This document provides a checklist for contractors to verify key steps in a reinforced concrete construction (RCC) project. It outlines items to check before, during, and after concrete work, including verifying reinforcement and shuttering materials, concrete mix design and properties, construction alignment and rigidity, curing time, and dimensions. The checklist aims to ensure quality control and compliance with drawings, specifications, and testing at each stage of the RCC work. Contractors and project management must sign off to confirm all items were properly checked.
This document provides a checklist for contractors to verify key steps in a reinforced concrete construction (RCC) project. It outlines items to check before, during, and after concrete work, including verifying reinforcement and shuttering materials, concrete mix design and properties, construction alignment and rigidity, curing time, and dimensions. The checklist aims to ensure quality control and compliance with drawings, specifications, and testing at each stage of the RCC work. Contractors and project management must sign off to confirm all items were properly checked.
This document provides a checklist for contractors to verify key steps in a reinforced concrete construction (RCC) project. It outlines items to check before, during, and after concrete work, including verifying reinforcement and shuttering materials, concrete mix design and properties, construction alignment and rigidity, curing time, and dimensions. The checklist aims to ensure quality control and compliance with drawings, specifications, and testing at each stage of the RCC work. Contractors and project management must sign off to confirm all items were properly checked.
A Before start of work Check and Verify the following: A-1 Reinforcement / Stark Steel 1 Availability of test reports of steel and reviewed 2 Bar Bending Schedule (BBS) is prepared, reviewed and approved. 3 Reinforcement / Stark steel placed as per approved structural drawing A-2 Shuttering 1 Shuttering scheme drawing is available 2 All the shuttering materials , components available and in good condition A-3 Concrete 1 Concrete Grade mix design is approved , Grade M-____ 2 Raw material Test reports are available and reviewed B During work process Check and Verify the following: B-1 Reinforcement / Stark Steel 1 Cover of the specified size of cover is being fixed properly 2 Is Tying of reinforcement / stark steel done properly? B-2 Shuttering 1 Check line , level , Size and verticality of the structure 2 Application of shuttering oil to the shuttering boards. 3 Does the shuttering have any holes or gaps and if so, are the holes or gaps plugged ? 4 The rigidity of the Supporting system to avoid any failure. B-3 Concreting 1 Sampling of the concrete taken at site ( 150 mm cubes) as per ITP 2 Workability ( slump) of the concrete as per the requirement 3 Are the Needle’s / Vibrators (25,40,60 mm) , available ,and are the spares available ? 4 Batch sheet of the RMC is available and is verified as per the required grade. C Final Inspection Check and Verify the following: Reinforcement / Stark Steel 1 The loose concrete on the reinforcement is cleaned properly by the wire brush 2 Are there any defects Honeycombing, bulging , pin holes etc. 3 Check and Verify for any edges/corners of structure damaged during de- shuttering. 4 Are the dimensions of the casted structure as per the drawing? 5 Is the Curing period of minimum 7 days from the casting date completed and the records maintained? Observations: Whether the above points checked and in order? YES / NO