You are on page 1of 19

Design of Flexible Pavements as per IRC: 37-2012

Number of Lanes 2
Initial traffic as per last count, P 1500
Construction period, x , years 2 THICKNESS CALCULATIONS ,
CVPD in year of completion, A 1701.3375 (sum of both dir.) TRAFFIC 19709604
Avg. ann GR, r 6.5 % BC/SDBC 40
design life, n 15 DBM 119
CBR, 500mm subgrade, % 5 G.BASE 250
Terrain Rolling/Plain GSB 380
Carriageway Dual subgrade 500
LDF 0.75
VDF 3.5
Cum. Std. axles , N 19,709,604 10
20
FATIGUE STRAINS
Tensile Strain @ bottom of bitumen layer 2.16E-04
RUTTING STRAINS
Vertical Comp. Strain @ top of subgrade 4.56E-04

Calculating Modulus Values , Mpa


Bitumen, Eb 2000
Subgrade, Esub 50.00
Granular (Base+Sub-base) , Eg_layer 181.85
THICKNESS CALCULATIONS , mm CBR 3
TRAFFIC BC/SDBC DBM
TRAFFIC BC/SDBC DBM G.BASE GSB 2 25 50
10 40 80 250 380 5 25 60
20 40 120 250 380 10 40 80
20 40 120
30 40 140
50 40 135
100 50 155
150 50 170
G.BASE GSB
225 335
250 335
250 380
250 380
250 380
250 380
250 380
250 380
VDF
Initial CVPD Rolling/Plain Hilly
150 1.5 0.5
1500 3.5 1.5
1501 4.5 2.5

LDF
CW\LANE 1 2 3 4
single 1 0.5 0.45 0.4
dual - 0.75 0.6 0.45

LDF
CW\LANE 1 LANE 2 LANE 3 LANE 4 LANE
Single cw. 1 0.5 0.4 -
dual cw. - 0.75 0.6 0.45
CEMENTED BASE OR SUB-BASE OR BOTH
H
ID NAME REGION PHONE EMAIL SALE#
657 SDDF N 9871XX TONY@GMAIL.COM SINGLE
545 FBB A 9467XXX GAURAV@GMAIL.COM 2
313 VBN S 98741XXX SFF@GMAIL.COM 3
572 GS S 986XX JSD@GMAIL.COM

SALES NUM NAME REGION PHONE EMAIL


2 545 COMPANY COMPANY
dio
SDF
COMPANY SALES PERSON staf
ABD 657 dio
SDF 545 fal
SDGFGB 313 hal
3 PAVEMENT THICKNESS, MM
TRAFFIC\CBR BC/SDBC DBM G.BASE GSB 7 8 9 10 15
2000000 25 50 225 335
5000000 25 60 250 335
10000000 40 80 250 380
20000000 40 120 250 380
30000000 40 140 250 380
50000000 40 135 250 380
100000000 50 155 250 380
150000000 50 170 250 380

CBR 3
Traffic 30000000

You might also like