CONSTRUCTION CHECK SHEET

INSTALLATION
LCS / CONTROL STATION / Format no:
JUNCTION BOX EVIO/EL/ITP/F-11
Rev : R-0
PROJECT
BUNGE INDIA PVT LTD PROJECT No. AP-5072
DESCRIPTION

AREA KRISHNAPATNAM CONTRACTOR EVIO PVT LTD

REPORT No. DATE.

A: TECHNICAL DETAILS
LOCATION: SYSTEM/DUTY: RATED VOLT:
DWG: HAZARDOUS AREA CLASSIFICATION SAFE/ZONE:

MANUFACTURER: IP: MATERIAL:


CERTIFYING AUTHORITY: CERTIFICATE No:
TAG NO: U NO: WEIGHT(KGs):
B INSPECTION RESULT
1. Inspect for mechanical damage.
2. Inspect and ensure that the installation meets the requirement of the hazardous area.
3. Ensure that weatherproofing meets the requirements.
4. Inspect push button operation, stay-put and locking facilities.
5. Inspect terminal box flange surfaces.
6. Inspect terminal box fixing bolts.
7. Record ammeter scale and current ratio.
8. Record equipment earthing to ring ().
9. Record support structure earthing to ring ().
10. Check braiding connection to internal stud on insulated box
11. Check cable gland suitability for the area (hazardous or safe)
12. Check equipment fixings & mountings are secure
13. Check all connections are tight , correct & have cable markings fitted
14. Check all equipment has the correct circuit identification
15. Check that earthing conforms to project specification.
16. Remove all silica gel & other packing
17. Ensure that unused cable entries are blanked.
C REMARKS/OBSERVATIONS:

COMPLETED BY CONTRACTOR PMC/OWNER


SIGN SIGN
DATE DATE
NAME NAME