Professional Documents
Culture Documents
Procurement Services
Third Party Inspection Report Page 1 of 6
Type of Inspection : Initial Interim Final Resident
Inspection Requested by: LARSEN & TOUBRO LIMITED
Inspection performed as Recognised Authority: Yes, THIRD PARTY INSPECTION AGENCY No
BV Job Nr : 6110824-1001
Project: NEW STRATEGIC GAS EXPORT PIPELINE FROM NORTH
BV Job Nr (local ref.) 40.19.TPI.032.003
KUWAIT TO MAA (PROJECT NO. EF-1943)
Sub-Vendor: HEAVY ENGINEERING INDUSTRIES & SHIPBUILDING
P/O Nr (Client to Manufacturer): NA
CO. K.S.C (PUBLIC)
Inspection performed until (MM/DD/YYYY) 12/23/2020 Total number of days inspection performed 1
MATERIAL / SUBJECT OF INSPECTION
Description Item / Tag Nr Quantity As per P/O Quantity Offered for Inspection
40" TEST HEADER M-SK-003-2-1L 1 1
40" TEST HEADER M-SK-003-2-2R 1 1
A - INSPECTION RESULT
Satisfactory with comments (Any new or trailing Punch or Non Not Satisfactory (NCR raised during the
Satisfactory (Without comments)
Conformity items open) inspection)
Inspection Summary:
As requested by M/s Larsen & Toubro Limited, hydrotest for 40" TEST HEADER - Launcher (M-SK-003-2-1L) & Receiver (M-SK-003-2-2R) was witnessed on the 23rd
December 2020 at Sub-Vendor facility in Shuaiba. Prehydrotest pack was reviewed prior to the test. Details of inspection and tests are given in the continuation sheets.
BV Traceability Stamping No
INSP PROC 002-En Version 3.0 Copyright Bureau Veritas 10/2019
This inspection report is relevant to inspection services performed by Bureau Veritas for and on behalf of the Client
Report Identifier 5-2020-XXXXXX-EN
Industry & Facilities Division
Procurement Services
Third Party Inspection Report Page 2 of 6
On behalf of Bureau Veritas
BV Inspector: BRIJITH PETER
On behalf of Bureau Veritas
BV Coordinator:
B - REFERENCE DOCUMENTATION
Date
Title Reference Nr Revision Approval Status Approved by
(MM/DD/YYYY)
C - ATTENDEES
D - MEASURING & TESTING EQUIPMENT USED
E - INSPECTION DETAILS
INSP PROC 002-En Version 3.0 Copyright Bureau Veritas 10/2019
This inspection report is relevant to inspection services performed by Bureau Veritas for and on behalf of the Client
Report Identifier 5-2020-XXXXXX-EN
Industry & Facilities Division
Procurement Services
Third Party Inspection Report Page 3 of 6
E1 – Details of Witness (W) & Hold (H) Inspection Points
1. Hydrotest for 40" TEST HEADER - Launcher (M-SK-003-2-1L) & Receiver (M-SK-003-2-2R) was witnessed at HEISCO Workshop in Shuaiba on
the 23rd of December 2020.
2. Details of Hydrotest package reviewed are given in section E3.
3. Pressurization started at 10:30 AM and achieved 157 Barg by 12:00 PM. holding period of 4 hours was completed by 04:00 PM.
4. Visually inspected the test header, welded joints and flanged connections - no signs of leakage observed.
5. Pressure variation monitored every half hour on the pressure gauges & chart recorder – no variation in pressure noted.
6. Temperature & pressure variation observed during the test are recorded.
7. Details of the test are given in the below table.
Test pressure: 156.5 Barg
Testing duration: 4 hour
Pressurisation started at: 10:30 AM
Holding period started at: 12:00 PM
Holding period ended at: 04:00 PM
Variation in temperature: -1 Degree Celcius
Initial measured pressure: 157 Barg
Final measured pressure: 157 Barg
E2 – Details of Monitoring and Surveillance Patrols
Not conducted during visit
E3 – Details of Certificates Review
The following certificates and reports included in Shop Hydrotest Package for 40" TEST HEADER - Launcher (M-SK-003-2-1L) & Receiver (M-
SK-003-2-2R) reviewed.
1. Welding inspection & NDE reports.
2. Calibration certificates for pressure gauges, PSV, pressure chart recorder & temperature chart recorder.
3. Chemical analysis of test fluid.
4. Certificates for manifold, test blinds & hoses.
INSP PROC 002-En Version 3.0 Copyright Bureau Veritas 10/2019
This inspection report is relevant to inspection services performed by Bureau Veritas for and on behalf of the Client
Report Identifier 5-2020-XXXXXX-EN
Industry & Facilities Division
Procurement Services
Third Party Inspection Report Page 4 of 6
F - HEALTH, SAFETY & ENVIRONMENT COMMENTS
NIL
2 minutes for my safety
Hazards
In my work environment, is all necessary equipment (vehicle, conveyors, etc.) isolated? Yes
Is the walking surface free of slip, trip and fall hazards? Yes
Have I communicated with the other groups about their activities? NA
Personal Health
If the task involves heavy lifting, am I equipped to manage this factor? NA
Conditions
If extreme weather conditions are a factor on this job, are there measures in place to manage it? NA
G - NON CONFORMITIES
INSP PROC 002-En Version 3.0 Copyright Bureau Veritas 10/2019
This inspection report is relevant to inspection services performed by Bureau Veritas for and on behalf of the Client
Report Identifier 5-2020-XXXXXX-EN
Industry & Facilities Division
Procurement Services
Third Party Inspection Report Page 5 of 6
Raised On Closed On
Item Category Description Status Report # Report # Comments
(MM/DD/YYYY) (MM/DD/YYYY)
NIL
H - PUNCH LIST
NIL
I - DIGITAL PICTURES
J - ATTACHMENTS
NIL
INSP PROC 002-En Version 3.0 Copyright Bureau Veritas 10/2019
This inspection report is relevant to inspection services performed by Bureau Veritas for and on behalf of the Client
Report Identifier 5-2020-XXXXXX-EN
Industry & Facilities Division
Procurement Services
Third Party Inspection Report Page 6 of 6
END OF REPORT
INSP PROC 002-En Version 3.0 Copyright Bureau Veritas 10/2019
This inspection report is relevant to inspection services performed by Bureau Veritas for and on behalf of the Client
Report Identifier 5-2020-XXXXXX-EN