You are on page 1of 3

Bar Bending Schedule OF Box Culvert

B = 3.80 m H = 3.80 m L = 25.00 m 25000


Cover = 50 mm

Length Concrete Wt/ mtr Total


Bar Shape Space No. of
Struktur mark of Bar
Bar Dia
mm
of bars Row Length
bars
of bars weight
(m) (mm) (Kg) (Kg)

Plat Lantai 1
Top steel a 25 mm f @ 150 mm c/c 3.70 1 24.90 166 3.858 15950
Bottom steel b 20 mm f @ 203 mm c/c 3.70 1 24.90 123 2.469 7570
Distribution j 12 mm f @ 203 mm c/c 24.90 2 4.46 44 0.889 180
Thickness T = 381 mm Clear Length 3800 mm Total Length 4562 mm

Bottom slab 1
Top steel h 20 mm f @ 203 mm c/c 3.7 1 24.90 123 2.469 7570
Bottom steel i 20 mm f @ 152 mm c/c 3.7 1 24.90 164 2.469 10090
Distribution j 12 mm f @ 152 mm c/c 24.90 2 4.46 58 0.889 240
Thickness T = 381 mm Clear Length 3800 mm Total Length 4562 mm

Out side wall 2


Out side steel c 20 mm f @ 152 mm c/c 3.7 2 24.90 328 2.469 20170
In side steel d 20 mm f @ 203 mm c/c 3.7 2 24.90 246 2.469 15130
Distribution j 12 mm f @ 203 mm c/c 24.90 4 4.46 88 0.889 350
Thickness T = 381 mm Clear Height 3800 mm Total Height 4562 mm

Top Corner 2 e 12 mm f @ 152 mm c/c 2.562 2 24.90 164 0.889 3630


Bottom Corner 2 f 12 mm f @ 152 mm c/c 2.562 2 24.90 164 0.889 3630
Hunch 4 g 12 mm f @ 152 mm c/c 1.54 4 24.90 164 0.889 3630

Total steel Required 88140 Kg


88.14 Tons

You might also like