: PPCSB/75/PQP/APP/MFL(STR)
Putra Perdana Construction Sdn Bhd
Page 1 of 28
Pre-Concreting Checklist
Project Ref : PPCSB/75 Date :
Acceptability
Item Description Subcon / PPCSB's Remark
R.E. / C.O.W.
Rep.
1st 2nd 1st 2nd
Formwork
1 Dimension (Width & Depth)
2 Setting Out Line (Control Points)
3 Transfer Level
4 Concreting Level (Markon Rebar)
5 Cast In / Box Up
6 Rigidity of Props
7 Tightness of Joints
8 Drop / Step Down
9 Cleanliness
10 Mould Oil
Reinforcement
1 Rebar / BRC - Size / Nos / Type
2 Rebar / BRC Conditions
3 Link - Size / Nos / Type
4 Anchorage
5 Spacing
6 Cover
7 Laps
8 Additional Rebars / Trimmer Bars
Water Proofing
1 Application of Waterproofing Materials
M&E Services
1 M&E Services Checked
Others
1) Non-Conformances 3) Re-Inspection
2) Disposition 4) Comments
Acceptability
Subcon / PPCSB's
Item Description R.E. / C.O.W. Remark
Rep.
1st 2nd 1st 2nd
1 Striking of formwork
2 Visibility of cracks
3 Honeycomb
4 Bulging
5 Accuracy of structural members
dimension
6 Alignment, verticality, level of
structural members
7 Deviation of structural members
8 Steel bars exposed
9 Floor hardener surface level smooth
10 Tie hole
11 Curing
12 As-built
1) Non-Conformances 3) Re-Inspection
2) Disposition 4) Comments
Acceptability
Subcon / PPCSB's
Item Description R.E. / R.A. / C.O.W. Remark
Rep.
1st 2nd 1st 2nd
1 Setting out and alignment
2 Type and dimensions
3 Dimension and thickness of plate
4 Bolt and nut
5 Workmanship and type of welding
6 Grinding of weld area
7 Clearing after grinding
8 Painting and anti-rust
9 Rusting and crack
10 Protection
1) Non-Conformances 3) Re-Inspection
2) Disposition 4) Comments
Scaffolding Checklist
Project Ref : PPCSB/75 Date :
Location : Block No :
Acceptability
Subcon / PPCSB's
Item Description R.E. / C.O.W. Remark
Rep.
1st 2nd 1st 2nd
1 Setting out
2 Condition of scaffolds & accessories
3 Ground condition ( firm / unstable)
if scaffolds started at ground
4 Adequacy of supporting system
if scaffolds rest on temporary support
5 Scaffold base support
6 Verticality of scaffolds
7 Installation of bracing
1) Non-Conformances 3) Re-Inspection
2) Disposition 4) Comments
Project Quality Plan for MARC Service Residence Effective: 08 July 2004
Doc.Ref.: PPCSB/75/PQP/STR/FL/2
Putra Perdana Construction Sdn Bhd
Page 1 of 1
BLOCK :
Date : Requested By :
Attention To : Designation :
Contact No : Contact No :
Fax No : Signature :
INTERVAL
DATE LOCATION ELEMENT GRADE QTY (M3) REMARKS
TIME
Remark : Actual concrete request to be confirmed by phone one day early the casting activity.
Name:
Date:
Project Quality Plan for MARC Service Residence Effective: 08 July 2004
Doc.Ref.: PPCSB/75/PQP/STR/FL/3
Putra Perdana Construction Sdn Bhd
Page 1 of 1
A Before-Application Inspection:
1 Structural Repair (crack/spalling/void)
Surface Preparation (grinding / acid etch /
2
scabbling / needle gun / water blast)
3 Wetting Concrete (with clean water)
Mixing for Slurry Coat
4
(As per Manufacturer's Instruction)
5 Suitable Brush/Spray Equipment Employed
B During-Application Inspection
One (1) coat of Xypex Concentrate applying
1
uniformly
At least 3 days curing after Xypex applied
2
Project Quality Plan for MARC Service Residence Effective: 08 July 2004
Doc.Ref.: PPCSB/75/PQP/STR/FL/3
Putra Perdana Construction Sdn Bhd
Page 1 of 1
Date: Date: Date:
Project Quality Plan for MARC Service Residence Effective: 08 July 2004
Doc.Ref.: PPCSB/75/PQP/STR/FL/4
Putra Perdana Construction Sdn Bhd
Page 1 of 1
Project Quality Plan for MARC Service Residence Effective: 08 July 2004
Doc.Ref.: PPCSB/75/PQP/STR/FL/4
Putra Perdana Construction Sdn Bhd
Page 1 of 1
Project Quality Plan for MARC Service Residence Effective: 08 July 2004
Doc.Ref.: PPCSB/75/PQP/STR/FL/5
Putra Perdana Construction Sdn Bhd
Page 1 of 1
Block :
Level :
Grid Line : .
Casting Date :
Age of Concrete :
Remark:
Important Note: Patching up to concrete surface upon formwork striking is not allowed prior to
inspection.
Signature Signature
Name : Name :
Date: Date:
Project Quality Plan for MARC Service Residence Effective: 08 July 2004
Doc.Ref.: PPCSB/75/PQP/STR/FL/5
Putra Perdana Construction Sdn Bhd
Page 1 of 1
Project Quality Plan for MARC Service Residence Effective: 08 July 2004
Doc.Ref.: PPCSB/75/PQP/STR/FL/6
Putra Perdana Construction Sdn Bhd
Page 1 of 1
Project Quality Plan for MARC Service Residence Effective: 08 July 2004
Doc.Ref.: PPCSB/75/PQP/STR/FL/6
Putra Perdana Construction Sdn Bhd
Page 1 of 1
Date: Date: Date:
Project Quality Plan for MARC Service Residence Effective: 08 July 2004
Doc.Ref.: PPCSB/75/PQP/STR/FL/7
Putra Perdana Construction Sdn Bhd
Page 1 of 1
Nos of
Concrete Formworks
Location Date Cast Qty (m3) Cube Cube Ref. Remarks
Waste (m3) Removal Date
Taken
Project Quality Plan for MARC Service Residence Effective: 08 July 2004
Doc.Ref.: PPCSB/75/PQP/STR/FL/8
Putra Perdana Construction Sdn Bhd
Page 1 of 1
Contruction joint
Drop area
Opening / block out area
Check side fwk support
Sealing against grout loss
7 Inspection of Post tention Checking List (Sign off )
Stiffener
Trimmer bar
Attatch all planting stater bars sign off forms (if any)
18 Curing
Remarks :
Project Quality Plan for MARC Service Residence Effective: 08 July 2004
Putra Perdana Construction Sdn Bhd Doc.Ref.: PPCSB/75/PQP/STR/FL/9
Page 1 of 1
Slab & Beam Inspection Checklist
Project : MARC Service Residence Date of Inspection :
Project Ref. No. : PPCSB/75 Level :
Block : Location/Gridline/Zone :
Drawing Ref. No. : LEGEND : Accept ( / ) , Reject ( X ) , Not applicable ( O )
BEAM GRIDLINE
Beam no:
BEAMS INSPECTION DATE
1st 2nd 1st 2nd 1st 2nd 1st 2nd 1st 2nd 1st 2nd 1st 2nd 1st 2nd 1st 2nd 1st 2nd 1st 2nd 1st 2nd 1st 2nd
SIZE
TOP bars size
No of bars
Length
Anchorage length
spacer bars
Lapping area
length
BOTTOM bars size
No of bars
Length
Anchorage length
spacer bars
Lapping area
length
Links size
no of links
spacing
distance
Spacer bottom
side
Beam Stater bar length over -
Slab Construction joint
PANEL Gridline
SLAB DATE
Panel type
Top layer Bar size
Spacing
Length
Anchorage length ( if any )
Steel Chair
Lapping Area
Length
Bottom Bar size
Spacing
Area
Anchorage length ( if any )
Lapping Area
Length
Spacer
TRIMMER BAR
Project Quality Plan for MARC Service Residence Effective: 08 July 2004
Doc.Ref.: PPCSB/75/PQP/STR/FL/10
Putra Perdana Construction Sdn Bhd
Page 1 of 1
CONCRETING Date :
Method of casting / Trimie pipe
Concrete Mix / workability
No & length of Vibrator poker
Lighting
General Cleaning
Grout for construction joint
Remarks :
Project Quality Plan for MARC Service Residence Effective: 08 July 2004
Doc.Ref.: PPCSB/75/PQP/STR/FL/11
Putra Perdana Construction Sdn Bhd
Page 1 of 1
Column Inspection Checklist
Project : MARC Service Residence Date of Inspection :
Project Ref. No. : PPCSB/75 Level :
Block : Location/Gridline/Zone :
Drawing Ref. No. : LEGEND : Accept ( / ) , Reject ( X ) , Not applicable ( O )
Level : Gridline
Date
COLUMN 1st 2nd Sign off 1st 2nd Sign off 1st 2nd Sign off 1st 2nd Sign off 1st 2nd Sign off 1st 2nd Sign off 1st 2nd Sign off 1st 2nd Sign off
Construction joint surface
Size With
Alignment Attatch
Position Sketch
Planting of Bar's FORM ( sign off ) If any
REINFORCEMENT
No of Stater Bars
No of Main Bars
Lapping Length
Length over casting level
Provide Gap for postension Duct
Links Size
No of links
Spacing
Hight till casting level
Lapping area secure
Spacer
Embedded Item (if any)
Attach sign off M&E checking list
FORMWORK Date :
Size / Alignment
Verticality
Form ties secure properly
Sealing against grout loss
Secure main Bars in position
Proper working plat form
CONCRETING Date :
Method of casting / Trimie pipe
Concrete Mix / workability
No & length of Vibrator poker
Lighting
Grout for construction joint
Project Quality Plan for MARC Service Residence Effective: 08 July 2004
Doc.Ref.: PPCSB/75/PQP/STR/FL/12
Putra Perdana Construction Sdn Bhd
Page 1 of 1
No & Element Location Sign -off by: Grouting / Patching Check By Verified By Approved By
Remarks Level Gridline Hacking Cleaning Aggregate Date Product Used Time Start-Finish Pressure(psi) No of Bags No of Cubes Sub-Con PPCSB RE/COW
Project Quality Plan for MARC Service Residence Effective: 08 July 2004
Doc.Ref.: PPCSB/75/PQP/STR/FL/13
Putra Perdana Construction Sdn Bhd
Page 1 of 1
Project Quality Plan for MARC Service Residence Effective: 08 July 2004
Doc.Ref.: PPCSB/75/PQP/STR/FL/14
Putra Perdana Construction Sdn Bhd
Page 1 of 1
Inspection Record
Project : MARC Service Residence Date of Inspection :
Project Ref. No. : PPCSB/75 Block :
Inspection Form No (RIF No.) : Level :
Drawing Ref. No. : Location/Gridline/Zone :
Element :
Date Date
Item Comments
Time Time
Project Quality Plan for MARC Service Residence Effective: 08 July 2004
Doc.Ref.: PPCSB/75/PQP/STR/FL/15
Putra Perdana Construction Sdn Bhd
Page 1 of 1
Pilecap Checklist
Project : MARCService Residence Inspection Date :
Project Ref. No : PPCSB/75 Pilecap Ref. No. :
Block : Location/Gridline/Zone :
Con. Grade : Concrete Supplier :
Drwg. Ref. No : Concrete Slump :
Theoretical Vol :
Project Quality Plan for MARC Service Residence Effective: 08 July 2004
Doc.Ref.: PPCSB/75/PQP/STR/FL/16
Putra Perdana Construction Sdn Bhd Page 1 of 1
Project Quality Plan for MARC Service Residence Effective: 08 July 2004