Beam Bar Bending Schedule Work- By Prof.

Shaikh
(D.C.E., B.E. Civil, ME Structures)
Unite Constructions & Coaching
Youtube Link: Unite Constructions & Unite Coaching
https://www.youtube.com/channel/UCBAqtp4A_YbEuUE59o7p-9w

Enter Values In these cells only

Designed beam given data Length of bars & Number of S


Sr.No. Description Value Unit Sr.No.
1 Width of beam (b) 300 mm 1
2 Depth of beam (D) 650 mm 2
6 Cover (d') 25 mm 3
3 Effective depth (d) 600 mm 4
4 Span of beam (L) 5.6 m 5
5 Width of support (bs) 300 mm 6
7 Diameter of main straight bar 20 mm
8 Number of main straight bar 2 numbers
9 Diameter of bent up bar 20 mm
10 Number of bent up bar 2 numbers Sr.No.
11 Diameter of Anchor Bars 12 mm 1
12 Number of Anchor bar 2 numbers 2
13 Diameter of stirrups 6 mm 3
14 Spacing of stirrups 140 mm c/c 4
Work- By Prof. Shaikh
Structures)
& Coaching
tions & Unite Coaching
CBAqtp4A_YbEuUE59o7p-9w

Enter Values In these cells only

Length of bars & Number of Stirrups A


Description Value Unit
Total length of beam (TL) 6200 mm
Length of main straight bar 6.51 m B
Length of bent up bar 7.014 m
Length of anchor bar 6.366 m
Length of stirrups 1.844 m
Number of stirrups 45 numbers

Main Bars

Description of bar No. Diameter Length(m) Total length of bar(m)


Main Straight bars 2 20 6.51 13.02
Main Bent Up Bars 2 20 7.014 14.028
Anchor Bars 2 12 6.366 12.732
Stirrups 45 6 1.844 82.98
Anchor
bars

Stirrups

Bars

Weight (kg/m) Total weight (kg)


2.469 32.14814815
2.469 34.63703704
0.89 11.31733333
0.2222222222 18.44000000