MATERIAL INSPECTION REPORT

PROJECT NAME OWNER DATE : 2 November 2019

GO3 TO VDU Bangchak corporation company limited PAGE NO. : 1 of 2

ITEM / PART NAME CONTRACTOR REPORT NO.

PILIN PROJECT.CO.,LTD PL-6219-1-MIR-01

DRAWING NO. JOB No. LOCATION

6219-01 SHOP PILIN

Description / Dimension Material


Qty. Product No. / Heat No. Mill Cer. No. Remark
No. (mm.) Specification

1 pipe 3" sch 40 80 A106-B M39059 31709

2 ELBOW 90° -3" 30 234-WPB 881M69 T18-83714/1

3 H 300 ×150×6.5/9×6.00M 5 SS400 KB4213 42519100618

4 L 40×40×5mm 10 SS400 TPS010919113 TPS 1911-021

PREVIEWED BY REVIEWED / APPROVED REVIEWED / WITNESS

SIGNATURE DATE : 2 November 2019 SIGNATURE DATE : 2 November 2019 SIGNATURE DATE :

PILIN (QC.TECHNICHIAL) PILIN (QC.ENGINEER) BCP


MATERIAL INSPECTION REPORT

PROJECT NAME OWNER DATE : 2 November 2019

GO3 TO VDU Bangchak corporation company limited PAGE NO. : 2 of 2

ITEM / PART NAME CONTRACTOR REPORT NO.

PILIN PROJECT.CO.,LTD PL-6219-1-MIR-01

DRAWING NO. JOB No. LOCATION

6219-01 SHOP PILIN