You are on page 1of 2

ER-CS-IN-SITU RC WORKS-01_SEP 05

CHECKLIST FOR IN-SITU STRUCTURAL WORKS


Contract Name: Road Improvement Works at Weld Road & Block: N.A Date: 25/04/2023
Kelentan Road
Location: BLK 30 2m Wide box culvert drain wall casting and
drain top slab casting at Kelantan road Grid: M To: O RFI Ref No:QJ/ 009/2023
Chainage: 147-157

CHECK 1st 2nd 3rd DESCRIPTION OF DEFECTS, IF ANY


(To be completed by SS) =Ok x= Not Ok (To be completed by SS)
O 1. Control Line Name & Signature of SS (1st Inspection):
V
E 2. Grid Line
R
A 3. Dimension
L
4. Storey Height
L
1. Condition/Gaps
F 2. Position
O
R 3. Fixity / Bracing
M
W
4. Level
O 5. Plumb Date: Time From: Time To:
R
K 6. Storey Height Name & Signature of SS (2nd Inspection):
7. Cleanliness
1. Position
R
E 2. No. & Size
B
A 3. Anchorage / Lapping
R 4. Cover
S
5. Cleanliness
1. Position / Size

2. Trimming Bars Date: Time From: Time To:


S O Name & Signature of SS (3rd Inspection):
E P
R E
V N
I I
C N
E G
S S

Date: Time From: Time To:


I hereby certify that I had duly checked and satisfied that all works are constructed in accordance with Drawings (Architectural,
Structural and Mechanical & Electrical) and Specifications. I have verified that the vertical alignment of structural elements for
lower floor is within the allowable tolerance and any misalignment has been rectified to my satisfaction.

ANANTHARAJ A /
_____________________________________________ 25/04/2023 ____________________
Name & Signature of Contractor’s Representative Date Time
ER-CS-IN-SITU RC WORKS-01_SEP 05
Approve / Disapprove * Remarks by Resident Engineer

_________________________________________
Name & Signature of Resident Engineer

Date: Time From: Time To:


* To delete where not applicable.

CHECKLIST FOR PRIOR INSPECTION OF IN-SITU STRUCTURAL WORKS

Contract Name: Road Improvement Works at Weld Road & Kelantan Road. Block: _30________________
Location/ Storey: 2m Wide box culvert drain at Kelantan Road

CHECK (/ X)
1 Clear & safe access provided Checked by Contractor’s RSO / Safety Supervisor:
along inspection area
Housekeeping & Safety

2 Proper temporary staircase


erected
3 Proper strutting work at lower
storey
4 Perimeter safety barricade
erected at inspection & lower floor
5 Protection to precast staircase
______________________________
Name & Signature / Date & Time

1 Position / Size / Nos of electrical


conduit
2 Position / Size / Nos of sanitary Checked By Contractor ‘s M&E Coordinator:
M & E Works

openings
3 Trimming Bars

4 Foreign object on surface


_____________________________
Name & Signature / Date & Time

1 Typical floor defects checking and


recording completed up to min. 2
levels below current casting level Checked by Contractor’s Project Engineer / Structural Supervisor:
2 Typical floor defects rectified and
closed to min. 4 levels below
Structural Works

current casting level


3 Submitted overall building
verticality check up to min. 2
levels below current casting level
4 Submitted casted floor level
record up to min. 2 levels below
current casting level
5 Submitted soffit level check for ______________________________
precast plank for current casting Name & Signature / Date & Time
level

Note: Contractor to complete all the checks stated above before calling for inspection