HORIZON STEEL (PVT) KARACHI

WIRE ROD MILL (ELECTRICAL CONTROL ROOM

BAR BENDING SCHEDULE OF RAFT


RAFT LENGTH = 31.600 M RAFT HEIGHT = .300 M
RAFT WIDTH= 8.800 M
Dia Total
No of Spacing No of Length Weight of No of Bend
Ser Description Bar (mm)
Length Total Kg A B B B
Memb Bars mm Bar (Kg/ M) Bends Deduction
mm (m)
Bottam main Bars
1 (Grid)4 to 6
1 12 150 86 9,100 782.600 0.888 694.949 8700 200 200

Bottam main Bars


2 (Grid)1 to 2
1 12 150 46 9,100 418.600 0.888 371.717 8700 200 200

distribution Bars
3 (Grid)A to B
2 12 150 59 12,000 1416.000 0.888 1,257.409 11800 200

Longitudinal Bottom
4 Bars (Grid)A to B
1 12 150 59 8,900 525.100 0.888 466.289 8900

Bottam main Bars


5 (Grid)B to C
2 12 150 8 8,050 128.800 0.888 114.375 7850 200

Bottam main Bars


6 (Grid) C to D
1 12 150 19 7,100 134.900 0.888 119.791 6700 200 200

distribution Bars
7 (Grid)2 to 3
2 12 150 41 8,050 660.100 0.888 586.169 7850 200

distribution Bars
8 (Grid)3 to 4
2 12 150 41 9,775 801.550 0.888 711.777 9575 200

Top main Bars


1 12 150 86 9,100 782.600 0.888 694.949 8700 200 200
(Grid)4 to 6
Top main Bars
1 12 150 46 9,100 418.600 0.888 371.717 8700 200 200
(Grid)1 to 2
distribution Bars
2 12 150 59 12,000 1416.000 0.888 1,257.409 11800 200
(Grid)A to B
Longitudinal Bottom
1 12 150 59 8,900 525.100 0.888 466.289 8900
Bars (Grid)A to B
Top main Bars
2 12 150 8 8,050 128.800 0.888 114.375 7850 200
(Grid)B to C
Top main Bars
1 12 150 19 7,100 134.900 0.888 119.791 6700 200 200
(Grid) C to D
distribution Bars
2 12 150 41 8,250 676.500 0.888 600.733 7850 200 200
(Grid)2 to 3
distribution Bars
2 12 150 41 9,575 785.150 0.888 697.214 9575
(Grid)3 to 4
TOTAL WEIGHT OF RAFT (KG) = 8,644.96

TOTAL WEIGHT OF RAFT (TON) = 8.645


C SHAPE
B
A

B
B

32mm 7,113.78
A

B 25mm 8310.97791
A

A
AB

B
B

16mm #REF!
A

tatal #REF!
B
B
B A

B
AB
B
A

B
B
A

B
A

A
AB

B
B

B A
B

A
B
HORIZON STEEL (PVT) KARACH
WIRE ROD MILL (ELECTRICAL CONTRO

BAR BENDING SCHEDULE OF COLUM


COLUMN LENGTH = .600 M COLUMN HEIGHT = 1.300 M
COLUMN WIDTH= .400 M
Dia Total
No of Spacing No of Length Weight of No of
Ser Description Bar (mm)
Length
Memb Bars mm Bar (Kg/ M) Bends
mm (m)
Main Bars (C1) 15 20 12 3,500 630.000 2.467
1
Small Ring (C1) 15 8 150 22 1990 656.7 0.395
2
Small Ring (C1) 15 8 150 22 1590 524.7 0.395
3
short Ring (C1) 15 8 150 44 1650 1089 0.395
4
Main Bars (C2) 3 20 12 3,500 126.000 2.467
5
Small Ring (C2) 3 8 150 32 1,590 152.640 0.395
6
Short Ring (C2) 3 8 150 32 1,650 158.400 0.395
7
Main bars (C3) 2 16 12 3,500 84.000 1.579
8
Small Ring (C3) 2 8 150 44 1,170 102.960 0.395
9
Short Ring (C3) 2 8 150 44 1,478 130.064 0.395
10
Main Bars (SC1) 18 16 8 3,500 504.000 1.579
11
Ring (SC1) 18 8 150 44 1,010 799.920 0.395
12

13 Main Bars fooding


3 16 150 13 2,300 89.700 1.579

distribution Bars
3 16 150 13 2,300 89.700 1.579
14 footing
Top main bars
3 12 150 13 2,300 89.700 0.888
15 footing
distribution Bars
3 12 150 13 2,300 89.700 0.888
16 fooding
TOTAL WEIGHT OF COLUMNS & FOODING (KG) =

TOTAL WEIGHT OF COLUMNS & FOODING (TON) =


TEEL (PVT) KARACHI
LECTRICAL CONTROL ROOM

CHEDULE OF COLUMNS(C1)

Bend
Total Kg A A B B C SHAPE
Deduction

A
1,554.002 3200 300

B
AB
259.178 560 560 360 360 150

B
207.082 560 560 160 160 150 B

B
A B
429.792 390 390 360 360 150 B

B
310.800 3200 300

B
60.242 560 560 160 160 150

AB A

B
62.515 390 390 360 360 150

B
A
132.608 3200 300

B
B
40.635 390 390 120 120 150
A

B
B
51.332 444 444 220 220 150
A

B
795.649 3200 300
A B

B
AB
315.702 220 220 220 200 150
B

141.607 1900 200 200 A


B
B

141.607 1900 200 200


B A

79.654 1900 200 200 A B


B
B

79.654 1900 200 200


A

4,662.06

4.662
32mm 7,783.15

25mm 2562.55744

16mm #REF!

tatal #REF!
HORIZON STEEL (PVT) KARACH
WIRE ROD MILL (ELECTRICAL CONTRO

BAR BENDING SCHEDULE OF COLUM


COLUMN LENGTH = .600 M COLUMN HEIGHT = 1.300 M
COLUMN WIDTH= .400 M
Dia Total
No of Spacing No of Length Weight of No of
Ser Description Bar (mm)
Length
Memb Bars mm Bar (Kg/ M) Bends
mm (m)
Main Bars (C1) 15 20 12 3,500 630.000 2.467
1
Small Ring (C1) 15 8 150 22 1990 656.7 0.395
2
Small Ring (C1) 15 8 150 22 1590 524.7 0.395
3
short Ring (C1) 15 8 150 44 1650 1089 0.395
4
Main Bars (C2) 3 20 12 3,500 126.000 2.467
5
Small Ring (C2) 3 8 150 32 1,590 152.640 0.395
6
Short Ring (C2) 3 8 150 32 1,650 158.400 0.395
7
Main bars (C3) 2 16 12 3,500 84.000 1.579
8
Small Ring (C3) 2 8 150 44 1,170 102.960 0.395
9
Short Ring (C3) 2 8 150 44 1,478 130.064 0.395
10
Main Bars (SC1) 18 16 8 3,500 504.000 1.579
11
Ring (SC1) 18 8 150 44 1,010 799.920 0.395
12

13 Main Bars fooding


3 16 150 13 2,300 89.700 1.579

distribution Bars
3 16 150 13 2,300 89.700 1.579
14 footing
Top main bars
3 12 150 13 2,300 89.700 0.888
15 footing
distribution Bars
3 12 150 13 2,300 89.700 0.888
16 fooding
TOTAL WEIGHT OF COLUMNS & FOODING (KG) =

TOTAL WEIGHT OF COLUMNS & FOODING (TON) =


TEEL (PVT) KARACHI
LECTRICAL CONTROL ROOM

CHEDULE OF COLUMNS(C1)

Bend
Total Kg A A B B C SHAPE
Deduction

A
1,554.002 3200 300

B
AB
259.178 560 560 360 360 150

B
207.082 560 560 160 160 150 B

B
AB
429.792 390 390 360 360 150 B

B
A
310.800 3200 300

B
A
60.242 560 560 160 160 150

B B
AB
62.515 390 390 360 360 150

132.608 3200 300

A
B

B
40.635 390 390 120 120 150
A

BB
51.332 444 444 220 220 150
A

B
795.649 3200 300
A B

315.702 220 220 220 200 150 B


A
B
B

141.607 1900 200 200 A


B
B

141.607 1900 200 200

B
B A

79.654 1900 200 200 A


B
B

79.654 1900 200 200


A

4,662.06

4.662
32mm 7,783.15

25mm 2562.55744

16mm #REF!

tatal #REF!