You are on page 1of 6

Industry & Facilities Division  

Procurement Services  
Third Party Inspection Report Page 1 of 6
 
  Type of Inspection :   Initial            Interim            Final            Resident
  Inspection Requested by: LARSEN & TOUBRO LIMITED 
  Inspection performed as Recognised Authority:    Yes, THIRD PARTY INSPECTION AGENCY     No 
  BV Job Nr : 6110824-1001 

Inspection Report Nr:    SIR-05  Revision Nr:    0 

Project:    NEW STRATEGIC GAS EXPORT PIPELINE FROM NORTH
BV Job Nr (local ref.)    40.19.TPI.032.003 
KUWAIT TO MAA (PROJECT NO. EF-1943) 

IPO Ref (BV internal P/o):    NA  BV Client:    LARSEN & TOUBRO LIMITED 

P/O Nr (Client to BV):    NA  Manufacturer / Vendor:    LARSEN & TOUBRO LIMITED 

Sub-Vendor:    HEAVY ENGINEERING INDUSTRIES & SHIPBUILDING
P/O Nr (Client to Manufacturer):    NA 
CO. K.S.C (PUBLIC) 

Inspection Location:    HEISCO WORKSHOP, SHUAIBA  Inspection Performed on: (MM/DD/YYYY)    12/23/2020 

Inspection performed until (MM/DD/YYYY)    12/23/2020  Total number of days inspection performed    1 

MATERIAL / SUBJECT OF INSPECTION

Description Item / Tag Nr Quantity As per P/O Quantity Offered for Inspection

40" TEST HEADER M-SK-003-2-1L 1 1

40" TEST HEADER M-SK-003-2-2R 1 1

A - INSPECTION RESULT

 
 
 

Satisfactory with comments (Any new or trailing Punch or Non     Not Satisfactory (NCR raised during the
Satisfactory (Without comments)
Conformity items open) inspection)

 
 
Inspection Summary:
  As requested by M/s Larsen & Toubro Limited, hydrotest for 40" TEST HEADER - Launcher (M-SK-003-2-1L) & Receiver (M-SK-003-2-2R) was witnessed on the 23rd
December 2020 at Sub-Vendor facility in Shuaiba. Prehydrotest pack was reviewed prior to the test. Details of inspection and tests are given in the continuation sheets. 

  Open Non Conformities:   Yes, details in section G  No  

  Open Punch List Items:   Yes, details in section H  No  

  Release Note Issued:   Yes  No Release Note number(s): 

  BV Traceability Stamping      No  
   

INSP PROC 002-En Version 3.0                                                                                                                    Copyright Bureau Veritas 10/2019
               This inspection report is relevant to inspection services performed by Bureau Veritas for and on behalf of the Client
Report Identifier 5-2020-XXXXXX-EN
Industry & Facilities Division  
Procurement Services  
Third Party Inspection Report Page 2 of 6
 
   On behalf of Bureau Veritas
BV Inspector: BRIJITH PETER
     

   On behalf of Bureau Veritas
BV Coordinator:
      

BV Office: KUWAIT  Inspection Report Date (MM/DD/YYYY): 12/24/2020 


Distribution: 
    to BV:    Attachments Report: 
    to Client:          Yes, details in section J                 No attachment
    to Other:   
 

B - REFERENCE DOCUMENTATION

Date
Title Reference Nr Revision Approval Status Approved by
(MM/DD/YYYY)

Shop Hydrotest Package 0 Approved as final L&T 12/23/2020

C - ATTENDEES

Name Position Representing Email Phone

Prajith Kumar QA/QC Inspector HEISCO prajith.pradeep@heisco.com 98925545

Nagarajan R QA/QC Engineer Larsen & Toubro rk.nagarajan@larsentoubro.com 69952553

Brijith Peter TPI Bureau Veritas brijith.peter@bureauveritas.com 97231146

D - MEASURING & TESTING EQUIPMENT USED

Last Calibration Date


Equipment Used Equipment Identity Nr Expiry Date (MM/DD/YYYY)
(MM/DD/YYYY)

Pressure Gauge I20976/1031-411-271 12/10/2020 06/09/2021

Pressure Gauge I2495/1031-410-021 12/10/2020 06/09/2021

Pressure Chart Recorder I9343/1031-420-021 08/19/2020 02/18/2021

Temperature Chart Recorder I3175/1031-420-004 09/13/2020 03/12/2021

E - INSPECTION DETAILS

Description of the Inspections carried out

INSP PROC 002-En Version 3.0                                                                                                                    Copyright Bureau Veritas 10/2019
               This inspection report is relevant to inspection services performed by Bureau Veritas for and on behalf of the Client
Report Identifier 5-2020-XXXXXX-EN
Industry & Facilities Division  
Procurement Services  
Third Party Inspection Report Page 3 of 6
 

E1 – Details of Witness (W) & Hold (H) Inspection Points

1. Hydrotest for 40" TEST HEADER - Launcher (M-SK-003-2-1L) & Receiver (M-SK-003-2-2R) was witnessed at HEISCO Workshop in Shuaiba on
the 23rd of December 2020.

2. Details of Hydrotest package reviewed are given in section E3.

3. Pressurization started at 10:30 AM and achieved 157 Barg by 12:00 PM. holding period of 4 hours was completed by 04:00 PM.

4. Visually inspected the test header, welded joints and flanged connections - no signs of leakage observed.

5. Pressure variation monitored every half hour on the pressure gauges & chart recorder – no variation in pressure noted.

6. Temperature & pressure variation observed during the test are recorded.

7. Details of the test are given in the below table. 

Test pressure: 156.5 Barg

Testing duration: 4 hour

Pressurisation started at: 10:30 AM

Holding period started at: 12:00 PM

Holding period ended at: 04:00 PM

Variation in temperature: -1 Degree Celcius

Initial measured pressure: 157 Barg

Final measured pressure: 157 Barg

E2 – Details of Monitoring and Surveillance Patrols

Not conducted during visit 

E3 – Details of Certificates Review

The following certificates and reports included in Shop Hydrotest Package for 40" TEST HEADER - Launcher (M-SK-003-2-1L) & Receiver (M-
SK-003-2-2R) reviewed.
1. Welding inspection & NDE reports.
2. Calibration certificates for pressure gauges, PSV, pressure chart recorder & temperature chart recorder.
3. Chemical analysis of test fluid.
4. Certificates for manifold, test blinds & hoses. 

INSP PROC 002-En Version 3.0                                                                                                                    Copyright Bureau Veritas 10/2019
               This inspection report is relevant to inspection services performed by Bureau Veritas for and on behalf of the Client
Report Identifier 5-2020-XXXXXX-EN
Industry & Facilities Division  
Procurement Services  
Third Party Inspection Report Page 4 of 6
 

F - HEALTH, SAFETY & ENVIRONMENT COMMENTS

NIL 

2 minutes for my safety

Hazards

Is the equipment / energy isolated?    Yes

If a permit is required, eg. confined space entry, do I have it?    NA

Are tools and equipment in good condition and tagged?    Yes

In my work environment, is all necessary equipment (vehicle, conveyors, etc.) isolated?    Yes

Is the walking surface free of slip, trip and fall hazards?    Yes

Is the appropriate barricading for the task in place?    Yes

If someone works above me, am I protected from a falling object?    NA

Have I communicated with the other groups about their activities?    NA

Personal Health

Am I fit for this task?    Yes

If the task involves heavy lifting, am I equipped to manage this factor?    NA

Conditions

If extreme weather conditions are a factor on this job, are there measures in place to manage it?    NA

Am I familiar with the equipment I inspect?    Yes

G - NON CONFORMITIES

INSP PROC 002-En Version 3.0                                                                                                                    Copyright Bureau Veritas 10/2019
               This inspection report is relevant to inspection services performed by Bureau Veritas for and on behalf of the Client
Report Identifier 5-2020-XXXXXX-EN
Industry & Facilities Division  
Procurement Services  
Third Party Inspection Report Page 5 of 6
 

Raised On Closed On
Item Category Description Status Report # Report # Comments
(MM/DD/YYYY) (MM/DD/YYYY)

NIL

H - PUNCH LIST

Punc Raised On Closed On


h list Item Category Description Status (MM/DD/YYY Report # (MM/DD/YYY Report # Comments
# Y) Y)

NIL

I - DIGITAL PICTURES

Photo 001 Photo 002 Photo 003

Photo 004 Photo 005 Photo 006

J - ATTACHMENTS

Item Description / Attachment name Attachment Total Pages

NIL

INSP PROC 002-En Version 3.0                                                                                                                    Copyright Bureau Veritas 10/2019
               This inspection report is relevant to inspection services performed by Bureau Veritas for and on behalf of the Client
Report Identifier 5-2020-XXXXXX-EN
Industry & Facilities Division  
Procurement Services  
Third Party Inspection Report Page 6 of 6
 
 
 
END OF REPORT

 
 

INSP PROC 002-En Version 3.0                                                                                                                    Copyright Bureau Veritas 10/2019
               This inspection report is relevant to inspection services performed by Bureau Veritas for and on behalf of the Client
Report Identifier 5-2020-XXXXXX-EN

You might also like