You are on page 1of 6

BAR BENDING SCHED

Wearing Coat on Top Slab (m) : 0.075

SKEW SKEW SKEW SKEW Skew


TOTAL TOTAL ANGLE :
APPROACH SLAB RETAININ Cover for
APPROAC APPROACH cos(θ) =
THICKNESS G WALL other
H SLAB SALB cos(00°00
IN M TOP than Soil
LENGTH BREADTH '00") or
(T) WIDTH faces
IN M IN M cos(00.00 (W) IN M in m
(L) (B) 00°)

14.900 3.500 0.300 1.00000 0.55000 0.05000

Length in "m"
Weight
Bar Mark Bar Dia.
S.No. per Shape of the Bar
No. In "mm"
Metre
A B C D E

B
1 1 12 0.888 A C 0.200 3.400 0.200

B
2 1a 12 0.888 A C 0.200 14.800 0.200

B
3 2 12 0.888 0.200 3.400 0.200
A
C A

B
4 2a 12 0.888 0.200 14.800 0.200
C A
As per Standard Drawing

Prepared by Checked by Verified

Jr.Engineer Bridge Engineer


Sr.Engineer/ DPM (BSCPLIL)
(BSCPLIL) (Author
EDULE FOR APPROACH SLAB

SQ SQ TOTAL SQ TOTAL
Cover for SQ TOTAL SKEW TOTAL
RETAININ APPROACH APPROACH
other STRUCTURE STRUCTURE
G WALL SLAB SLAB
than Soil LENGTH LENGTH
TOP LENGTH BREADTH
faces IN M IN M
WIDTH IN M IN M
in m (TL) (TL)
(W) IN M (L) (B)

0.050 0.550 14.900 3.500 16.000 16.000

Cutting Total Total


Spacing No.of Multiple Total Description of the
Length Length Weight
in "mm" Bars No.s No.s Bar
in "m" in "m" in "Kg"
F G

3.752 150 100 1 100 375.200 333.178 Slab Top Main Bars

Slab Top Distribution


15.152 150 23 1 23 348.496 309.464 Bars

Slab Bottom Main


3.752 150 100 1 100 375.200 333.178 Bars

Slab Bottom
15.152 150 23 1 23 348.496 309.464 Distribution Bars
SUB TOTAL IN KG 1285.284

10 MM DIA 0.000

12 MM DIA 1285.284

DIA WISE ABSTRACT IN KG: 16 MM DIA 0.000

20 MM DIA 0.000

25 MM DIA 0.000

TOTAL STEEL REQUIRED FOR APPROACH SLAB 1285.284

rified by Approved by

Team Leader/ R.E


hority Engineer) (Authority Engineer)
Remarks
0.000

1285.284

0.000

0.000

0.000

1285.284