Industry & Facilities Division

Third Party Inspection Report Page 1 of 7

INSPECTION REPORT Nr. 6091774-IR-09 Revision Nr


Initial Interim Final Resident
Inspection requested by: : SEOUL ELECTRIC WIRE CO.,LTD
Inspection performed as Recognised Authority: Yes, :(Recognition) No
BV Job Nr:

PROJECT: Ar 09/18 IPO Ref (If applicable):


(BV internal P/o)
BV Client: SEOUL ELECTRIC WIRE CO.,LTD P/o nr:
(client to BV)
Manufacturer/Vendor: SEOUL ELECTRIC WIRE CO.,LTD P/o nr: CY-18-8015-0143
(client to Manufacturer)
Sub-Vendor (If applicable):N/A
Inspection Location: Previous Inspection (If applicable):N/A
27-20,MEONGSIMI-GIL,SAMSEONG-MYEON, EUMSEONG-GUN, (Date)
CHUNGBUK-DO, KOREA
Inspection performed on: 29, January, 2020 Next Inspection (If applicable): N/A
( Date(s) ) (Date)

MATERIAL / SUBJECT OF INSPECTION ITEM / TAG Nr QTY QTY


As per P/O Offered for
Refer to attachment section J instead inspection
(Indicate if separate material list is provided in attachment)
- 0.6/1kV CU/XLPE/PVC/SWA/PVC 33,433M 33,433M
- 0.6/1kV CU/LSOH 396M 396M
- 0.6/1kV CU/XLPE/LSOH 2,111M 2,111M
- 0.6/1kV CU/XLPE/PVC 3,150M 3,150M

A – INSPECTION RESULT

Satisfactory Satisfactory with comments Not Satisfactory


(Without comments) (Any of trailing Punch or Non Conformity (NCR raised during the
items is still open) inspection)

Inspection Summary: (for details refer to section E)

This is to report the FAT (Factory Acceptance Test) performed for as above items at Seoul Electric Cable
Co., Ltd Eumseong-Gun, Chungbuk-Do, Korea on 29th January, 2020 (1 day) in accordance with ITP
(Approved Inspection Test Plan ) with the satisfactory result

Open Non Conformities: Yes, details in section G No


Open Punch List Items: Yes, details in section H No
Release Note Issued: Yes, number(s): 6091774-RN-09 No
BV Stamping: Yes, Yes, No

GM-SI-101 INSP002-En Version 5.0 Copyright Bureau Veritas 05/2017

This template is intended exclusively when BV is acting as 3° party inspection body. The use of present template is
forbidden in the frame of 2° party services where Client specification and templates must be used.
Industry & Facilities Division
Third Party Inspection Report
Page 2 of 7

INSPECTION REPORT Nr. 6091774-IR-09 Revision Nr 1

On behalf of Bureau Veritas On behalf of Bureau Veritas

BV Inspector: Sang Wook, Cho


(Name and Signature) BV Coordinator: Ji Sol, Kim
(Name and Signature)
BV Office: BV KOREA Inspection Report Date: 29, January, 2020

Distribution: Attachments Report:


CLIENT BV MANUFACTURER Yes, details in section J No
OTHER: …………………………..

B - REFERENCE DOCUMENTATION:
Refer to attachment section J instead
(Indicate if separate document list is provided in attachment)
Approval
Title Reference n° Rev. Approved by Date
status
0.6/1kV CU/LSOH SEE-2204-3718TD 0 FINAL N.I.JEON 24. Feb. 2016.
0.6/1kV CU/XLPE/PVC SEE-5201-3718TD 5 FINAL N.I.JEON 03. Aug. 2016.
0.6/1kV CU/XLPE/PVC/SWA/PVC SEE-5219-EP18-1 1 FINAL N.I.JEON 02. Jan. 2020.
0.6/1kV CU/XLPE/LSZH SEE-5401-3718TD 0 FINAL N.I.JEON 20. May. 2016.
INSPECTION & TEST PLAN SEE-ITP-EP01 0 FINAL Y.C.SONG 21. Jan. 2020.

C – ATTENDEES

Name Position Representing


Mr. Bogeun-Jeong Q.A Manager SEOUL ELECTRIC WIRE CO.,LTD
Mr. Sang-Wook,Cho Senior Inspector BV KOREA

D - MEASURING & TESTING EQUIPMENT USED


Refer to attachment section J instead
(Indicate if separate equipment list is provided in attachment)
Equipment Type Equipment Identity n° Last Calibration Date Expiry Date
Digital Vernier Calipers 0040020 15,May,2019 15,May,2020
Outside micrometer 67308223 13,May,2019 13,May,2020
Projector (PJ-A3000) C00151204 21,Aug,2018 21,Aug,2020
Puncture tester 4050801 11,Jan,2020 11,Jan,2021
Conductor resistance tester 281-125 11,Jan,2020 11,Jan,2021
Hot set tester 핫셋시험기 15,May,2019 15,May,2020

E - INSPECTION DETAILS

GM-SI-101 INSP002-En Version 5.0 Copyright Bureau Veritas 05/2017

This template is intended exclusively when BV is The use of present template is forbidden in the
acting as 3° party inspection body. frame of 2° party services where Client
specification and templates must be used.
Industry & Facilities Division
Third Party Inspection Report
Page 3 of 7

INSPECTION REPORT Nr. 6091774-IR-09 Revision Nr 1

Description of the inspections carried out:

The Following Inspection activities was performed on the below test clause in accordance with
approved specification Inspection test procedure and the result of inspection were found to be satisfactory.

Witnessed R : Reviewed
Test Clause Standard Instrument Result
A) Construction Test SEE-ITP-EP01 In/side / Outside Caliper, W
Outside micrometer,
Projetor (PJ-A3000)
B) Conductor Resistance SEE-ITP-EP01 Conductor resistance tester W
Test
C) A.C Withstand Voltage SEE-ITP-EP01 Puncture Tester W
Test 0.6/1kV - 3.5 kV / 5 Min
D) Visual Inspection SEE-ITP-EP01 Megger Tester W
E) Hot set Test SEE-ITP-EP01 Hot Set Tester W

A. Construction Test: Witnessed


Verified that conductor status, insulation materials & thickness, core identification with color, number
of core, inner covering materials & thickness, number of metallic armour, and over sheath of Low
smke zero halogen (ST8) & ST2 were satisfactory. Conductor examination was performed as below items.
(Refer to vender test report for detail), Conductor, Insulation, Core identification, inner covering, metallic
amour, Oversheath, cable marking, Physical Test reports were reviewed.

B. Conductor Resistance Test: Witnessed


Conductor resistances were measured and verified that the values were found to be within acceptance
criteria. Conductor Resistance of sample cable drums were measured with megger tester. Maximum
Conductor Resistance values were not more than required values as below.

Test Equipment
Description Resistance Meter
Manufacturer/ Model Raytech / MicroJunior2
Serial Number 281-125
Expire Date 11. Jan. 2021.

C. AC Withstand Voltage Test : Witnessed


The tests were performed for sampled cable drums in accordance with IEC Standard and were found
no abnormal condition and withstood. The results were found to be satisfactory.
AC High voltage test for 5 minutes (A.C) were conducted with sample drums as below testing voltage.

Voltage Grade Test Voltage Duration Result

GM-SI-101 INSP002-En Version 5.0 Copyright Bureau Veritas 05/2017

This template is intended exclusively when BV is The use of present template is forbidden in the
acting as 3° party inspection body. frame of 2° party services where Client
specification and templates must be used.
Industry & Facilities Division
Third Party Inspection Report
Page 4 of 7

INSPECTION REPORT Nr. 6091774-IR-09 Revision Nr 1

0.6/1kV 3.5 kV 5 minute Satisfactory


- Test Equipment
Description PUCTURE TESTER / RANGE
Manufacturer/ Model SMEM / SM-6PT
Serial Number 04050801
Expire Date 11. Jan. 2021.

D. Hot set Test: Witnessed


Hot set test was carried out as follows for insulation in accordance with the approved procedure
- Standard; Elogation
– Hot: Max 175%, Actual: 80~85%
– Set: Max 15%, Actual: 0~2%

Test Equipment
Description Temperature indicator controller
Manufacturer/ Model HANUOUNG / KX7N
Serial Number Hot Set tester
Expire Date 15. May. 2020.

The result of the test was found to be satisfactory

F. The results of inspection


The result of inspection for the cables was found to be satisfactory in compliance with the above
mentioned reference documents.

F – HEALTH, SAFETY & ENVIRONMENT COMMENTS

(Comment on Observations and Actions Taken During the Inspection)

There were no HSE issues during the visit.


All personnel on site were to be correctly wearing the appropriate personnel protective equipment and working
in a safe manner. The site was clean and tidy and free of any form of trip/fall hazard.

G- NON CONFORMITIES
Refer to attachment section J instead
(Indicate if separate punch list is provided in attachment)
Report Report
Item Description Status Raised on Closed on Comments
Nr. Nr.
(Open)
(DD-MM-YY) (DD-MM-YY)
(Closed)

GM-SI-101 INSP002-En Version 5.0 Copyright Bureau Veritas 05/2017

This template is intended exclusively when BV is The use of present template is forbidden in the
acting as 3° party inspection body. frame of 2° party services where Client
specification and templates must be used.
Industry & Facilities Division
Third Party Inspection Report
Page 5 of 7

INSPECTION REPORT Nr. 6091774-IR-09 Revision Nr 1

(Add lines for additional


records)
- N/A

H – PUNCH LIST ITEMS


Refer to attachment section J instead
(Indicate if separate punch list is provided in attachment)
Report Report
Item Description Status Raised on Closed on Comments
Nr. Nr.
(Open)
(Closed) (DD-MM-YY) (DD-MM-YY)
(Quality
Save)
(Add lines for additional
records)
-N/A

I - DIGITAL PICTURES

Construction Inspection Construction Inspection Construction Inspection

Construction Inspection Construction Inspection Construction Inspection

GM-SI-101 INSP002-En Version 5.0 Copyright Bureau Veritas 05/2017

This template is intended exclusively when BV is The use of present template is forbidden in the
acting as 3° party inspection body. frame of 2° party services where Client
specification and templates must be used.
Industry & Facilities Division
Third Party Inspection Report
Page 6 of 7

INSPECTION REPORT Nr. 6091774-IR-09 Revision Nr 1

Construction Inspection High Voltage Withstand Inspection High Voltage Withstand Inspection

High Voltage Withstand Inspection Conductor Resistance Test Conductor Resistance Test

Hot Set Test Hot Set Test Hot Set Test

J – ATTACHMENTS

Item Attachment Name Total Pages Description


1 Manufacture Test report 44 Pages

GM-SI-101 INSP002-En Version 5.0 Copyright Bureau Veritas 05/2017

This template is intended exclusively when BV is The use of present template is forbidden in the
acting as 3° party inspection body. frame of 2° party services where Client
specification and templates must be used.
Industry & Facilities Division
Third Party Inspection Report
Page 7 of 7

INSPECTION REPORT Nr. 6091774-IR-09 Revision Nr 1

END OF REPORT

GM-SI-101 INSP002-En Version 5.0 Copyright Bureau Veritas 05/2017

This template is intended exclusively when BV is The use of present template is forbidden in the
acting as 3° party inspection body. frame of 2° party services where Client
specification and templates must be used.