Missing details Assumed 65 dia length in one column = 8.37 + (150*4) = 8.9
foundation details are not available
c/c distance between columns 5m
Considered only for phase 1 development
Unit structural details Unit
Description Nos. Weight / rmt Total weight / rmt
Purlin (50 mm bore dia Medium (B class) 8 5 40.00 Kg
for columns 65 mm bore dia medium (B class) 1 6.4 6.40 Kg
300 x 450 x 12 mm th base plate 1 12.72 12.72 Kg
No. of bolts in
Calculating total nos each plate
20 dia bolts 600 mm long 4 4 Nos
J bolts for connection between purlin & roof 8 1 8.00 Nos
Width
Area for roofing in sq m 1 4.5 4.50 Sq.m.
R1 R2 R3
nos. Length Total weight nos. Length Total weight nos. Length Total weight
2 24 1920 1 30 1200 1 80 3200
2 45 576 1 54 345.6 1 144 921.6
2 5 127.2 1 6 76.32 1 16 203.52
no of no. of
parking plates in
area each area Total nos Total nos Total nos
2 5 40 1 6 24 1 16 64
2 24 384 1 30 240 1 80 640
Total area Total area Total area
2 24 216 1 30 135 1 80 360
R1 R2 R3
nos. Length Total weight nos. Length Total weight nos. Length Total weight
2 0 0 1 0 0 1 60 1200
2 0 0 1 0 0 1 62.1 397.44
2 0 0 1 0 0 1 9 114.48
Total nos Total nos Total nos
2 0 0 1 0 0 1 9 36
2 0 0 1 0 0 1 60 240
Total area Total area Total area
2 0 0 1 0 0 1 60 144
R4 R5 Gross Total
nos. Length Total weight nos. Length Total weight
2 70 5600 2 34 2720 14640 Kg
2 126 1612.8 2 63 806.4 4262.4 Kg
2 14 356.16 2 7 178.08 941.28 Kg
R4 R5 Gross Total
nos. Length Total weight nos. Length Total weight
2 60 2400 2 60 2400 6000 Kg
2 62.1 794.88 2 62.1 794.88 1987.2 Kg
2 9 228.96 2 9 228.96 572.4 Kg
Total nos Total nos
2 9 72 2 9 72 180 Nos
2 60 480 2 60 480 1200 Nos
Total area Total area
2 60 288 2 60 288 720 Sq.m.
Infrastructure
Sr. No. Particulars Unit No L B
40.00
300.00
1025.00
2071.00
53.00
31.50
40.00
220.00
13.00
40.00
1025.00
1275.00
50.00
15.00
257.00
349.00
220.00