You are on page 1of 3

Bar Bending Schedule For 2.5 M Depth RCC MH Chamber Total Wt. in KG 110.

25
C/c No. Total Cut Weight in Kgs
S. Cutting Remarks /
Description / Bar Mark Spacing Dia Shape of Length 8 10 16
No. Length (mm) Total Bend Detail
(mm) Bars (Rmt) TMT TMT TMT
One Total
A Raft
Bar Bar

1 Central Bar-Bottom-both way 150 10 MM 2 2340 4680 4.68 2.89 2.89 150+2100+150
2 1st bar (both side of central bar) 150 10 MM 4 2320 9280 9.28 5.73 5.73 150+2080+150
3 2nd bar (both side of central bar) 150 10 MM 4 2260 9040 9.04 5.58 5.58 150+2020+150
4 3rd bar (both side of central bar) 150 10 MM 4 2160 8640 8.64 5.33 5.33 150+1920+150
5 4th bar (both side of central bar) 150 10 MM 4 2020 8080 8.08 4.99 4.99 150+1780+150
6 5th bar (both side of central bar) 150 10 MM 4 1810 7240 7.24 4.47 4.47 150+1570+150
7 6th bar (both side of central bar) 150 10 MM 4 1530 6120 6.12 3.78 3.78 150+1290+150
8 7th bar (both side of central bar) 150 10 MM 4 1100 4400 4.4 2.71 2.71 150+860+150

9 Central Bar-Top-both way 150 10 MM 2 2340 4680 4.68 2.89 2.89 150+2100+150
10 1st bar (both side of central bar) 150 10 MM 4 2320 9280 9.28 5.73 5.73 150+2080+150
11 2nd bar (both side of central bar) 150 10 MM 4 2260 9040 9.04 5.58 5.58 150+2020+150
12 3rd bar (both side of central bar) 150 10 MM 4 2160 8640 8.64 5.33 5.33 150+1920+150
13 4th bar (both side of central bar) 150 10 MM 4 2020 8080 8.08 4.99 4.99 150+1780+150
14 5th bar (both side of central bar) 150 10 MM 4 1810 7240 7.24 4.47 4.47 150+1570+150
15 6th bar (both side of central bar) 150 10 MM 4 1530 6120 6.12 3.78 3.78 150+1290+150
16 7th bar (both side of central bar) 150 10 MM 4 1100 4400 4.4 2.71 2.71 150+860+150
B Wall

17 Outer Vertical 150 8 MM 30 662 19860 19.86 7.84 7.84 350+300+60

18 Inner Vertical 150 8 MM 27 662 17874 17.874 7.06 7.06 350+300+60

C Rings
19 Inner Ring below slab 150 8 MM 2 1280 2560 2.56 1.01 1.01 1240 dia + 40
20 Outer Ring below slab 150 8 MM 2 1440 2880 2.88 1.14 1.14 1400 dia + 40
21 Inner Ring at top notch (TYP) TYP 8 MM 2 670 1340 1.34 0.53 0.53 630 dia + 40
Bar Bending Schedule For 2.5 M Depth RCC MH Chamber Total Wt. in KG 110.25
C/c No. Total Cut Weight in Kgs
S. Cutting Remarks /
Description / Bar Mark Spacing Dia Shape of Length 8 10 16
No. Length (mm) Total Bend Detail
(mm) Bars (Rmt) TMT TMT TMT
22 Outer Ring at top notch (TYP) TYP 8 MM 3 870 2610 2.61 1.03 1.03 830 dia + 40
D Slab
Vertial Direction-Bottom Steel
A- Position at Opp. To MH
opening
23 Central Bar 150 8 MM 1 1582 1582 1.582 0.62 0.62 65+1500+65
24 1st bar (one side of central bar) 150 8 MM 1 1562 1562 1.562 0.62 0.62 65+1480+65
25 2nd bar (one side of central bar) 150 8 MM 1 1482 1482 1.482 0.59 0.59 65+1400+65
26 3rd bar (one side of central bar) 150 8 MM 1 1352 1352 1.352 0.53 0.53 65+1270+65
27 4th bar (one side of central bar) 150 8 MM 1 1152 1152 1.152 0.46 0.46 65+1070+65
28 5th bar (one side of central bar) 150 8 MM 1 852 852 0.852 0.34 0.34 65+770+65
29 6th bar (one side of central bar) 150 8 MM 1 282 282 0.282 0.11 0.11 65+200+65
B- Position at Towards MH
opening
30 1st bar (one side of central bar) 150 8 MM 2 302 604 0.604 0.24 0.24 65+220+65
31 2nd bar (one side of central bar) 150 8 MM 2 152 304 0.304 0.12 0.12 65+70+65

Horizontal Direction
32 Central Bar 150 8 MM 1 652 652 0.652 0.26 0.26 65+570+65
33 1st bar (one side of central bar) 150 8 MM 2 662 1324 1.324 0.52 0.52 65+580+65
34 2nd bar (one side of central bar) 150 8 MM 2 712 1424 1.424 0.56 0.56 65+630+65
35 3rd bar (one side of central bar) 150 8 MM 2 1352 2704 2.704 1.07 1.07 65+1270+65
36 4th bar (one side of central bar) 150 8 MM 2 1152 2304 2.304 0.91 0.91 65+1070+65
37 5th bar (one side of central bar) 150 8 MM 2 852 1704 1.704 0.67 0.67 65+770+65
38 6th bar (one side of central bar) 150 8 MM 2 292 584 0.584 0.23 0.23 65+210+65

Vertial Direction-Top Steel


A- Position at Opp. To MH
opening
39 Central Bar 150 8 MM 1 1582 1582 1.582 0.62 0.62 65+1500+65
40 1st bar (one side of central bar) 150 8 MM 1 1562 1562 1.562 0.62 0.62 65+1480+65
Bar Bending Schedule For 2.5 M Depth RCC MH Chamber Total Wt. in KG 110.25
C/c No. Total Cut Weight in Kgs
S. Cutting Remarks /
Description / Bar Mark Spacing Dia Shape of Length 8 10 16
No. Length (mm) Total Bend Detail
(mm) Bars (Rmt) TMT TMT TMT
41 2nd bar (one side of central bar) 150 8 MM 1 1482 1482 1.482 0.59 0.59 65+1400+65
42 3rd bar (one side of central bar) 150 8 MM 1 1352 1352 1.352 0.53 0.53 65+1270+65
43 4th bar (one side of central bar) 150 8 MM 1 1152 1152 1.152 0.46 0.46 65+1070+65
44 5th bar (one side of central bar) 150 8 MM 1 852 852 0.852 0.34 0.34 65+770+65
45 6th bar (one side of central bar) 150 8 MM 1 282 282 0.282 0.11 0.11 65+200+65
B- Position at Towards MH
opening
46 1st bar (one side of central bar) 150 8 MM 2 302 604 0.604 0.24 0.24 65+220+65
47 2nd bar (one side of central bar) 150 8 MM 2 152 304 0.304 0.12 0.12 65+70+65
Horizontal Direction
48 Central Bar 150 8 MM 1 652 652 0.652 0.26 0.26 65+570+65
49 1st bar (one side of central bar) 150 8 MM 2 662 1324 1.324 0.52 0.52 65+580+65
50 2nd bar (one side of central bar) 150 8 MM 2 712 1424 1.424 0.56 0.56 65+630+65
51 3rd bar (one side of central bar) 150 8 MM 2 1352 2704 2.704 1.07 1.07 65+1270+65
52 4th bar (one side of central bar) 150 8 MM 2 1152 2304 2.304 0.91 0.91 65+1070+65
53 5th bar (one side of central bar) 150 8 MM 2 852 1704 1.704 0.67 0.67 65+770+65
54 6th bar (one side of central bar) 150 8 MM 2 292 584 0.584 0.23 0.23 65+210+65

E Top Notch

55 Inner vertical 200 8 MM 4 376 1504 1.504 0.59 0.59 100+300

200 8 MM 7 652 4564 4.564 1.80 1.80 100+300+300

56 Outer vertical 200 8 MM 4 401 1604 1.604 0.63 0.63 75+350

200 8 MM 10 502 5020 5.02 1.98 1.98 75+325+150

You might also like