You are on page 1of 5

Chainage Location

Berm
Slope
Distance, m Berm no. Height, Diameter,
From To LHS/RHS Gradient
(m) D (mm)

LHS 50 2V:1H 1 6 150


40 2V:1H 2 6 150
CH100 CH150
35 2V:1H 3 6 150
30 2V:1H 4 6 150
RHS 50 2V:1H 1 6 150
40 2V:1H 2 6 150
CH200 CH250
35 2V:1H 3 6 150
30 2V:1H 4 6 150
Soil Nail Guniting Horizontal Drain

Steel Bar Length, L Angle to Horizontal Row of Soil Thickness, t Length, L


Type (m) Horizontal, Փ (˚ ) Spacing (m) Nail per Berm (mm) Reinforcement (m)

T32 18 20 1.5 4 150 2 x BRCA8 12


T32 18 20 1.5 4 150 2 x BRCA8 12
T32 18 20 1.5 4 150 2 x BRCA8 -
T32 18 20 1.5 4 150 2 x BRCA8 -
T32 18 20 1.5 4 150 2 x BRCA8 12
T32 18 20 1.5 4 150 2 x BRCA8 12
T32 18 20 1.5 4 150 2 x BRCA8 -
T32 18 20 1.5 4 150 2 x BRCA8 -
Horizontal Drain

Spacing, S
(m)

3
3
-
-
3
3
-
-
Coordination Elevation Laye
Boredpile of top of
Boredpile
Gridline Diameter, wall at Anchor
Northing (N) Easting (E) No.
(mm) Boredpile Elevation
, (m) (m)

A1 667386.7 754649 BP1 1200 1070.84 1068.24


667388.32 754647.09 BP2 1200 1071.44 1067.91
667389.94 754645.19 BP3 1200 1071.13 1067.6
667391.55 754643.28 BP4 1200 1070.8 1067.27
A5 667393.17 754641.37 BP5 1200 1070.47 1066.94
667394.79 754639.47 BP6 1200 1070.14 1066.6
667396.4 754637.56 BP7 1200 1069.8 1066.27
667398.02 754635.65 BP8 1200 1069.5 1065.97
667399.64 754633.74 BP9 1200 1069.2 1065.68
A10 667401.26 754631.84 BP10 1200 1068.9 1065.38
Layer 1 Layer 2

Anchor Lock in Angle to Estimated Anchor Anchor Lock in Angle to Estimated


Capacity Force Horizontal, Free Length Elevation Capacity Force Horizontal, Free Length
(Tonne) (Tonne) Փ (˚ ) (m) (m) (Tonne) (Tonne) Փ (˚ ) (m)

70 20 25 <18 - - - - -
70 20 25 <18 1069.95 50 15 25 <18
70 20 25 <18 1069.63 50 15 25 <18
70 20 25 <18 1069.31 50 15 25 <18
70 20 25 <18 1068.97 50 15 25 <18
70 20 25 <18 1068.64 50 15 25 <18
70 20 25 <18 1068.31 50 15 25 <18
70 20 25 <18 1068.01 50 15 25 <18
70 20 25 <18 1067.71 50 15 25 <18
70 20 25 <18 1067.41 50 15 25 <18