1.1 Beam Properties


Left Support Middle Right Support Shape beff AREA (A)
L-Span
t
Floor ETABS ID (total) Left Right Left Right
b h b h b h Left Middle Right Middle Middle
Support Support Support Support
(m) (cm) (cm) (cm) (cm) (cm) (cm) (T/L/N) (T/L/N) (T/L/N) (cm) (cm) (cm) (cm) (cm²) (cm²) (cm²)
PC1 (B2052) 16,000 50 100 50 100 50 100 L L L 15 140 140 140 6350 6350 6350
PC2 (2028) 16,000 70 90 70 90 70 90 T T T 15 310 310 310 9900 9900 9900
PC3 (B1949) 16,000 70 90 70 90 70 90 T T T 15 310 310 310 9900 9900 9900
PC4 (B1831) 16,000 80 90 80 90 80 90 T T T 15 320 320 320 10800 10800 10800
PC5 (B1802) 24,000 90 150 90 150 90 150 T T T 13 298 298 298 16204 16204 16204
PC6 (B1799) 21,762 60 120 60 120 60 120 T T T 13 268 268 268 9904 9904 9904
PC7 (B1903) 16,151 80 130 80 130 80 130 T T T 13 288 288 288 13104 13104 13104
PC8 (B2312) 19,726 60 110 60 110 60 110 L L T 13 138 138 268 7614 7614 9304
PC9 (B2311) 21,243 40 90 40 90 40 90 L L T 13 104 104 248 4432 4432 6304
PC10 (B2310) 22,080 80 150 80 150 80 150 T L T 20 400 200 400 18400 14400 18400
PC11 (1479) 25,286 90 150 90 150 90 150 L T T 13 168 298 298 14514 16204 16204
LT.5 PC12 (B2304) 14,862 40 90 40 90 40 90 L L T 13 118 118 248 4614 4614 6304
PC13 (B1879) CL 4,525 40 85 40 85 40 85 T T T 13 248 248 248 6104 6104 6104
PC14 (B1762) BP 9,000 40 85 40 85 40 85 L L L 13 118 118 118 4414 4414 4414
PC15 (B1513) 16,850 80 150 80 150 80 150 T T T 20 400 400 400 18400 18400 18400
PC16 (B1509) 16,850 80 120 80 120 80 120 T T T 20 400 400 400 16000 16000 16000
PC17 (B1507) 16,850 70 120 70 120 70 120 T T T 20 390 390 390 14800 14800 14800
PC18 (B1506) 16,850 70 110 70 110 70 110 T T T 20 390 390 390 14100 14100 14100
PC19 (B1501) 16,850 70 90 70 90 70 90 T T T 15 310 310 310 9900 9900 9900
PC20 (B1500) 16,850 70 90 70 90 70 90 T T T 15 310 310 310 9900 9900 9900
PC21 (B1499) 16,850 60 90 60 90 60 90 T T T 15 300 300 300 9000 9000 9000
PC22 (B1498) 16,850 60 90 60 90 60 90 T T T 15 300 300 300 9000 9000 9000
PC23 (B1497) 16,850 80 90 80 90 80 90 T T T 15 320 320 320 10800 10800 10800

Post-tensioning Beam – Bintaro X Change Tahap II 1


PT VSL Jaya Indonesia
Penjernihan I No. 1-1A
Jakarta 10210 – INDONESIA By:PAT

Left Support Middle Right Support Shape beff AREA (A)


L-Span
t Left Right Left Right
Floor ETABS ID (total) b h b h b h Left Middle Right Middle Middle
Support Support Support Support
(m) (cm) (cm) (cm) (cm) (cm) (cm) (T/L/N) (T/L/N) (T/L/N) (cm) (cm) (cm) (cm) (cm²) (cm²) (cm²)
PC24 (B1523) 16,208 70 100 70 100 70 100 T T T 15 310 310 310 10600 10600 10600
PC25 (B1316) 15,629 70 100 70 100 70 100 T T T 15 310 310 310 10600 10600 10600
PC26 (B1274) 24,027 90 140 90 140 90 140 T T T 15 330 330 330 16200 16200 16200
PC27 (B1169) 13,900 45 95 45 95 45 95 T T T 15 285 285 285 7875 7875 7875
PC28 (B899) 13,800 70 90 70 90 70 90 T T T 13 278 278 278 9004 9004 9004
PC29 (B897) 13,800 70 90 70 90 70 90 T T T 13 278 278 278 9004 9004 9004
PC30 (B723) CL 5,650 50 100 50 100 50 100 T T T 20 370 370 370 11400 11400 11400
PC31 (B724) BP 8,000 50 100 50 100 50 100 T T T 20 370 370 370 11400 11400 11400
LT.5
PC32 (B169) CL 5,285 50 100 50 100 50 100 T T T 20 370 370 370 11400 11400 11400
PC33 (B204) BP 7,158 50 100 50 100 50 100 T T T 20 370 370 370 11400 11400 11400
PC34 (B49) CL 5,613 50 100 50 100 50 100 L L L 20 170 170 170 7400 7400 7400
PC35 (B50) BP 6,981 50 100 50 100 50 100 L L L 20 170 170 170 7400 7400 7400
PC36 (B150) CL 5,008 50 100 50 150 50 100 T T T 13 258 258 258 7704 10204 7704
PC37 (B487) BP 15,005 50 100 50 100 50 100 T T T 13 258 258 258 7704 7704 7704
PC38 (B747) 14,556 50 100 50 100 50 100 T T T 13 258 258 258 7704 7704 7704
PC39 (B1111) 20,985 60 140 60 140 60 140 T T T 15 300 300 300 12000 12000 12000

Post-tensioning Beam – Bintaro X Change Tahap II 2


PT VSL Jaya Indonesia
Penjernihan I No. 1-1A
Jakarta 10210 – INDONESIA By:PAT

1.2 Layout of Prestressed Tendon (Eccentricity)


c.g.s ECCENTRICITY
e
Floor ETABS ID Yleft Yφleft Mid Cover Yφright Yright
e1 e2 e3 e4
(m) (m) (m) (m) (m) (m) (m) (m) (m)
PC1 (B2052) 0,590 0,502 0,150 0,502 0,590 0,088 0,352 0,352 0,088
PC2 (2028) 0,586 0,499 0,150 0,499 0,586 0,087 0,349 0,349 0,087
PC3 (B1949) 0,586 0,499 0,150 0,499 0,586 0,087 0,349 0,349 0,087
PC4 (B1831) 0,575 0,490 0,150 0,490 0,575 0,085 0,340 0,340 0,085
PC5 (B1802) 0,864 0,721 0,150 0,721 0,864 0,143 0,571 0,571 0,143
PC6 (B1799) 0,746 0,627 0,150 0,627 0,746 0,119 0,477 0,477 0,119
PC7 (B1903) 0,771 0,647 0,150 0,647 0,771 0,124 0,497 0,497 0,124
PC8 (B2312) 0,615 0,522 0,150 0,583 0,691 0,093 0,372 0,433 0,108
PC9 (B2311) 0,522 0,448 0,150 0,522 0,615 0,074 0,298 0,372 0,093
PC10 (B2310) 0,976 0,811 0,150 0,811 0,976 0,165 0,661 0,661 0,165
PC11 (1479) 0,798 0,668 0,150 0,721 0,864 0,130 0,518 0,571 0,143
LT.5 PC12 (B2304) 0,535 0,458 0,150 0,522 0,615 0,077 0,308 0,372 0,093
PC13 (B1879) CL 0,584 0,677 0,700 0,092 0,023
PC14 (B1762) BP 0,700 0,662 0,508 0,508 0,508 0,038 0,154
PC15 (B1513) 0,976 0,811 0,150 0,811 0,976 0,165 0,661 0,661 0,165
PC16 (B1509) 0,800 0,670 0,150 0,670 0,800 0,130 0,520 0,520 0,130
PC17 (B1507) 0,816 0,683 0,150 0,683 0,816 0,133 0,533 0,533 0,133
PC18 (B1506) 0,754 0,633 0,150 0,633 0,754 0,121 0,483 0,483 0,121
PC19 (B1501) 0,586 0,499 0,150 0,499 0,586 0,087 0,349 0,349 0,087
PC20 (B1500) 0,586 0,499 0,150 0,499 0,586 0,087 0,349 0,349 0,087
PC21 (B1499) 0,600 0,510 0,150 0,510 0,600 0,090 0,360 0,360 0,090
PC22 (B1498) 0,600 0,510 0,150 0,510 0,600 0,090 0,360 0,360 0,090
PC23 (B1497) 0,575 0,490 0,150 0,490 0,575 0,085 0,340 0,340 0,085

Post-tensioning Beam – Bintaro X Change Tahap II 3


PT VSL Jaya Indonesia
Penjernihan I No. 1-1A
Jakarta 10210 – INDONESIA By:PAT

c.g.s ECCENTRICITY

e
Floor ETABS ID Yleft Yφleft Mid Cover Yφright Yright
e1 e2 e3 e4
(m) (m) (m) (m) (m) (m) (m) (m) (m)
PC24 (B1523) 0,644 0,545 0,150 0,545 0,644 0,099 0,395 0,395 0,099
PC25 (B1316) 0,644 0,545 0,150 0,545 0,644 0,099 0,395 0,395 0,099
PC26 (B1274) 0,839 0,701 0,150 0,701 0,839 0,138 0,551 0,551 0,138
PC27 (B1169) 0,658 0,556 0,150 0,556 0,658 0,102 0,406 0,406 0,102
PC28 (B899) 0,566 0,482 0,150 0,482 0,566 0,083 0,332 0,332 0,083
PC29 (B897) 0,566 0,482 0,150 0,482 0,566 0,083 0,332 0,332 0,083
PC30 (B723) CL 0,725 0,825 0,850 0,100 0,025
PC31 (B724) BP 0,850 0,825 0,725 0,725 0,725 0,025 0,100
LT.5
PC32 (B169) CL 0,725 0,825 0,850 0,100 0,025
PC33 (B204) BP 0,850 0,825 0,725 0,725 0,725 0,025 0,100
PC34 (B49) CL 0,630 0,806 0,850 0,176 0,044
PC35 (B50) BP 0,850 0,806 0,630 0,630 0,630 0,044 0,176
PC36 (B150) CL 0,725 0,825 0,850 0,100 0,025
PC37 (B487) BP 0,850 0,811 0,653 0,653 0,653 0,039 0,158
PC38 (B747) 0,653 0,552 0,150 0,552 0,653 0,101 0,402 0,402 0,101
PC39 (B1111) 0,888 0,740 0,150 0,740 0,888 0,148 0,590 0,590 0,148

Post-tensioning Beam – Bintaro X Change Tahap II 4


PT VSL Jaya Indonesia
Penjernihan I No. 1-1A
Jakarta 10210 – INDONESIA By:PAT

1.3 Moment of Prestressed Beams


BENDING MOMENT
Mtotal
Left Support Middle Right Support
Floor ETABS ID MDL MDL MDL
MLL MLL MLL LEFT MIDDLE RIGHT
MSW MSDL MSW MSDL MSW MSDL
(kg.m) (kg.m) (kg.m) (kg.m) (kg.m) (kg.m) (kg.m) (kg.m) (kg.m) (kg.m) (kg.m) (kg.m)
PC1 (B2052) -47463 -19853 -50672 51010 17865 73308 -40487 -16544 -46047 117988 142183 103078
PC2 (2028) -91711 -17420 -73120 87685 16659 75793 -81107 -16642 -62239 182252 180138 159988
PC3 (B1949) -82454 -15282 -59681 76502 13849 56118 -72606 -14982 -48661 157417 146469 136248
PC4 (B1831) -72253 -15615 -55890 62094 12871 49351 -78664 -17330 -56757 143757 124316 152751
PC5 (B1802) -380332 -81627 -213792 318559 54659 197663 -369799 -69538 -197893 675751 570881 637230
PC6 (B1799) -30549 2643 -20191 197323 29811 146932 -78922 -15588 -64821 48097 374066 159331
PC7 (B1903) -206727 -48742 -146011 159120 41530 126928 -150262 -33294 -113825 401480 327579 297381
PC8 (B2312) -18117 -11231 -29794 120830 34508 94935 103509 24414 64922 59141 250273 192846
PC9 (B2311) -38460 -3633 -25680 62389 11455 48734 -23633 -12365 -20789 67773 122578 56787
PC10 (B2310) -94895 -22169 -90750 346441 86155 396861 -239864 -46005 -247866 207813 829457 533735
PC11 (1479) -270134 -95276 -153832 163481 58533 90230 -238879 -85947 -139094 519242 312244 463920
LT.5 PC12 (B2304) 10388 -80 6126 49439 2418 29508 -7021 -1078 -9195 16434 81365 17295
PC13 (B1879) CL -17985 -18082 -28051 -1558 -3678 4246 -929 -2445 -1696 64117 991 5069
PC14 (B1762) BP -20252 -12112 -24566 7667 4174 -13162 -17668 -7481 -17464 56930 1320 42613
PC15 (B1513) -86164 -27179 -148029 140072 44232 277403 -211017 -58599 -341840 261372 461708 611456
PC16 (B1509) -123250 -34197 -271482 85552 23968 208287 -105449 -21172 -229352 428929 317808 355973
PC17 (B1507) -124282 -23285 -266845 87742 13098 206998 -113435 -14076 -239808 414412 307838 367319
PC18 (B1506) -102165 -20547 -106333 77693 14092 90084 -108553 -16917 -124681 229045 181869 250152
PC19 (B1501) -94899 -19994 -70410 68056 13222 48215 -88421 -19351 -75489 185303 129493 183261
PC20 (B1500) -84734 -18405 -69235 74230 15377 65813 -87479 -20962 -78461 172374 155421 186901
PC21 (B1499) -79913 -18602 -68285 64897 14337 58731 -80471 -16065 -77984 166799 137965 174520
PC22 (B1498) -76123 -17767 -65150 61359 13366 55726 -79107 -16580 -76125 159040 130451 171812
PC23 (B1497) -93209 -19066 -74106 84014 16054 71255 -102428 -18888 -87794 186381 171322 209110

Post-tensioning Beam – Bintaro X Change Tahap II 5


PT VSL Jaya Indonesia
Penjernihan I No. 1-1A
Jakarta 10210 – INDONESIA By:PAT

BENDING MOMENT
Mtotal
Left Support Middle Right Support
Floor ETABS ID MDL MDL MDL
MLL MLL MLL LEFT MIDDLE RIGHT
MSW MSDL MSW MSDL MSW MSDL
(kg.m) (kg.m) (kg.m) (kg.m) (kg.m) (kg.m) (kg.m) (kg.m) (kg.m) (kg.m) (kg.m) (kg.m)
PC24 (B1523) 26380 5449 13721 64061 12408 48185 -137610 -32693 -114470 45550 124653 284774
PC25 (B1316) -10356 -7202 -20845 79810 12706 54671 -139042 -25368 -104982 38403 147187 269393
PC26 (B1274) -232686 -48865 -205604 204906 47341 178841 -235616 -61062 -196651 487156 431087 493329
PC27 (B1169) -53483 -57380 -31999 34193 39108 21894 -33921 -34224 -22489 142862 95195 90634
PC28 (B899) -72795 -33570 -45902 54971 21627 35058 -87178 -31791 -46162 152267 111656 165131
PC29 (B897) -59524 -30640 -37870 43485 19175 28337 -94430 -32180 -53019 128034 90997 179629
PC30 (B723) CL -6258 -8721 -5588 -94600 -62036 -76652 -94600 -86961 -114025 20568 233288 295586
PC31 (B724) BP -53784 -47092 -51742 6203 -11090 -20184 6203 6205 -6416 152618 25070 5993
LT.5
PC32 (B169) CL -5254 -8327 -5458 -44612 -46899 -60367 -56260 -67530 -96206 19039 151878 219996
PC33 (B204) BP -39866 -32548 -41702 -15821 19087 -25352 -11845 -19391 -13197 114116 22086 44434
PC34 (B49) CL -1558 -2040 -2430 -14865 -15984 -12466 -18270 -29164 -21127 6028 43315 68561
PC35 (B50) BP -28495 -15335 -20387 -10627 -5863 20261 8710 -3137 7706 64217 3771 13279
PC36 (B150) CL -41060 -44233 -27534 -7258 -10267 -4075 -4675 -6834 -2707 112826 21600 14215
PC37 (B487) BP -47865 -25322 -37761 32718 15275 24671 -46810 -21409 -38393 110948 72663 106612
PC38 (B747) -52053 -42948 -63692 36777 32688 49105 -50421 -39141 -75308 158693 118570 164871
PC39 (B1111) -78242 -85078 -62487 75702 96286 41664 -915 -6254 -3874 225807 213652 11044

Post-tensioning Beam – Bintaro X Change Tahap II 6


PT VSL Jaya Indonesia
Penjernihan I No. 1-1A
Jakarta 10210 – INDONESIA By:PAT

1.4 Output of Balancing Load Due to Prestressed Tendon


INPUT

type Balancing Load q Moments due to differences of c.g.c


Floor ETABS ID Used Pe P/A
Beam
q1 q2 q3 q4 Mx1 Mx2
(kg) (kg/cm²) (kg/m) (kg/m) (kg/m) (kg/m) (kg.m) (kg.m)
PC1 (B2052) 220000 34,646 15136,99 3784,25 3784,25 15136,99 - -
PC2 (2028) 346000 34,949 23590,91 5897,73 5897,73 23590,91 - -
PC3 (B1949) 340000 34,343 23181,82 5795,45 5795,45 23181,82 - -
PC4 (B1831) 280000 25,926 18593,75 4648,44 4648,44 18593,75 - -
PC5 (B1802) 560000 34,559 27778,40 6944,60 6944,60 27778,40 - -
PC6 (B1799) 500000 50,485 25173,46 6293,36 6293,36 25173,46 - -
PC7 (B1903) 380000 28,999 36171,24 9042,81 9042,81 36171,24 - -
PC8 (B2312) 380000 49,908 18147,55 4536,89 5282,61 21130,44 - 29018,40
PC9 (B2311) 220000 49,639 7259,97 1814,99 2267,75 9070,99 - 20430,35
PC10 (B2310) 940000 65,278 63709,42 15927,36 15927,36 63709,42 110688,41 110688,41
PC11 (1479) 440000 30,316 17833,28 4458,32 4915,61 19662,45 29238,45 -

LT.5 PC12 (B2304) 120000 26,008 8358,09 2089,52 2527,03 10108,11 - 9663,57
PC13 (B1879) CL 120000 19,659 6770,45 27081,78 - -
PC14 (B1762) BP 120000 27,186 11395,53 2848,88 - -
PC15 (B1513) 480000 26,087 55864,04 13966,01 13966,01 55864,04 - -
PC16 (B1509) 510000 31,875 46703,44 11675,86 11675,86 46703,44 - -
PC17 (B1507) 515000 34,797 48337,90 12084,47 12084,47 48337,90 - -
PC18 (B1506) 300000 21,277 25539,19 6384,80 6384,80 25539,19 - -
PC19 (B1501) 300000 30,303 18443,15 4610,79 4610,79 18443,15 - -
PC20 (B1500) 345000 34,848 21209,62 5302,41 5302,41 21209,62 - -
PC21 (B1499) 313000 34,778 19843,68 4960,92 4960,92 19843,68 - -
PC22 (B1498) 300000 33,333 19019,50 4754,88 4754,88 19019,50 - -
PC23 (B1497) 370000 34,259 22154,20 5538,55 5538,55 22154,20 - -

Post-tensioning Beam – Bintaro X Change Tahap II 7


PT VSL Jaya Indonesia
Penjernihan I No. 1-1A
Jakarta 10210 – INDONESIA By:PAT

INPUT

type Balancing Load q Moments due to differences of c.g.c


Floor ETABS ID Used Pe P/A
Beam
q1 q2 q3 q4 Mx1 Mx2
(kg) (kg/cm²) (kg/m) (kg/m) (kg/m) (kg/m) (kg.m) (kg.m)
PC24 (B1523) 280000 26,415 21075,83 5268,96 5268,96 21075,83 - -
PC25 (B1316) 300000 28,302 24285,35 6071,34 6071,34 24285,35 - -
PC26 (B1274) 480000 29,630 22911,38 5727,85 5727,85 22911,38 - -
PC27 (B1169) 220000 27,937 23131,01 5782,75 5782,75 23131,01 - -
PC28 (B899) 230000 25,544 20078,25 5019,56 5019,56 20078,25 - -
PC29 (B897) 260000 28,876 22697,15 5674,29 5674,29 22697,15 - -
PC30 (B723) CL 300000 26,316 11788,42 47153,67 - -
PC31 (B724) BP 300000 26,316 23519,74 5879,93 - -
LT.5
PC32 (B169) CL 140000 12,281 6287,14 25148,54
PC33 (B204) BP 140000 12,281 13709,57 3427,39
PC34 (B49) CL 30000 4,054 2097,13 8388,52
PC35 (B50) BP 30000 4,054 5423,47 1355,87
PC36 (B150) CL 120000 15,576 9440,41 37761,65 - -
PC37 (B487) BP 120000 15,576 4206,71 1051,68 - -
PC38 (B747) 240000 31,153 22776,03 5694,01 5694,01 22776,03 - -
PC39 (B1111) 200000 16,667 13397,82 3349,45 3349,45 13397,82 - -

Post-tensioning Beam – Bintaro X Change Tahap II 8


PT VSL Jaya Indonesia
Penjernihan I No. 1-1A
Jakarta 10210 – INDONESIA By:PAT

1.5 Prestrest Momen


OUTPUT

Prestressed Moment
ETABS ID NOS
Floor
Left Support Middle Right Support
(kg.m) (kg.m) (kg.m)

PC1 (B2052) 22 44219 -44449 25519


PC2 (2028) 34 81933 -62299 61656
PC3 (B1949) 34 80763 -62463 60985
PC4 (B1831) 28 60227 -39320 54052
PC5 (B1802)
PC6 (B1799) 48 25261 -164155 59731

PC7 (B1903) 38 118874 -117369 133967


PC8 (B2312) 38 18639 -128032 -6351
PC9 (B2311) 22 21277 -61203 11557
PC10 (B2310) 94 109773 -394751 426021
PC11 (1479) 44 152112 -134923 160620
LT.5
PC12 (B2304) 12 -29890 -45568 -25771
PC13 (B1879) CL
PC14 (B1762) BP
PC15 (B1513) 48 116611 -200926 235686
PC16 (B1509) 48 193241 -138518 165842
PC17 (B1507) 48 192650 -134173 169046
PC18 (B1506) 30 99809 -72347 101666
PC19 (B1501) 30 76124 -48871 67476
PC20 (B1500) 34 74190 -61186 72194
PC21 (B1499) 32 70361 -55196 67337
PC22 (B1498) 30 67965 -51724 64358
PC23 (B1497) 38 83776 -68838 81680

Post-tensioning Beam – Bintaro X Change Tahap II 9


PT VSL Jaya Indonesia
Penjernihan I No. 1-1A
Jakarta 10210 – INDONESIA By:PAT

OUTPUT

Prestressed Moment
ETABS ID NOS
Floor
Left Support Middle Right Support
(kg.m) (kg.m) (kg.m)
PC24 (B1523) 28 -56820 -66966 109835
PC25 (B1316) 30 -45663 -57761 83977
PC26 (B1274) 48 118838 -121851 119970
PC27 (B1169) 22 48655 -34546 36647
PC28 (B899) 22 49718 -35599 38727
PC29 (B897) 26 53255 -37000 45840
PC30 (B723) CL 30 2307 77298 111584
PC31 (B724) BP 30 44686 15043 -3615
LT.5
PC32 (B169) CL
PC33 (B204) BP
PC34 (B49) CL
PC35 (B50) BP
PC36 (B150) CL 12 74049 40280 -655
PC37 (B487) BP 12 20325 5238 1019
PC38 (B747) 24 57289 -39601 59554
PC39 (B1111) 20 76297 -106844 -75211

Post-tensioning Beam – Bintaro X Change Tahap II 10


PT VSL Jaya Indonesia
Penjernihan I No. 1-1A
Jakarta 10210 – INDONESIA By:PAT

1.6 Stressed Check


Allowable Stress
Concrete Grade = fc'= 35.0 MPa
fci' = 80%fc' = 28.0 MPa fci' = concrete strength at stressing
ALLOWABLE STRESS OF PRESTRESSED CONCRETE

Service Conditions Transfer Conditions


Minimum and
Minimum and Allowable Stress Allowable Stress
Maximum limit
Maximum limit of
of Allowable
Allowable Stress (MPa) (kg/cm²) (MPa) (kg/cm²)
Stress
fcs -15.75 -160.55 fct -16.80 -171.43
fts 3.67 37.39 ftt 1.32 13.50
√fc' 5,92 60,31

Post-tensioning Beam – Bintaro X Change Tahap II 11


PT VSL Jaya Indonesia
Penjernihan I No. 1-1A
Jakarta 10210 – INDONESIA By:PAT

1.6.1 Transfer Conditions


Allowable Stress of Transfer Conditions:
-0.6*(fc') ≤ ft ≤ 0.25*(fc')^0.5
OK
-171.43kg/cm2 ≤ ft ≤ 13.50 kg/cm2
Tumpuan Kiri Lapangan Tumpuan Kanan
Floor ETABS ID Serat Atas Serat Bawah Serat Atas Serat Bawah Serat Atas Serat Bawah
(kg/cm²) Status (kg/cm²) Status (kg/cm²) Status (kg/cm²) Status (kg/cm²) Status (kg/cm²) Status
PC1 (B2052) -43,82 OK -36,36 OK -39,90 OK -42,00 OK -33,75 OK -50,87 OK
PC2 (2028) -43,06 OK -37,4l8 OK -47,10 OK -29,93 OK -37,55 OK -47,78 OK
PC3 (B1949) -45,63 OK -30,64 OK -41,66 OK -38,06 OK -40,05 OK -41,07 OK
PC4 (B1831) -29,95 OK -31,47 OK -36,70 OK -19,53 OK -24,60 OK -40,94 OK
PC5 (B1802)
PC6 (B1799) -59,13 OK -59,83 OK -60,73 OK -57,20 OK -56,65 OK -63,91 OK
PC7 (B1903) -18,05 OK -57,51 OK -39,17 OK -26,76 OK -35,88 OK -31,55 OK
PC8 (B2312) -60,83 OK -56,03 OK -42,16 OK -79,68 OK -12,99 OK -107,27 OK
PC9 (B2311) -43,67 OK -78,77 OK -47,85 OK -72,98 OK -35,05 OK -54,04 OK
PC10 (B2310) -64,43 OK -68,74 OK -54,90 OK -106,09 OK -93,40 OK 1,93 OK
PC11 (1479) -14,15 OK -56,40 OK -32,79 OK -30,80 OK -23,11 OK -43,96 OK

LT.5 PC12 (B2304) -55,63 OK 6,02 OK -26,38 OK -36,76 OK -36,35 OK 7,73 OK


PC13 (B1879) CL
PC14 (B1762) BP
PC15 (B1513) -37,32 OK -18,35 OK -18,18 OK -53,99 OK -39,29 OK -14,66 OK
PC16 (B1509) -57,02 OK 1,53 OK -22,99 OK -66,53 OK -54,31 OK -3,88 OK
PC17 (B1507) -61,22 OK 2,19 OK -27,05 OK -70,47 OK -57,86 OK -4,94 OK
PC18 (B1506) -28,54 OK -17,39 OK -23,33 OK -28,75 OK -27,57 OK -19,49 OK
PC19 (B1501) -33,43 OK -39,80 OK -40,04 OK -27,44 OK -31,89 OK -42,68 OK
PC20 (B1500) -42,06 OK -39,02 OK -41,93 OK -39,25 OK -39,94 OK -42,98 OK
PC21 (B1499) -42,19 OK -38,37 OK -40,90 OK -40,95 OK -40,36 OK -42,03 OK

PC22 (B1498) -40,92 OK -35,81 OK -39,44 OK -38,77 OK -37,71 OK -42,23 OK

PC23 (B1497) -42,40 OK -36,60 OK -41,49 OK -38,21 OK -37,83 OK -44,69 OK

Post-tensioning Beam – Bintaro X Change Tahap II 12


PT VSL Jaya Indonesia
Penjernihan I No. 1-1A
Jakarta 10210 – INDONESIA By:PAT

Tumpuan Kiri LLapangan Tumpuan Kanan


Floor ETABS ID Serat Atas Serat Bawah Serat Atas Serat Bawah Serat Atas Serat Bawah
(kg/cm²) Status (kg/cm²) Status (kg/cm²) Status (kg/cm²) Status (kg/cm²) Status (kg/cm²) Status
PC24 (B1523) -45,19 OK -5,50 OK -25,94 OK -40,38 OK -28,15 OK -36,38 OK
PC25 (B1316) -48,42 OK -5,89 OK -37,43 OK -25,80 OK -19,26 OK -58,73 OK
PC26 (B1274) -18,36 OK -59,53 OK -45,79 OK -18,51 OK -18,07 OK -59,95 OK
PC27 (B1169) -34,58 OK -29,01 OK -29,93 OK -39,49 OK -37,06 OK -23,43 OK
PC28 (B899) -23,31 OK -41,45 OK -36,22 OK -19,62 OK -10,44 OK -63,23 OK
PC29 (B897) -35,45 OK -31,48 OK -33,95 OK -34,01 OK -14,88 OK -66,26 OK

PC30 (B723) CL -42,20 OK -1,38 OK

LT.5 PC31 (B724) BP -30,80 OK -31,37 OK -27,29 OK -40,61 OK -30,33 OK -32,61 OK


PC32 (B169) CL
PC33 (B204) BP
PC34 (B49) CL
PC35 (B50) BP
PC36 (B150) CL -16,52 OK -21,71 OK
PC37 (B487) BP -7,27 OK -39,10 OK -30,58 OK 4,71 OK 2,73 OK -57,88 OK
PC38 (B747) -43,73 OK -23,34 OK -32,12 OK -45,16 OK -45,72 OK -19,61 OK
PC39 (B1111) -22,11 OK -15,28 OK -8,76 OK -38,38 OK -38,60 OK 13,28 OK

1.6.2 Service Conditions


Allowable Stress of Service Conditions:
ft < 0.62*(fc')^0.5 Kelas
ft < 37.39 kg/cm2 UN
0.62*(fc')^0.5 ≤ ft ≤ (fc')^0.5 Kelas
37.39 kg/cm2 ≤ ft ≤ 60,31 kg/cm2 TR
ft > (fc')^0.5 Kelas
> 60,31 kg/cm2 CR

Post-tensioning Beam – Bintaro X Change Tahap II 13


PT VSL Jaya Indonesia
Penjernihan I No. 1-1A
Jakarta 10210 – INDONESIA By:PAT

Tumpuan Kiri Lapangan Tumpuan Kanan


Floor ETABS ID Serat Atas Serat Bawah Serat Atas Serat Bawah Serat Atas Serat Bawah
(kg/cm²) Status (kg/cm²) Status (kg/cm²) Status (kg/cm²) Status (kg/cm²) Status (kg/cm²) Status
PC1 (B2052) 14,80 UN -105,90 OK -100,15 OK 59,75 TR 17,34 UN -109,56 OK
PC2 (2028) 6,77 UN -112,95 OK -83,96 OK 56,67 TR 5,94 UN -111,40 OK

PC3 (B1949) -2,46 OK -93,94 OK -69,28 OK 30,97 UN -3,04 OK -92,86 OK

PC4 (B1831) 6,77 UN -83,78 OK -59,20 OK 32,94 UN 12,71 UN -94,28 OK

PC5 (B1802)
PC6 (B1799) -43,24 OK -62,39 OK -117,10 OK 59,00 TR -18,88 OK -102,43 OK
PC7 (B1903) 38,90 TR -127,87 OK -79,51 OK 44,55 TR 10,26 UN -86,17 OK
PC8 (B2312) -27,41 OK -78,40 OK -117,82 OK 36,08 UN 27,24 UN -155,84 OK
PC9 (B2311) 1,36 UN -120,16 OK -116,96 OK 43,45 TR -7,81 OK -93,39 OK
PC10 (B2310) -38,25 OK -75,00 OK -157,29 OK 57,81 TR -36,56 OK -78,16 OK
PC11 (1479) 56,33 TR -128,77 OK -58,53 OK 15,51 UN 26,52 UN -100,13 OK

PC12 (B2304) -39,60 OK -6,12 OK -62,17 OK 26,90 UN -24,11 OK -8,07 OK


LT.5
PC13 (B1879) CL
PC14 (B1762) BP
PC15 (B1513) -7,29 UN -61,11 UN -59,95 UN 37,00 UN 22,71 UN -116,99 UN
PC16 (B1509) 12,32 UN -120,26 OK -65,49 OK 35,36 UN 3,77 UN -103,17 OK

PC17 (B1507) 9,13 UN -128,22 OK -69,20 OK 38,37 TR 4,48 UN -118,33 OK

PC18 (B1506) 8,40 UN -86,02 OK -46,43 OK 33,59 UN 12,82 UN -95,67 OK

PC19 (B1501) 15,10 UN -115,19 OK -63,83 OK 32,38 UN 17,85 UN -120,33 OK

PC20 (B1500) 5,98 UN -111,19 OK -74,04 OK 38,42 TR 12,86 UN -124,03 OK

PC21 (B1499) 8,08 UN -120,50 OK -71,56 OK 38,79 TR 12,86 UN -130,05 OK

PC22 (B1498) 7,14 UN -114,29 OK -68,32 OK 36,65 UN 14,42 UN -128,85 OK

OK OK OK
PC23 (B1497) 5,91 UN -105,32 -74,38 36,72 UN 15,62 UN -122,51

Post-tensioning Beam – Bintaro X Change Tahap II 14


PT VSL Jaya Indonesia
Penjernihan I No. 1-1A
Jakarta 10210 – INDONESIA By:PAT

Tumpuan Kiri Lapangan Tumpuan Kanan


Floor ETABS ID Serat Atas Serat Bawah Serat Atas Serat Bawah Serat Atas Serat Bawah
(kg/cm²) Status (kg/cm²) Status (kg/cm²) Status (kg/cm²) Status (kg/cm²) Status (kg/cm²) Status
PC24 (B1523) -30,35 OK -19,29 OK -46,54 OK 10,04 UN 34,61 UN -136,98 OK
PC25 (B1316) -30,83 OK -23,71 OK -59,50 OK 28,22 UN 36,38 UN -145,49 OK
PC26 (B1274) 35,80 UN -127,45 OK -84,57 OK 52,50 TR 36,70 UN -128,79 OK
PC27 (B1169) 15,00 UN -124,63 OK -55,58 OK 34,31 UN -3,33 UN -83,35 OK
PC28 (B899) 22,79 UN -107,30 OK -61,39 OK 35,09 UN 34,03 UN -126,32 OK
PC29 (B897) 6,37 UN -88,49 OK -54,32 OK 14,17 UN 34,18 UN -135,53 OK

PC30 (B723) CL 30,94 UN -176,92 OK

LT.5 PC31 (B724) BP 7,01 UN -113,98 OK -29,34 OK -18,35 OK -25,56 OK -28,31 OK


PC32 (B169) CL
PC33 (B204) BP
PC34 (B49) CL
PC35 (B50) BP
PC36 (B150) CL -9,32 OK -27,34 OK
PC37 (B487) BP 26,25 UN -94,17 OK -46,69 OK 42,90 TR 33,16 UN -107,16 OK
PC38 (B747) 15,65 UN -119,10 OK -67,60 OK 37,34 UN 17,45 UN -122,49 OK
PC39 (B1111) 15,76 UN -72,82 OK -39,83 OK 23,45 UN -30,58 UNK 7,43 OK

Post-tensioning Beam – Bintaro X Change Tahap II 15