You are on page 1of 3

HINDRANCE SHEET

Sl NO Nature of Hindrance Date of Occurance Date of Clearance Period

Block-D 1st Floor Starter

1 Block-E
Slab Shuttering work progress
2 is very Slow due to Man 06.05.23
Power Shorteg.
3
Work stope due to heavy rain 5 pm to 6
4 18.05.23 18.05.23
for 1.0 hours pm
5
E Block ELW 2 & 3 Casting
6 delayed due to Shorteg of 20.05.23 25.05.23
Man Power and Materials
7

Block- E 1st Floor Slab


8 Shuttering work progress very 10.05.23 25.05.23
slow due to Manpower

9
10
11
12
13
14
15
ANCE SHEET
Next
Effective Remarks and Signature of Clent Contractor
Weightage Days of References Engineer with date Representative
of Hindrance Signature with Name
Hindrance & Date

Target Date
21.05.23

11%

50%

50%
9038350561

You might also like