HANDING OVER CHECKLIST

PROJECT :

INSPECTION NO. :
BUILDING / BLOCK :
LEVEL / ROOM :
DATE :

Acceptability
Item Description PJSB C.O.W Remarks / Comments
OK Not OK OK Not OK
NATURE OF INSPECTION
1 Ceiling / Skim Coat
2 Window
3 Painting
4 Door
5 Ironmongeries
6 Wall Finishes
7 Floor Finishes
8 Partition
9 Glass Panel
10 Aluminium Lourves
11 Switch and Socket Outlet
12 Sanitary Fitting
13 Electrical Fitting
14 Others

1) Non-conformance 3) Re-inspection

2) Diposition 4) Comments

Checked by (PJSB's Rep): Approved by RE/COW:

_________________________ _________________________
Name : Name :
Date : Date :
Project : Proposed Development of klia2 and Associated Works
Works Package: AF06a - Air Traffic Control Tower
Block / Floor / Room : CENTRAL UTILITY BUILDING / METER ROOM
Drawing Reference :

Acceptability
Item Description Remarks
OK Not OK
ARCHITECTURAL

ELECTRICAL

SANITARY AND FITTING

FRE FIGHTING

ATTENDED & INSPECTED BY


Approved by RE/COW:

_________________________
Name :
Date :

PJSB'S Rep:

_________________________
Name :
PJSB'S Rep:

_________________________
Name :
Date :