380 0 380 18 1 6.84 6.840
54
1PC 24COL
55 (300x750)From 4th 16 3800 3800 0 3800 4 1 15.2 15.200
Floor to 5th Floor
level (+15000)
56 12 3600 3600 0 3600 10 1 36 36.000

57 stirrup (300*750) 8 175 670 220 670 220 80 80 1940 5 80 1860 18 1 33.480 33.480

58 8 175 122 220 122 220 80 80 843.333 5 80 763.333 36 1 27.480 27.480

59 Link Bar 8 175 220 80 80 380 0 380 18 1 6.840 6.840


60

61 16 3800 3800 3800 7 1 26.600 26.600


1PC 23 COL
(350x975)From 4th
62 Floor to 5th Floor 16 3800 3800 3800 7 1 26.600 26.600
level (+15000)
63 12 3600 3600 0 3600 2 1 7.200 7.200
4

Spacin Nos
Dia Break-up Total
S.l no Description of Bar of g @c/c Shape of Bar Total of Less Cutting 8 10 12 16 20
Nos of Bars Length
a b c d e f length Ben (mm) length
Bar (mm) (Mtr.)
d
64 stirrup (350*975) 8 175 895 270 895 270 80 80 2490 5 80 2410 18 1 43.380 43.380

65 8 175 309 270 309 270 80 80 1318 5 80 1238 18 1 22.284 22.284


66 link bar 8 175 270 80 80 430 0 430 18 1 7.74 7.740
67 DIAMOND 8 175 230 270 230 80 80 890 4 64 826 36 1 29.736 29.736
68
69
1PC 25 & 26 COL
70 (250x1000)From 4th 16 3800 3800 0 3800 8 2 60.8 60.800
Floor to 5th Floor
level (+15000)
71 12 3600 3600 0 3600 4 2 28.8 28.800
72

73 stirrup (250*1000) 8 175 920 170 920 170 80 80 2340 5 80 2260 18 2 81.360 81.360

74 8 175 195 170 195 170 80 80 889.6 5 80 809.6 36 2 58.291 58.291


75
76 1PC 27 COL
(250x750)From 4th
77 Floor to 5th Floor 16 3800 3800 0 3800 4 1 15.200 15.200
level (+15000)
78 16 3800 3800 0 3800 4 1 15.200 15.200

stirrup (250*750)
79
cut of lvl (-4.200) 8 250 670 170 670 170 80 80 1840 5 80 1760 13 1 22.880 22.880

80 8 250 234 170 234 170 80 80 968 5 80 888 13 1 11.544 11.544

81
82 1PC 28 COL
(250x750)From 4th
83 Floor to 5th Floor 16 3800 3800 0 3800 8 1 30.400 30.400
level (+15000)
84 12 3600 3600 0 3600 2 1 7.200 7.200

85 stirrup (250*750) 8 175 670 170 670 170 80 80 1840 5 80 1760 18 1 31.680 31.680

86 8 175 343 170 343 170 80 80 1186 5 80 1106 18 1 19.908 19.908

87 Link Bar 8 175 170 80 80 330 330 18 1 5.94 5.940


88
89 1PC 29 COL 16 3800 3800 0 3800 8 1 30.400 30.400
(250x1200)From 4th
Floor to 5th Floor
90 level (+15000) 12 3600 3600 0 3600 8 1 28.800 28.800

stirrup (250*1200)
91
cut of lvl (-4.400) 8 175 1120 170 1120 170 80 80 2740 5 80 2660 18 1 47.880 47.880
5

Spacin Nos
Dia Break-up Total
S.l no Description of Bar of g @c/c Shape of Bar Total of Less Cutting 8 10 12 16 20
Nos of Bars Length
a b c d e f length Ben (mm) length
Bar (mm) (Mtr.)
d
92 8 175 329 170 329 170 80 80 1158.86 5 80 1079 54 1 58.258 58.258
93
1PC 30 & 38 COL
94 (250x1200)From 4th 16 3800 3800 0 3800 8 2 60.800 60.800
Floor to 5thFloor
level (+15000)
95 12 3600 3600 0 3600 10 2 72.000 72.000

96 8 250 1120 170 1120 170 80 80 2740 5 80 2660 13 1 34.580 34.580

stirrup (250*1200)
97
for 1PC30 8 250 288 170 288 170 80 80 1076 5 80 996 13 1 12.948 12.948

98 8 250 152 170 152 170 80 80 804 5 80 724 26 1 18.824 18.824

99 Link Bar 8 250 170 80 80 330 330 13 1 4.29 4.290

100 8 175 1120 170 1120 170 80 80 2740 5 80 2660 18 1 47.880 47.880

stirrup (250*1200)
101
for 1PC38 8 175 288 170 288 170 80 80 1076 5 80 996 18 1 17.928 17.928

102 8 175 152 170 152 170 80 80 804 5 80 724 36 1 26.064 26.064

103 Link Bar 8 175 170 80 80 330 330 18 1 5.94 5.940


104
105
1PC 31 COL
106 (250x1100)From 4th
107 Floor to 5th Floor 16 3800 3800 0 3800 30.400 30.400
level (+15000) 8 1
108 12 3600 3600 0 3600 6 1 21.600 21.600

stirrup (250*1100)
109
cut of lvl (-4.400) 8 175 1020 170 1020 170 80 80 2540 5 80 2460 18 1 44.280 44.280

110 8 175 181 170 181 170 80 80 862.667 5 80 782.667 36 1 28.176 28.176

111 Link Bar 8 175 170 80 80 330 330 18 4 23.76 23.760

112 1PC 34 COL 16 3800 3800 0 3800 4 1 15.200 15.200


(250x750)From 4th
Floor to 5th Floor
113 level (+15000) 16 3800 3800 0 3800 4 1 15.200 15.200

stirrup (250*750)cut
114
of lvl (-4.200) 8 250 670 170 670 170 80 80 1840 5 80 1760 13 1 22.880 22.880

115 8 250 234 170 234 170 80 80 968 5 80 888 13 1 11.544 11.544

116
6

Spacin Nos
Dia Break-up Total
S.l no Description of Bar of g @c/c Shape of Bar Total of Less Cutting 8 10 12 16 20
Nos of Bars Length
a b c d e f length Ben (mm) length
Bar (mm) (Mtr.)
d
1PC 35 From 4th
117 Floor to 5th Floor 16 3800 3800 1 32 3768 8 1 30.144 30.144
level (+15000)

1PC 35 From 4th


118
Floor to 5th Floor 12 3600 3600 1 24 3576 4 1 14.304 14.304
level (+15000)
1PC 36 fom 4th
119 Floor to 5th Floor 16 3800 3800 1 32 3768 4 1 15.072 15.072
level (+15000)

120 1PC 36 From 12 3600 3600 1 24 3576 8 1 28.608 28.608


4thFloor to 5th
Floor level (+15000)

121 stirrup For 1PC 35 8 175 820 170 820 170 80 80 2140 5 80 2060 18 1 37.080 37.080
(250*900) From 4th
Floor to 5th Floor
level (+15000)

122 8 175 175 170 175 170 80 80 849.6 5 80 769.6 36 1 27.706 27.706

stirrup For 1PC 36


123
(250*750) cut of lvl 8 175 670 170 670 170 80 80 1840 5 80 1760 18 1 31.68 31.680
(-4.200)

124 8 175 143 170 143 170 80 80 785.6 5 80 705.6 36 1 25.4016 25.402

125 16 3800 3800 0 3800 4 1 15.200 15.200


1PC 37 COL
126 (250x900)From 4th 12 3600 3600 0 3600 10 1 36.000 36.000
Floor to 5th Floor
127 level (+15000)
128

129 stirrup (250*900) 8 175 820 170 820 170 80 80 2140 5 80 2060 18 1 37.080 37.080

130 8 175 146 170 146 170 80 80 792 5 80 712 36 1 25.632 25.632

131 Link Bar 8 175 170 80 80 330 330 18 1 5.94 5.940


132 16 3800 3800 0 3800 4 1 15.2 15.200
1PC 42 COL
133 (250x750)From 4th 12 3600 3600 0 3600 8 1 28.8 28.800
Floor to 5th Floor
134 level (+15000)
135

136 stirrup (250*750) 8 175 670 170 670 170 80 80 1840 5 80 1760 18 1 31.680 31.680

137 8 175 143 170 143 170 80 80 785.6 5 80 705.6 36 1 25.4016 25.402
7

Spacin Nos
Dia Break-up Total
S.l no Description of Bar of g @c/c Shape of Bar Total of Less Cutting 8 10 12 16 20
Nos of Bars Length
a b c d e f length Ben (mm) length
Bar (mm) (Mtr.)
d
138 16 3800 3800 0 3800 8 1 30.400 30.400
1PC 43 COL
(300x900)From 4th
Floor to 5th Floor
139 level (+15000) 12 3600 3600 0 3600 6 1 21.600 21.600

140 stirrup (300*900) 8 175 820 170 820 170 80 80 2140 5 80 2060 18 1 37.080 37.080

141 8 175 148 170 148 170 80 80 796 5 80 716 36 1 25.776 25.776

142 Link Bar 8 175 220 80 80 380 380 18 1 6.84 6.840


143 16 3800 3800 0 3800 8 1 30.400 30.400
1PC 39 COL
(250x1100)From 4th
Floor to 5th Floor
144
level (+15000) 12 3600 3600 0 3600 6 1 21.600 21.600

145 stirrup (250*1100) 8 175 1020 170 1020 170 80 80 2540 5 80 2460 18 1 44.280 44.280

146 8 175 181 170 181 170 80 80 862.667 5 80 783 36 1 28.176 28.176

147 Link Bar 8 175 170 80 80 330 330 18 1 5.94 5.940

1PC 44 COL (250x900) 16 3800 3800 0 3800 8 1 30.4 30.400


148
From 4th Floor to
5th Floor level
149 (+15000) 12 3600 3600 0 3600 4 1 14.4 14.400

150 stirrup (250*900) 8 175 820 170 820 170 80 80 2140 5 80 2060 18 1 37.080 37.080

151 8 175 175 170 175 170 80 80 849.6 5 80 770 36 1 27.706 27.706

152 1PC 45 COL 16 3800 3800 1 32 3768 8 1 30.144 30.144


(300x1000) From 4th
Floor to 5th Floor
153 level (+15000) 12 3600 3600 1 24 3576 8 1 28.608 28.608

154 stirrup (300*1000) 8 175 920 220 920 220 80 80 2440 5 80 2360 18 1 42.480 42.480
155 8 175 143 220 143 220 80 80 886.286 5 80 806 54 1 43.539 43.539
156 1PC 47 COL 16 3800 3800 0 3800 4 1 15.2 15.200
(300x750)from 4th
Floor top to 5th Floor
157 lvl top (+15000) 12 3600 3600 0 3600 10 1 36 36.000

158 stirrup (300*750) 8 175 670 220 670 220 80 80 1940 5 80 1860 18 1 33.480 33.480

159 8 175 121 220 121 220 80 80 842 5 80 762 36 1 27.432 27.432
160 Link Bar 8 175 220 80 80 380 380 18 1 6.84 6.840
161 16 3800 3800 0 3800 8 1 30.400 30.400
1PC 48 COL
(250x1000)From 4th
Floor to 5thFloor
level (+15000)
8

Spacin Nos
Dia Break-up Total
S.l no Description of Bar of g @c/c Shape of Bar Total of Less Cutting 8 10 12 16 20
Nos of Bars Length
a b c d e f length Ben (mm) length
1PC 48 COL Bar (mm) (Mtr.)
(250x1000)From 4th d
Floor to 5thFloor
162 level (+15000) 12 3600 3600 0 3600 4 1 14.400 14.400

163 stirrup (250*1000) 8 175 920 170 920 170 80 80 2340 5 80 2260 18 1 40.680 40.680

164 8 175 195 170 195 170 80 80 889.6 5 80 810 36 1 29.146 29.146

165
1PC 49 COL
16 3800 3800 0 3800 8 1 30.4 30.400
(250x1000)From 4th
Floor to 5th Floor
166 level (+15000) 12 3600 3600 0 3600 6 1 21.6 21.600

167 stirrup (250*1000) 8 175 920 170 920 170 80 80 2340 5 80 2260 18 1 40.680 40.680

168 8 175 165 170 165 170 80 80 829.333 5 80 749 36 1 26.976 26.976

169 Link Bar 8 175 170 80 80 330 330 18 1 5.94 5.940


170 16 3800 3800 0 3800 8 1 30.4 30.400
1PC 32, COL
(250x1100)From 4th
171 Floor to 5th Floor 12 3600 3600 0 3600 6 1 21.6 21.600
level (+15000)

172 stirrup (250*1100) 8 175 1020 170 1020 170 80 80 2540 5 80 2460 18 1 44.280 44.280

173 8 175 181 170 181 170 80 80 862.667 5 80 783 36 1 28.176 28.176

174 Link Bar 8 175 170 80 80 330 330 18 1 5.94 5.940


175 16 3800 3800 0 3800 8 1 30.400 30.400
1PC 40 COL
(250x1000From 4th
Floor to 5th Floor
176 level (+15000) 12 3600 3600 0 3600 6 1 21.600 21.600

177 stirrup (250*1100) 8 175 1020 170 1020 170 80 80 2540 5 80 2460 18 1 44.280 44.280

178 8 175 181 170 181 170 80 80 862.667 5 80 783 36 1 28.176 28.176

179 Link Bar 8 175 170 80 80 330 330 18 1 5.94 5.940


180 1PC 21,COL 16 3800 3800 0 3800 4 1 15.200 15.200
(300x900)From 4th
Floor to 5th Floor
181 level (+15000) 12 3600 3600 0 3600 12 1 43.200 43.200

182 stirrup (300*900) 8 175 820 220 820 220 80 80 2240 5 80 2160 18 1 38.880 38.880

183 8 175 127 220 127 220 80 80 853.714 5 80 774 54 1 41.781 41.781
9

Spacin Nos
Dia Break-up Total
S.l no Description of Bar of g @c/c Shape of Bar Total of Less Cutting 8 10 12 16 20
Nos of Bars Length
a b c d e f length Ben (mm) length
Bar (mm) (Mtr.)
d
184 1PC 12,COL 16 3800 3800 0 3800 8 1 30.4 30.400
(300x900)From 4th
Floor to 5th Floor
185 level (+15000) 12 3600 3600 0 3600 6 1 21.6 21.600

186 stirrup (300*900) 8 175 820 220 820 220 80 80 2240 5 80 2160 18 1 38.880 38.880

187 8 175 148 220 148 220 80 80 896 5 80 816 36 1 29.376 29.376
188 Link Bar 8 175 220 80 80 380 380 18 1 6.84 6.840
189 16 3800 3800 0 3800 4 1 15.200 15.200
1PC 17,COL
(300x750)From 4th
Floor to 5th Floor
190 level (+15000) 12 3600 3600 0 3600 10 1 36.000 36.000

191 stirrup (300*750) 8 175 670 220 670 220 80 80 1940 5 80 1860 18 1 33.480 33.480

192 8 175 121 220 121 220 80 80 842 5 80 762 36 1 27.432 27.432
193 Link Bar 8 175 220 80 80 380 380 18 1 6.84 6.840

194
1PC 51 COL 16 3800 3800 0 3800 4 1 15.200 15.200
(250x750)From 4th
Floor to 5th Floor
195 level (+15000) 16 3800 3800 0 3800 4 1 15.200 15.200

196 16 3800 3800 0 3800 4 1 15.200 15.200


1PC 54 COL
(250x750)From 4th
Floor to 5th Floor
197 level (+15000) 16 3800 3800 0 3800 4 1 15.200 15.200

198 8 250 670 170 670 170 80 80 1840 5 80 1760 13 2 45.760 45.760
1PC 51 & 54 stirrup
(250*750)
199 8 250 234 170 234 170 80 80 968 5 80 888 13 2 23.088 23.088

200
1PC 52 COL
201 (300x1000)From 4th 16 3800 3800 0 3800 4 1 15.200 15.200
Floor to 5th Floor
level (+15000)
202 12 3600 3600 0 3600 16 1 57.600 57.600

203 stirrup (300*1000) 8 175 920 220 920 220 80 80 2440 5 80 2360 18 1 42.480 42.480

204 8 175 112 220 112 220 80 80 824.889 5 80 745 72 1 53.632 53.632

205 1PC 53 COL 16 3800 3800 0 3800 8 1 30.400 30.400


(300x1000From 4th
Floor to 5th Floor
206 level (+15000) 12 3600 3600 0 3600 10 1 36.000 36.000
10

Spacin Nos
Dia Break-up Total
S.l no Description of Bar of g @c/c Shape of Bar Total of Less Cutting 8 10 12 16 20
Nos of Bars Length
a b c d e f length Ben (mm) length
Bar (mm) (Mtr.)
d
207 stirrup (300*1000) 8 175 920 220 920 220 80 80 2440 5 80 2360 18 1 42.480 42.480

208 8 175 238 220 238 220 80 80 1076 5 80 996 18 1 17.928 17.928

209 8 175 127 220 127 220 80 80 854 5 80 774 72 1 55.728 55.728

210 Link Bar 8 175 220 80 80 380 380 18 1 6.840 6.840


211 1PC 55 & 58 COL 16 3800 3800 0 3800 4 2 30.400 30.400
(250x750)From 4th
Floor to 5th Floor
212 level (+15000) 16 3800 3800 0 3800 4 2 30.400 30.400

stirrup (250*750)cut
213
of lvl (-4.200) 8 250 670 170 670 170 80 80 1840 5 80 1760 13 2 45.760 45.760

214 8 250 234 170 234 170 80 80 968 5 80 888 13 2 23.088 23.088

215
216 1PC 56 COL 16 3800 3800 0 3800 4 1 15.200 15.200
(250x750)From 2 nd
Floor to 3rd Floor
217
level (+9000) 12 3600 3600 0 3600 8 1 28.800 28.800
218
219

220 1PC 57 COL 16 3800 3800 0 3800 4 1 15.200 15.200


(250x750)From 2 nd
Floor to 3rd Floor
221 level (+9000) 12 3600 3600 0 3600 8 1 28.800 28.800
222

stirrup (250*750)
223
FOR 1PC56 8 175 670 170 670 170 80 80 1840 5 80 1760 18 1 31.680 31.680

224 8 175 143 170 143 170 80 80 785.6 5 80 706 36 1 25.402 25.402

stirrup (250*750)
225
FOR 1PC57 8 175 670 170 670 170 80 80 1840 5 80 1760 18 1 31.680 31.680

226 8 175 143 170 143 170 80 80 785.6 5 80 706 36 1 25.402 25.402

227

228 20 4000 4000 1 40 3960 4 1 15.84 15.840


1P LW1 COL
229 (250x2050)from 4th 16 3800 3800 1 32 3768 14 1 52.752 52.752
Floor top to 5th Floor
230 lvl top (+15000) 10 3500 3500 1 20 3480 6 1 20.88 20.880
231
11

Spacin Nos
Dia Break-up Total
S.l no Description of Bar of g @c/c Shape of Bar Total of Less Cutting 8 10 12 16 20
Nos of Bars Length
a b c d e f length Ben (mm) length
Bar (mm) (Mtr.)
d
Stirrup Main
232
(650*250) 12 75 610 170 610 170 120 120 1800 5 120 1680 42 1 70.560 70.560

Stirrup Main
233
(650*250) 8 75 161 170 161 170 80 80 821 5 80 741 42 1 31.122 31.122

Stirrup Main
234
(525*250) 12 75 485 170 485 170 120 120 1550 5 120 1430 42 1 60.060 60.060

Stirrup Main
235
(525*250) 8 75 167 170 167 170 80 80 834 5 80 754 42 1 31.668 31.668

236 8 150 600 600 0 368 368 1936 0 1936 21 1 40.656 40.656
stirrup for mid main
link
237 8 150 310 170 310 170 80 80 1120 5 80 1040 21 1 21.840 21.840

238 Link Bar 8 150 150 80 80 310 0 310 21 1 6.510 6.510

239 16 4600 4600 1 32 4568 4 1 18.272 18.272

240 1P LW2COL 12 4200 4200 1 24 4176 18 1 75.168 75.168


(200x1775)from 4th
Floor top to 5th Floor
241 lvl top (+15000) 10 3500 3500 1 20 3480 6 1 20.880 20.880

242

Stirrup Main
243
(650*200) 12 75 610 120 610 120 120 120 1700 5 120 1580 42 1 66.360 66.360

Stirrup Main
244
(650*200) 8 75 302 120 302 120 80 80 1004 5 80 924 42 1 38.808 38.808

Stirrup Main
245
(525*250) 12 75 481 120 481 120 120 120 1442 5 120 1322 42 1 55.524 55.524

Stirrup Main
246
(525*250) 8 75 239 120 239 120 80 80 877 5 80 797 42 1 33.474 33.474

247 Link Bar 8 75 120 80 80 280 0 280 42 2 23.520 23.520


stirrup for mid main
248
link 8 200 850 850 0 368 368 2436 0 2436 16 1 38.976 38.976

stirrup for mid main


249
link 8 200 435 120 435 120 80 80 1270 5 80 1190 16 1 19.040 19.040

250 Link Bar 8 200 120 80 80 280 0 280 16 1 4.480 4.480


251 20 4000 4000 1 40 3960 4 1 15.84 15.840
1P LW3 COL
(250x2050)from 4th
252 Floor top to 5th Floor 16 3800 3800 1 32 3768 14 1 52.752 52.752
lvl top (+15000)
253 10 3500 3500 1 20 3480 6 1 20.88 20.880
Stirrup Main
254
(650*250) 12 75 610 170 610 170 120 120 1800 5 120 1680 42 1 70.560 70.560
12

Spacin Nos
Dia Break-up Total
S.l no Description of Bar of g @c/c Shape of Bar Total of Less Cutting 8 10 12 16 20
Nos of Bars Length
a b c d e f length Ben (mm) length
Bar (mm) (Mtr.)
Stirrup Main d
255
(650*250) 8 75 161 170 161 170 80 80 821 5 80 741 42 1 31.122 31.122

Stirrup Main
256
(525*250) 12 75 485 170 485 170 120 120 1550 5 120 1430 42 1 60.060 60.060

Stirrup Main
257
(525*250) 8 75 167 170 167 170 80 80 834 5 80 754 42 1 31.668 31.668

stirrup for mid main


258
link 8 150 600 600 0 368 368 1936 0 1936 21 1 40.656 40.656

259 middle hook 8 150 170 80 80 330 0 330 21 1 6.930 6.930


260 16 3800 3800 1 32 3768 10 1 37.68 37.680
1P LW4 COL
261 (250x3900)from 4th 16 3800 3800 1 32 3768 10 1 37.68 37.680
Floor top to 5th Floor
262 lvl top (+15000) 12 3600 3600 1 24 3576 16 1 57.216 57.216
263
Stirrup Main
264
(775*250) 12 75 733 170 733 170 120 120 2046 5 120 1926 42 1 80.892 80.892

Stirrup Main
265
(775*250) 8 75 129 170 129 170 120 120 838.333 5 80 758 42 2 63.700 63.700

Stirrup Main
266
(775*250) 12 75 733 170 733 170 120 120 2046 5 120 1926 42 1 80.892 80.892

Stirrup Main
267
(775*250) 8 75 129 170 129 170 120 120 838.333 5 80 758 42 2 63.700 63.700

stirrup for mid main


268
link 8 125 2350 2350 0 368 368 5436 0 5436 25 1 135.900 135.900

stirrup for mid other


269
link 8 125 245 170 245 150 80 80 970 5 80 890 25 4 89.000 89.000

4307.012 62.640 1655.868 1771.376 31.680

U/W As Per Dia Wise 0.381 0.597 0.864 1.533 2.436


Total Weight As Per Dia Wise (MT) 1.641 0.037 1.431 2.716 0.077
Cummulative Total (MT) 5.902
13

MEASURMENT SHEET OF 3rd R-A & Final BILL


SLNO. Description of Item UOM NO. LENGTH BREADTH HEIGHT QUANTITY REMARKS

4 PCC (1:3:6)
for - 2 Pile Cap CUM 22 1.310 2.600 0.100 7.493

for Podium 2 pile cap CUM 17 1.335 2.200 0.100 4.993

for 3 pile cap CUM 16 4.570 0.080 5.850

for 4 pile cap CUM 16 2.600 2.600 0.080 8.653

for P5 pile cap CUM 2 2.600 3.700 0.100 1.924

P7 Pile Cap CUM 1 50.947 0.090 4.585

Podium Pile Cap infront of P7 Cap CUM 1 1.466 2.600 0.075 0.286

P-5 & P-6 Portion Cap inbetwwen P-7 to P-4


CUM 6 1.407 2.700 0.075 1.710
Cap

P7 Pile Cap CUM 1 1.235 1.235 0.075 0.114

P4 Pile Cap (Towards Promamed Block) ) CUM 1 43.196 0.100 4.320

PB Beam PCC CUM

PB-18 & PB-19 CUM 1 23.752 0.085 2.019

Less for podi 2 pile cap 1 no CUM 1 0.835 2.200 0.085 -0.156

PB-20 CUM 1 9.327 0.085 0.793

PB-140,PB-139, PB-138, PB-137, PB-136, PB-


CUM 1 77.211 0.085 6.563
135 & PB-134

Less for podi 2 pile cap 6 nos CUM -6 0.835 2.200 0.085 -0.937

PB-151 to PB-149 CUM 1 23.443 0.085 1.993

Less for 2 pile cap 2 nos CUM -2 0.910 2.200 0.085 -0.340

PB-21 to PB-22 CUM 1 27.788 0.085 2.362 B


Less for 3 pile cap 2 nos CUM -2 3.015 0.085 -0.513

PB-23 CUM 1 3.167 0.085 0.269

PB-173 CUM 1 4.609 0.085 0.392


PB-187,186 , 185 & 184 23.688 0.085 2.013
CUM 1
less for 2 pile cap portion 1.162 0.085 -0.395
CUM -4
PB-183 6.942 0.085 0.590
CUM 1
less for 2 pile cap portion 1.162 0.085 -0.099
CUM -1
PB-24 CUM 1 4.094 0.085 0.348

PB-28-29 & 30 CUM 1 47.758 0.085 4.059

Less for 4 pile cap 2 nos CUM -2 2.200 2.200 0.085 -0.823

PB-40 CUM 1 6.987 0.085 0.594

PB-41 CUM 1 6.109 0.085 0.519

PB-42 CUM 1 6.143 0.085 0.522

PB-43 CUM 1 8.212 0.085 0.698

PB-148 to 147 CUM 1 14.174 0.085 1.205

less for 2 pile cap 1 no CUM -1 2.002 0.085 -0.170

PB-160 to 158 CUM 1 17.619 0.085 1.498

less for 3 pile cap CUM -2 3.015 0.085 -0.513


14

MEASURMENT SHEET OF 3rd R-A & Final BILL


SLNO. Description of Item UOM NO. LENGTH BREADTH HEIGHT QUANTITY REMARKS

PB-166 to 165 CUM 1 14.960 0.085 1.272

less for 4 pile cap 1 no CUM -1 4.840 0.085 -0.411

PB-56 CUM 1 12.331 0.085 1.048

PB-64 CUM 1 12.107 0.085 1.029

PB-57 CUM 1 6.943 0.085 0.590

PB-65 CUM 1 6.862 0.085 0.583

PB-164 CUM 1 6.961 0.085 0.592

PB-74 CUM 1 6.286 0.085 0.534

PB-75 CUM 1 3.053 0.085 0.260

PB-76 CUM 1 4.791 0.085 0.407

PB-157 CUM 1 12.320 0.085 1.047

PB-146 CUM 1 14.292 0.085 1.215

PB-145 to PB-141 CUM 1 55.408 0.085 4.710

less for 2 pile cap 4 nos CUM -4 2.002 0.085 -0.68068

PB-156 to PB-153 CUM 1 32.999 0.085 2.804915

less for 3 pile cap 3 nos CUM -3 3.015 0.085 -0.768825

PB-163 to PB-161 CUM 1 45.167 0.085 3.839195

less for 4 pile cap 2 nos CUM -2 4.840 0.085 -0.8228

PB-169 to PB-167 CUM 1 46.212 0.085 3.92802

less for 4 pile cap 2 nos CUM -2 4.840 0.085 -0.8228

PB-172 to PB-170 CUM 1 46.445 0.085 3.947825

less for 4 pile cap 2 nos CUM -2 4.840 0.085 -0.8228


PB-182 to PB-180 Beside of STP
CUM 1
26.182 0.085 2.22547

less for P2 cap


CUM -2
1.162 0.085 -0.19754

PB-77 to PB-80 CUM 1 38.122 0.085 3.24037

less for 3 pile cap 2 nos CUM -2 3.015 0.085 -0.51255

less for 2 pile cap 1 no CUM -1 2.002 0.085 -0.17017

PB-81 CUM 1 4.930 0.085 0.419


PB-179 beside of STP 4.422 0.085 0.376
CUM 1
PB-178 beside of STP 2.184 1.425 0.085 0.265
CUM 1
PB-82 CUM 1 4.537 0.085 0.386

PB-83 CUM 1 8.621 0.085 0.733

PB-84 CUM 1 18.369 0.085 1.561

PB-85 CUM 1 13.224 0.085 1.124

PB-86 CUM 1 6.852 0.085 0.582

PB-87 to PB-89 CUM 1 38.620 0.085 3.283

Sump & Sump portion Beam CUM 1 1.500 1.500 0.080 0.180

for beam PB-189 CUM 1 4.890 0.700 0.080 0.274

Less for sump portion CUM -1 1.500 0.250 0.080 -0.030

for beam PB-177 CUM 1 5.514 0.850 0.080 0.375


15

MEASURMENT SHEET OF 3rd R-A & Final BILL


SLNO. Description of Item UOM NO. LENGTH BREADTH HEIGHT QUANTITY REMARKS

Less for sump portion CUM -1 1.500 0.250 0.080 -0.030

PB-133 to PB-128 CUM 1 75.165 0.080 6.013

less for Podium 2 pile cap CUM -5 1.831 0.080 -0.732

PB-117 to PB-135 CUM 1 42.477 0.080 3.398

less for 2 pile cap CUM -2 2.312 0.080 -0.370

PB-114 towards N Block CUM 1 7.450 0.080 0.596

PB-121 towards L Block CUM 1 7.512 0.080 0.601

PB-63 to 62 (towards L Block) CUM 1 22.220 0.080 1.778

less for podium 2 pile cap CUM -1 1.832 0.080 -0.147

PB-120 in P7 Cap Portion CUM 1 1.356 0.080 0.108

PB-119 in P7 Cap Portion CUM 1 3.300 0.080 0.264

PB-118 in P7 Cap Portion CUM 1 2.699 0.080 0.216

PB-108 to PB-105 CUM 1 20.921 0.080 1.674

Less for Cap CUM -1 1.960 0.080 -0.157

Less for Cap CUM -1 0.763 0.080 -0.061

Less for Cap CUM -1 0.852 0.080 -0.068

PB-112 (towards P4 Cap) CUM 1 4.583 0.080 0.367

PB-112A (Towards Promenade Block) CUM 1 10.059 0.080 0.805

PB-103 (Towards Promenade Block) CUM 1 1.076 0.080 0.086

Under Raft Portion PCC CUM


S5 infront of L Block CUM 1 44.094 0.080 3.528

S5 infront of M Block CUM 1 97.606 0.080 7.808

S3 Infront of PB-19 & PB-173 CUM 1 34.196 0.080 2.736

S2 Infront of PB-21 to PB-24 CUM 1 55.258 0.080 4.421

S2 Infront of PB-28 to PB-30 CUM 1 70.571 0.080 5.646

S2 Infront of PB-139 to PB-130 CUM 1 146.599 0.080 11.728

S2 Infront of PB-148 to PB-147 CUM 1 29.556 0.080 2.364

S2 Infront of PB-146 to PB-142 CUM 1 53.920 0.080 4.314

S3 Infront of PB-160 to PB-158 CUM 1 43.592 0.080 3.487

S2 Infront of PB-146 to PB-142 CUM 1 53.920 0.080 4.314

S3 Infront of PB-161 to PB-163 & 157 to 153 CUM 1 92.375 0.080 7.390

S2 Infront of PB-167 to PB-169 CUM 1 49.541 0.080 3.963

S2 Infront of PB-172 to PB-170 CUM 1 42.961 0.080 3.437

S2 Infront of PB-182 to PB-180 CUM 1 43.717 0.080 3.497

S5 Infront of PB-77 to PB-80 CUM 1 59.331 0.080 4.746

S5 Infront of PB-81 CUM 1 9.440 0.080 0.755

S2 Infront of PB-84 to PB-85 CUM 1 29.295 0.080 2.344


16

MEASURMENT SHEET OF 3rd R-A & Final BILL


SLNO. Description of Item UOM NO. LENGTH BREADTH HEIGHT QUANTITY REMARKS

S2 Infront of PB-83 CUM 1 29.685 0.080 2.375

S1 Infront of PB-86 to PB-89 CUM 1 143.824 0.080 11.506

S2 Infront of PB-108 to PB-105 CUM 1 74.845 0.080 5.988

S1 Infront of Marina Block CUM 1 30.244 0.080 2.420

S4 Infront of P7 Cap CUM 1 12.316 0.080 0.985

S2 Infront of P7 Cap CUM 1 6.604 0.080 0.528

S2 Infront of P7 Cap CUM 1 6.486 0.080 0.519

S2 Infront of P4 Cap CUM 1 12.406 0.080 0.992

S2 Infront of P4 Cap CUM 1 6.458 0.080 0.517

S5 Infront of PB-121 to PB-118 CUM 1 43.071 0.080 3.446

S5 Infront of PB-118 to PB-112 CUM 1 121.849 0.080 9.748

Total Certified Qty CUM 229.850


Total Previous Bill Released Qty CUM 208.358
So, This Bill Qty CUM 21.492
17

Reconciliation Sheet for Reinforcement Steel up to 11-11-2020 WO.NO:- WO/SELV/MLCP - 2/14


LN MULTIPLEX PVT LTD

Sl. No. Description Unit


Diameter of Reinforcement Steel Total Remarks
8 Tor 10 Tor 12 Tor 16 Tor 20 Tor 25 Tor 32 Tor

A.
Received Qty From Store Up to MT 66.211 96.320 20.575 46.294 22.757 33.657 3.144 288.958
11.11.20

B.
Up to Previous Bill Consumed
Quantity (Billed Qty)
MLCP-2
1 Super-Structure
Up to Previous Bill Consumption Qty (in
W.O .NO-MLCP-2/14)
Up to 1st R/A Bill Consumption Qty MT 27.294 39.965 4.520 18.284 11.651 11.939 1.053 114.706
(B)

2nd R-A Bill Consumption for 3rd to


4th floor lvl Col, Beam & Slab Qty (B)
MT 9.107 13.310 2.023 6.328 2.395 3.513 0.348 37.024

3rd RA Bill Consumtion Qty for(4th


Floor lvl to 5th Floor lvl Col, Beam & MT 8.373 12.447 2.176 6.375 2.690 4.062 0.348 36.471
Slab )

Up to Previous Bill Total Consumed


Quantity (Billed Qty)
MT 44.774 65.722 8.719 30.987 16.736 19.514 1.749 188.201

This Bill Consumption Qty for 5th Floor to MT 8.376 12.587 2.170 6.375 2.690 4.062 0.348 36.608
6th Floor Lvl Col, Beam , Slab

Un-billed Qty for G. Floor to 6th Floor Lvl MT 1.578 2.300 3.900 0.000 0.000 0.700 0.000 8.478
Tie Rod for Col, Beam , Ramp Wall & Stair

W.I.P For 6th Floor lvl to 7th Floor lvl Col, MT 7.900 10.800 2.270 6.375 2.690 4.062 0.348 34.445
Beam & Slab

Total (Consumption, Un-billed Qty & Wip )


D=(A+B+C)
MT 62.628 91.409 17.059 43.737 22.116 28.338 2.445 267.732

Physical Stock in Steel Yard(Usable Stock) © MT 2.450 2.500 2.900 0.900 0.300 3.435 0.615 13.100

Total (Consumption, Un-billed Qty,Wip &


Physical stock ) D=(A+B+C)
MT 65.078 93.909 19.959 44.637 22.416 31.773 3.060 280.832

Signature of Contractor Siddha At Store Engineer At Siddha


18

WESTAGE (MT) MT 1.133 2.411 0.616 1.657 0.341 1.884 0.084 8.126

WESTAGE %(Scrap+normal) 1.741 2.567 3.086 3.712 1.521 5.930 2.745


ALLOWABLE WESTAGE % (Scrap+normal) As Per
W.O. 3.000 3.000 3.000 3.000 3.000 3.000 3.000
Scrap 2% MT

Signature of Contractor Siddha At Store Engineer At Siddha


RECONCILIATION STATEMENT AT BONHOOGLY, BLOCK-MLCP-2 UP TO 15.11.2020 WO .NO:-WO/SELV/MLCP 2-7/1 (SUB-STRUCTURE)
Sika
(Sika Sikha Sikha Thermocol
Fly Ash Fly ash Brick Sika Top Micro
Sl No Block Item Consumed Cement (Bags) Sand (MT) Stone Chips (MT) Latex-) in Nitobond Hybond (25 mm
(Bags) (Nos) 122 (kg) Crete-4
Ltr (kg) (kg) thk) Pcs
(bags)
Medium
Qty PPC OPC PSC F.C. SAND 20 mm 10 mm
(Zone-III)
R.C.C (1:1:2) Pile Rebulting
(CUM) 2.610 19.837 1.965 1.5408 1.0258
R.C.C M30 (PPC) (CUM)
R.C.C M25 (RMC) (CUM)
P.C.C (1:3:6) (CUM) 85.060 374.264 0.000 57.330 110.578
MLCP- P.C.C (1:3:6) (CUM) 144.358 193.398 441.778 97.297 202.101
1
2
BRICK WORK (230MM) 1:6 9.503 15.062 4.552 3886.73
(CUM)
BRICK WORK (230MM) 1:6 3.000 4.755 1.437 1227.00
(CUM)
BRICK WORK (110MM) 1:4 605.613 151.403 57.500 93.90325 36.337 32703.10
(SQM)
BRICK WORK (110MM) 1:4 50.000 12.500 3.000 2700.00
(SQM)
Plastering Work (10 33.750 2.893 0.742
mm)1:4
18.720 2.460 0.599
Plastering Work (15mm)1:6

BRICK WORK (230MM) 1:6 2.270 3.598 1.087 928.43


(CUM) G.Floor Portion
Basement Col -Beam &
Drain Repearing work 28.000 1.500 2.100
purpose
wall & col hole packing
work 15.000 0.500

Cement Slurry for Concre


Pouring Purpose 5.000

For Cover Block


(50x50x50) (1:1) for
Foundation , Cap, Raft, 1.458 11.083333 1.098
Beam

For Cover Block


(50x50x48) (1:1) for Col 2.784 21.158 2.096

For Cover Block


(50x50x30) (1:1) for wall 0.076 0.3355 0.057

For Cover Block


(50x50x40) (1:1) for Lift 0.288 1.26555 0.217
Wall

TOTAL BILLED CONSUMPTION (A) RMC 364.638 175.856 914.700 0.000 0.000 209.816 314.220 3.126 41445 0

Un-Billed Qty & WIP Consumption(B) 0

TOTAL CONSUMPTION (A+B) 364.638 175.856 914.700 0.000 0.000 209.816 314.220 3.126 41445.259

Signature of Contractor Siddha At Store Engineer At Siddha


RECONCILIATION STATEMENT AT BONHOOGLY, BLOCK-MLCP-2 UP TO 15.11.2020 WO .NO:-WO/SELV/MLCP 2-7/1 (SUB-STRUCTURE)
Sika
(Sika Sikha Sikha Thermocol
Fly Ash Fly ash Brick Sika Top Micro
Sl No Block Item Consumed Cement (Bags) Sand (MT) Stone Chips (MT) Latex-) in Nitobond Hybond (25 mm
(Bags) (Nos) 122 (kg) Crete-4
Ltr (kg) (kg) thk) Pcs
(bags)
Medium
Qty PPC OPC PSC F.C. SAND 20 mm 10 mm
(Zone-III)

TOTAL ISUED BY STORE UP TO 31/10/2019 0 365 180 936 0 0 240.836 318.730 3.450 43000 60 28 31.6 129 210 7

WASTAGE 0 0.362 4.144 21.300 0.000 0.000 31.020 4.510 0.324 1554.741 60.000
WESTAGE % 0.099 2.302 2.276 12.880 1.415 9.397 3.616 100.000
ALLOWABLE WASTAGE % 2.00 3.000 3.00 3.00 15.00 15.00 10.00 10.00 5.00

Signature of Contractor Siddha At Store Engineer At Siddha


RECONCILIATION STATEMENT AT BONHOOGLY, BLOCK-MLCP-2 UP TO 15.11.2020 WO .NO:-WO/SELV/MLCP -2/14
Sika
Fly Ash Fly ash Brick
Sl No Block Item Consumed Cement (Bags) Sand (MT) Stone Chips (MT) Micro
(Bags) (Nos)
Crete-4
Medium
Qty PPC OPC PSC F.C. SAND 20 mm 10 mm
(Zone-III)
For Cover Block
(50x50x40) (1:1) 1.500 11.400 1.130

For Cover Block


(50x50x30) (1:1) 1.200 9.120 0.904

For Cover Block


(50x50x20) (1:1) 0.900 6.840 0.678

TOTAL BILLED CONSUMPTION (A) 18.240 0.000 9.120 0.000 0.000 2.711 0.000 0.000 0 0
Un-Billed Qty & WIP (B) 23.000 0.000 82.000 0.000 0.000 14.000 0.000 1.000 7200 4
TOTAL CONSUMPTION +UNBILLED & W.I.P
Qty(A+B) 41.240 0.000 91.120 0.000 0.000 16.711 0.000 1.000 7200 4

15/11/2020(WO NO-2/14) 42 0 93 0 0.000 18.710 0.000 1.000 7200 4


WASTAGE 0 0.760 1.880 0.000 0.000 1.999 0.000 0.000 0.000 0.000
WESTAGE % 1.843 0.000 2.063 0.000 0.000 11.964 0.000 0.000 0.000
ALLOWABLE WASTAGE % 3.000 3.00 3.00 15.00 15.00 10.00 10.00 5.00

Signature of Contractor Siddha At Store Engineer At Siddha


22

Reconciliation Sheet for Reinforcement Steel up to 11-11-2020 WO.NO:- WO/SELV/MLCP - 2/14


LN MULTIPLEX PVT LTD

Sl. No. Description Unit


Diameter of Reinforcement Steel Total Remarks
8 Tor 10 Tor 12 Tor 16 Tor 20 Tor 25 Tor 32 Tor

A.
Received Qty From Store Up to MT 66.211 96.320 20.575 46.294 22.757 33.657 3.144 288.958
11.11.20

B.
Up to Previous Bill Consumed
Quantity (Billed Qty)
MLCP-2
1 Super-Structure
Up to Previous Bill Consumption Qty (in
W.O .NO-MLCP-2/14)
Up to 1st R/A Bill Consumption Qty MT 27.294 39.965 4.520 18.284 11.651 11.939 1.053 114.706
(B)

2nd R-A Bill Consumption for 3rd to


4th floor lvl Col, Beam & Slab Qty (B)
MT 9.107 13.310 2.023 6.328 2.395 3.513 0.348 37.024

3rd RA Bill Consumtion Qty for(4th


Floor lvl to 5th Floor lvl Col, Beam & MT 8.373 12.447 2.176 6.375 2.690 4.062 0.348 36.471
Slab )

Up to Previous Bill Total Consumed


Quantity (Billed Qty)
MT 44.774 65.722 8.719 30.987 16.736 19.514 1.749 188.201

This Bill Consumption Qty for 5th Floor to MT 8.376 12.587 2.170 6.375 2.690 4.062 0.348 36.608
6th Floor Lvl Col, Beam , Slab

Un-billed Qty for G. Floor to 6th Floor Lvl MT 1.578 2.300 3.900 0.000 0.000 0.700 0.000 8.478
Tie Rod for Col, Beam , Ramp Wall & Stair

W.I.P For 6th Floor lvl to 7th Floor lvl Col, MT 7.900 10.800 2.270 6.375 2.690 4.062 0.348 34.445
Beam & Slab

Total (Consumption, Un-billed Qty & Wip )


D=(A+B+C)
MT 62.628 91.409 17.059 43.737 22.116 28.338 2.445 267.732

Physical Stock in Steel Yard(Usable Stock) © MT 2.450 2.500 2.900 0.900 0.300 3.435 0.615 13.100

Total (Consumption, Un-billed Qty,Wip &


Physical stock ) D=(A+B+C)
MT 65.078 93.909 19.959 44.637 22.416 31.773 3.060 280.832

Signature of Contractor Siddha At Store Engineer At Siddha


23

WESTAGE (MT) MT 1.133 2.411 0.616 1.657 0.341 1.884 0.084 8.126

WESTAGE %(Scrap+normal) 1.741 2.567 3.086 3.712 1.521 5.930 2.745


ALLOWABLE WESTAGE % (Scrap+normal) As Per
W.O. 3.000 3.000 3.000 3.000 3.000 3.000 3.000
Scrap 2% MT

Signature of Contractor Siddha At Store Engineer At Siddha


24

Measurment Sheet of Brick Work UP to G.Floor


Brick Work
BREADT QUANTI REMARK
SLNO. Description of Item UOM NO. LENGTH HEIGHT
H TY S
250/230 mm thk Brick Work
(1:6)
G. FLOOR LVL
Stair -1 Side Wall Brick
Work inbetwwen grid CUM 1 3.850 0.230 1.100 0.974
1PC14 to 1PC15
Stair Back side Wall
inbetween Col 1PC14 to SQM 1 2.575 0.230 1.000 0.592
1PLW1
CUM 1 2.100 0.230 0.400 0.193
CUM 1 0.550 0.230 0.400 0.051
CUM 1 2.500 0.230 0.800 0.460
Total CUM 2.270

Basement Ceiling Plaster


SQM 1 4.500 7.500 33.750
(1:4) from IPC38 to IPC48

Total 33.750
Basement Wall Plaster
SQM 1 4.200 2.800 11.760
(1:6)
SQM 1 4.800 1.450 6.960
Total CUM 18.720
Soil Filling Quantity

1 Ramp Portion
1PC25-26 TO
1PC31-32 &
Ramp -1 & 2 1PC40-41 TO
2 7.900 4.000 0.450 Cum 14.220
1PC49-50

So, Total Earth Filling Cum 121.848


Qty

QUANTI REMARK
SLNO. Description of Item UOM NO. LENGTH BREADTH HEIGHT
TY S

Polythene Sheet LAYING


3
For Ramp Portion
SQM
Ramp-1 & Ramp-2 SQM 2 7.900 4.000 63.200

Qty CUM 63.200 A


To, 11/8/2021
The Project Incharge.
SIDDHA REAL ESTATE DEVELOPMENT PVT. LTD.(MLCP-2)
LAKE VIEW PARK ROAD, BONHOOGLY
Kolkata-108

Sub: Submission of 3RD R/A bill


WO/SELV/MLCP 2/7Dated 11/01/2018.

Sir,
We are hereby submitting our 3RD R/A bill for the above referred work along with
measurement sheet,Abstruct of bill,material Chalan statement & Invoice.

Please release 100% of our bill amount as eary as possible.

Thanking you.

With regards

(For L.N. Multiplex Pvt. Ltd)


SHUMMERY SHEET ABSTRACT FOR 3RD RA BILL OR This Bill UP TO DECK SLAB FROM BASEMENT RAFT

CLIENT: SIDDHA REAL ESTATE DEVELOPMENT PVT. LTD. AGENCY: L.N.MULTIPLEX PVT.LTD.

BLOCK-MLCP-2/7
Release
CERTIFIED
SL NO DESCRIPTION OF ITEM U.O.M. Quantity For Remarks
QUANTITY
This Bill

1 Earth Work in Excavation Cum. 574.731 574.731 Page-1

2 Earth Work in Filling Cum. 229.476 229.476 Page-1 & 3

3 Polythene Sheet Laying for Ramp Portion Sqm 63.200 63.200 Page-3

4 P.C.C (1:3:6) Work Cum. 21.492 21.492 Page-4 to 7

RCC WORK FOR RAFT , BEAM & Basement


8
Ramp Slab (M25, M30) Sqm 80.771 80.771 Page-2 & 8

10 Shuttering Work Sqm 10.665 10.665 Page-8

9
REINFORCEMENT WORK FOR RAFT SLAB & MT 3.946 3.946 Page-11,12 & 13
BEAM

6 Brick Work 230mm thk(1:6) Cum. 2.270 2.270 Page-9

11 Celling Plaster (1:4) 10 mm thk Sqm 33.750 33.750 Page-9

12 Inside Plaster (1:6) 12 mm thk Sqm 18.720 18.720 Page-9

13 PVC Slieve Cover Fixing nos 76 76 Page-10


SIDDHA EDEN LAKE VILLE
SITE HIG ( MLCP-2)
ABSTRACT SHEET FOR CONSUMPTION OF REINFORCEMENT STEEL
FOUNDATION TO RAFT LEVEL
SL. Total Weight ( MT ) Diawise ( mm )
NO Floor level Total Weight in MT
. 8mm 10mm 12mm 16mm 20mm 25mm 32mm
1 Basement Beam 0.384 0.053 0.139 0.536 0.556 0.036 0.221 1.924

2 Basement Raft 0.491 1.256 0.000 0.000 1.748

3 Basement Ramp 0.177 0.098 0.275

Total (A) 0.561 0.642 1.395 0.536 0.556 0.036 0.221 3.946
RECONCILIATION STATEMENT AT BONHOOGLY, BLOCK-MLCP-2 UP TO 31.10.2020 WO .NO:-WO/SELV/MLCP 2/7
Sika
(Sika Sikha Sikha Thermocol
Fly Ash Fly ash Brick Sika Top Micro
Sl No Block Item Consumed Cement (Bags) Sand (MT) Stone Chips (MT) Latex-) in Nitobond Hybond (25 mm
(Bags) (Nos) 122 (kg) Crete-4
Ltr (kg) (kg) thk) Pcs
(bags)
Medium
Qty PPC OPC PSC F.C. SAND 20 mm 10 mm
(Zone-III)
R.C.C (1:1:2) Pile Rebulting
(CUM) 2.610 19.837 1.965 1.5408 1.0258
R.C.C M30 (PPC) (CUM)
R.C.C M25 (RMC) (CUM)
P.C.C (1:3:6) (CUM) 64.000 281.600 0.000 43.136 83.2
P.C.C (1:3:6) (CUM) 144.358 193.398 441.778 97.297 202.101
MLCP- BRICK WORK (230MM) 1:6
1 9.503 15.062 4.552 3886.73
2 (CUM)

BRICK WORK (230MM) 1:6 3.000 4.755 1.437 1227.00


(CUM)
BRICK WORK (230MM) 1:6 7.110 11.269 3.406
(CUM)
BRICK WORK (110MM) 1:4 605.613 151.403 57.500 93.90325 36.337 32703.10
(SQM)
BRICK WORK (110MM) 1:4 50.000 12.500 3.000 2700.00
(SQM)
Plastering Work (10 13.158 1.128 0.289
mm)1:4
29.500 3.877 0.944
Plastering Work (12mm)1:6
Basement Col -Beam &
Drain Repearing work 28.000 1.500 5.100
purpose
wall & col hole packing
work 15.000 0.500

Cement Slurry for Concre


Pouring Purpose 15

For Cover Block


(50x50x50) (1:1) 1.125 8.55 0.847

For Cover Block


(50x50x40) (1:1) 2.320 17.632 1.747

For Cover Block


(50x50x30) (1:1) 1.125 4.95 0.847

For Cover Block


(50x50x25) (1:1) 1.350 5.94 1.017
TOTAL BILLED CONSUMPTION (A) RMC 364.638 155.226 863.218 0.000 0.000 198.821 286.842 6.126 40517 0

Un-Billed Qty & WIP Consumption(B) 20.000 6.200 0

TOTAL CONSUMPTION (A+B) 364.638 175.226 863.218 0.000 0.000 205.021 286.842 6.126 40516.829

TOTAL ISUED BY STORE UP TO 31/10/2019 0 365 180 936 0 0 240.836 318.730 6.950 41000 60 28 31.6 129 210 7

WASTAGE 0 0.362 4.774 72.782 0.000 0.000 35.815 31.888 0.824 483.171 60.000
WESTAGE % 0.099 2.652 7.776 14.871 10.005 11.859 1.178 100.000
ALLOWABLE WASTAGE % 2.00 3.000 3.00 3.00 15.00 15.00 10.00 10.00 5.00

Signature of Contractor Siddha At Store Engineer At Siddha


30

MEASURMENT SHEET OF 3RD R-A BILL

SLNO. Description of Item UOM NO. LENGTH BREADTH HEIGHT QUANTITY REMARKS

MEASURMENT SHEET OF 3RD R-A BILL


11.1 For Basement Ramp Portion
CUM
Ramp-1 CUM 1 7.900 4.500 0.150 5.333
Ramp-2 CUM 1 7.900 4.250 0.150 5.036
Qty CUM 10.369 B
Total Qty (A+B) CUM 80.771

10 Shuttering Work
For Basement Ramp Portion SQM
Ramp-1 SQM 1 7.900 0.450 3.555
Ramp-2 SQM 2 7.900 0.450 7.110
Qty SQM 10.665
31

Basement Balance Ramp Slab


BEAM NO DESCRIPTION OF BEAM DIA OF SHAP Clear Cap LD No. of Less CUTTING NO TOTAL REMARKS
BAR E OF Span (M) Width Bend LENGTH
BAR 8 10 12 16 20 25 32

`BTM MAIN BAR T -8 4.000 0.704 4.704 64 301.056 2150 301.06 0 0 0 0 0 0


BTM BINDER T -8 8.390 8.39 12 100.68 2150 100.68 0 0 0 0 0 0
Ramp-1&
2
Extra Top on R/w Portion T -10 0.6 0.44 1.04 158 164.32 2150 0 164.32 0 0 0 0 0

BINDER T -8 7.900 7.9 6 47.4 1600 47.4 0 0 0 0 0 0


0

Total Wt in RM 449.136 164.32 0 0 0 0 0


U/W As Per Dia Wise (RM/KG) 0.395 0.595
Total Wt As Per Dia Wise (Mt) 0.1774 0.0978 0

Cummulative Wt (Mt) 0.275


32

3RD R-A BILL


CONSTRUCTION OF SUB-STRUCTURE WORK OF BASEMENT MLCP-2 .

Bill To : SIDDHA REAL ESTATE DEVELOPENT


PVT. LTD. OUR GST NO 19AABCL3698M1ZS
Project : Date : Name of the contractor Bill No. Bill Date

Value of Work(As per Annexure


SELV Attached)
L.N.MULTIPLEX PVT.LTD. 3rd RA 11/8/2021

As per BOQ Upto previous Bill This Bill Cummulative Total


SL No. Description of work UOM
QTY Rate Amt. Rs. QTY Amt. Rs. QTY Amt. Rs. QTY Amt. Rs.

Earth work in Excavation by


mechanical or manual
means in required profile in
1 all type of soil in dry or wet Cum 14900.000 160.00 2,384,000.00 10,129.857 1620777.12 574.731 91956.96 10704.588 1712734.08
condition for pile cap,
raft,or any other
foundation.

Earth work in Filling with


Excavated earth or avaiable
earth at site, approved by
2 E-I-C in layers of 250mm Cum 4470.000 110.00 491,700.00 0.000 0.00 229.476 25242.36 229.476 25242.36
each including compacting
by hand/mechanical
rammer and watering.

Labour Charges for Laying


of Polythene sheet (150 gr/
3 sqm) below flooring in Sqm 4900.000 30.00 147,000.00 2837.718 85131.54 63.200 1896.00 2900.918 87027.54
foundation or in foundation
trenches.

Labour charges for making


& laying PCC (1:3:6 ) of
required thickness below
footing, plinth beam ,raft &
4 Cum 620.000 700.00 434,000.00 208.358 145850.60 21.492 15044.56 229.850 160895.16
others location as specified
in the Drawing till plinth lvl
using stonechips with
compacting
33

As per BOQ Upto previous Bill This Bill Cummulative Total


SL No. Description of work UOM
QTY Rate Amt. Rs. QTY Amt. Rs. QTY Amt. Rs. QTY Amt. Rs.

All charges for dismentailing


concrete in 500 mm dia .
Pile head projecting above
cut off lvl or fixed by E.I.C
5 RMT 1590.000 525.00 834,750.00 810.965 425756.63 0.000 0.00 810.965 425756.63
& EXPOSING the
reinforcement bars,
cleaning & straitening same
as per pile cap.

Labour Charges for


Construction 230/250 mm
thk brick massonary work
6 with satandard clay brick or Cum 80.000 750.00 60,000.00 12.503 9377.25 2.270 1702.50 14.773 11079.75
fly ash brick size
230x110x73 mm in cement
morter 1:6 .
Labour Charges for
Construction 125/110 mm
thk brick massonary work
7 with satandard clay brick or Sqm 260.000 136.00 35,360.00 655.693 89174.25 0.000 0.00 655.693 89174.25
fly ash brick size
230x110x73 mm in cement
morter 1:6 .

Labour charges or rebulting


500 mm dia pile with C.C
grade m25 round shuttering
8 & reinforcement after pile Cum 0.000 0.00 0.00
head breaking etc.complete
as per drawing , direction of
E.I.C Complete

Up to depth 75 mm Each 325.000 100.00 32,500.00 266.000 26600.00 0.000 0.00 266.000 26600.00

Beyond 75 mm depth RMT 165.000 850.00 140,250.00 0.000 0.00 0.000 0.00 0.000 0.00
Brick Flat Soling .
Providing and laying 75mm
thk brick flat soling
9.1 Sqm 1000.000 45.00 45,000.00 0.000 0.00 0.000 0.00 0.000 0.00
including hand packing ,
filling the interstices with
chips
34

As per BOQ Upto previous Bill This Bill Cummulative Total


SL No. Description of work UOM
QTY Rate Amt. Rs. QTY Amt. Rs. QTY Amt. Rs. QTY Amt. Rs.

Hire & Labour Charges for


Shuttering & Centering with
12 mm thk good quality ply
board/steel plate
10 shutteringwith required Sqm 2055.000 380.00 780,900.00 5171.092 1965014.96 10.665 4052.70 5181.757 1969067.66
bracing for curved or
straight. (up to Retaining
Wall & Col 2.4 m height
from Foundation Cap)

When ply wood & battens


will be supplied by
developer or instead of ply
wood & battens aluminium
frame shuttering will be
10.1 Sqm 555.000 237.00 131,535.00 0.000 0.00 0.000 0.00 0.000 0.00
used which shall be
provided by the developers
at its site go down against
item no 10 the rate will be
reduced by Rs. 143.00

Extra Labour & Hire charges


on item no 10 & 10.1 for
10.2 providing approved props Sqm 2055.000 45.00 92,475.00 4950.000 222750.00 0.000 0.00 4950.000 222750.00
as shuttering
support( where applicable)..

Labour Charges for mixing


& laying M25/M30/M35/M40
Grade Reinforcement
Cement concrete (excluding
cost of shuttering &
reinforcement work)for all
11 Cum 630.000 875.00 551,250.00 0.000 0.00 0.000 0.00 0.000 0.00
items e.g. columns, beams,
slabs, lintels, staircase,
retaining wall, pockets etc
for all profile using
aggregate (stonechips &
sand) as per design mixed.

If SMC Supplied by
11.1 developers at casting Cum 2400.000 225.00 540,000.00 2096.742 471766.95 80.771 18173.48 2177.513 489940.43
portion by using TM & Pump

Extra labour for pouring


concrete in RCC wall &
11.2 Cum 200.000 127.00 25,400.00 0.000 0.00 0.000 0.00 0.000 0.00
column at basement area
only over item no 11.0,
35

As per BOQ Upto previous Bill This Bill Cummulative Total


SL No. Description of work UOM
QTY Rate Amt. Rs. QTY Amt. Rs. QTY Amt. Rs. QTY Amt. Rs.

Bending, binding & laying of


Reinforcement for
reinforced cement concrete
work in all sorts of
12 MT 225.000 5,750.00 1,293,750.00 232.510 1336932.50 3.946 22689.50 236.456 1359622.00
structures including
distribution bar , stirrups &
binders etc, (up to Raft
top from Fondation Cap)

10 mm thk plaster with


13.1 cement morter (1:4) in Sqm 3200.000 102.00 326,400.00 0.000 0.00 33.750 3442.50 33.750 3442.50
ceiling at Basement.

15mm thk inside plastering


13.2 with cement morter (1:6) at Sqm 780.000 95.00 74,100.00 0.000 0.00 18.720 1778.40 18.720 1778.40
Basement.

Neat Cement finish over


plastered surface (cement
14 Sqm 200.000 25.00 5,000.00 0.000 0.00 0.000 0.00 0.000 0.00
not move than 2.75kg/sqm)
in all floors.
Labour Charges for Making
Holes & Fixing Pvc Sleeves of
15 Various Dia in RCC Beam , Col Nos 200.000 100.00 20,000.00 0.000 0.00 76.000 7600.00 76.000 7600.00
etc.

Labour Charges for Old Brick


16 Structure Dixmentailing Work Cum 20.000 525.00 10,500.00 14.286 7500.15 0.000 0.00 14.286 7500.15

Labour Charges for PCC


17 Structure Dixmentailing Work Cum 5.000 600.00 3,000.00 3.818 2290.80 0.000 0.00 3.818 2290.80

Labour Charges for RCC


18 Structure Dixmentailing Work Cum 2.000 850.000 1,700.00 1.984 1686.40 1.984 1686.40 3.968 3372.80

19 Fitting,Fixing, aligning of Insert MT 2.500 1077.000 2,692.50 1.950 2100.15 0.000 0.00 1.950 2100.15
Plates in Proper line & Level

8425370.00 6412709.29 195265.35 6607974.65

Less for SD 5% OF THIS BILL AMOUNT 9763.27

NET AMOUNT 185502.00


PROFORMA INVOICE
Details of Receiver (Billed to) Project Name & Address
Siddha Real Estate Siddha Eden Lake Ville Project INVOICE
Development Pvt. Ltd. Dated
Name : No.

Siddha Park, 99A, Park Lake View Park Road , Bonhoogly,


Address : Street, Kolkata-700016 Kolkata-700108
SELV/
State : West-Bengal MLCP 8-Nov-21
State Code : 19 2/7/3
GSTIN : 19ACTFS4920J12G
PAN NO AAJCS6B30L
U45400WB2006PTC1
CIN NO 07215
Contact No 033-040071515
W.O. No. WO/SELV/MLCP 2/7 Work Oder Value : 4456565.00
Date : 11.01.2018
Sl. No. Description HSN/SAC QTY Units Rate Amount (Rs.)
CODE
1 Earth Work in Excavation 9954 574.731 CUM 160.00 91,956.96
2 Earth Work in Filling 9954 229.476 CUM 110.00 25,242.36

3 Labour Charges for Laying of 63.200 SQM 30.00 1,896.00


Polythene Sheet 9954
4 PCC (1:3:6) 9954 21.492 CUM 700.00 15,044.40
2.270 CUM
6 230/250 mm thk Brick Massonary 750 1,702.50
Work 9954

9 Hire & Labour charges for 10.665 SQM 380.00 4,052.70


Shuttering & Centering 9954

11.1 Labour Charges for M25/M30 9954 80.771 CUM 225 18,173.48
grade Conc.
12 Reinforcement Work 9954 3.946 MT 5,750.00 22,689.50

13 10 mm thk Plaster (1:4) 9954 33.750 SQM 102.00 3,442.50

14 15 mm thk Plaster (1:6) 9954 18.720 SQM 95.00 1,778.40

15 PVC Fire Slieeve 9954 76.000 Nos 100.00 7,600.00

Labour Charges for RCC Structure


18 9954 1.984 CUM 850.00 1,686.40
Dixmentailing Work
Company's PAN : AABCL3698M Taxable Value 195,265.20
Company's GSTIN : 19AABCL3698M1ZS CGST @9 % 17,573.87
CIN : U45400WB2007PTC119230 SGST @9 % 17,573.87
MSME Not&Applicable IGST @.....%
Bank Branch : HDFC BANK, LAKE
TOWN BRANCH. Kolkata-700089 Total 230,412.93
Current Account No.: 50200020439135, Round Off (+/-) 0.07
RTGS/IFSC CODE : -HDFC0000349
Invoice Total 230,413.00

Amount (in words) Two Lac Twenty Thirty Thousand Four Hundred
Thirtyeen Rupees For L.N. Multiplex Pvt. Ltd.
Authorized Signatory
Cutting
As Per Pour Card (BBS)
Total
Nos of
Beam Descriptio Dia of Length Nos of Length
S.l no Bars per 8 10 12 16 20 25 32
mark n of Bar Bar (A) inc. bend slab ( B) L=(l+B x
(-3250 deduction Beam ( C) C)
lvlRaft Chair 12 1.544 1 46 71.024 71.024
slab on lap in Raft 10 0.500 1 165 82.500 82.500
date lap in Raft 12 0.600 1 132 79.200 79.200
20/04/18
Total 82.500 150.224
Chair for
12 1.714 1 50 85.700 85.700
(-3250 Raft
lvlRaft Chair for
slab on 12 1.324 1 42 55.608 55.608
Raft
date
02/06/18 Chair for
12 1.154 1 30 34.620 34.620
Drain
lap in Raft 10 0.500 1 30 15.000 15.000
lap in Raft 12 0.600 1 150 90.000 90.000
Total 15.000 265.928

(-3250 Chair for


10 1.3 1 95 123.500 123.500
lvlRaft Raft
slab on
date Chair for
10 1.46 1 20 29.200 29.200
05/11/18 Raft

lap in Raft 12 0.600 1 216 129.600 129.600

25 27.500 27.500
lap in beam 1.250 1 22
Total 152.700 129.600 27.500

(-2550 lvl Chair for


8 1.58 1 12 18.960 18.960
Retaining Wall
wall on
date Tie Bar 8 0.6 1 150 90.000 90.000
21/11/18
Total 108.960
Chair for
(-3250 12 1.544 1 109 168.296 168.296
Raft
lvlRaft
slab on
date Chair for
12 1.714 1 3 5.142 5.142
01/12/18 Raft
Cutting
As Per Pour Card (BBS)
Total
Nos of
Beam Descriptio Dia of Length Nos of Length
S.l no 8 10 12 16 20 25 32
mark n of Bar Bar (A) inc. bend slab ( B) Bars per L=(l+B x
deduction Beam ( C) C)
lap in Raft 10 0.500 1 156 78.000 78.000

25 1.250 1 35 43.750 43.750


lap in beam
Total 78.000 173.438 43.750

Chair for
12 1.714 1 44 75.416 75.416
Raft

Chair for
10 1.544 1 169 260.936 260.936
Raft

Chair for
12 1.694 1 66 111.804 111.804
Drain

(-3250
lvlRaft lap in Raft 10 0.500 1 203 101.500 101.500
slab on
date
06/01/18 lap in Raft 12 0.600 1 144 86.400 86.400

10 0.500 1 240 120.000 120.000


lap in Drain
10 0.500 1 66 33.000 33.000
Tie of Drain
25 1.250 1 32 40.000 40.000
lap in beam
20 1.000 1 20 20.000 20.000
lap in beam
Total 515.436 273.620 40.000
Total Length in Mtr Diawise 108.960 843.636 992.810 111.250
Unit Weight in Kg/Mtr Diawise 0.388 0.595 0.875 1.550 2.447 3.836 6.274
Weight in Kg Diawise 42.276 501.963 868.709 426.755
Weight in MT Diawise (G) 0.042 0.502 0.869 0.427
Total Weight in MT 1.840
MEASURMENT SHEET OF 3RD R-A BILL
REMARK
SLNO. Description of Item UOM NO. LENGTH BREADTH HEIGHT QUANTITY
S

15 PVC FIRE SLEEVE At Deck Slab Portion


Dia of Sleeve
150 Dia Nos 15 15.000
100 Dia Nos 15 15.000
80 Dia Nos 15 15.000
65 Dia Nos 19 19.000
50 Dia Nos 12 12.000
Qty Nos 76.000