MATERIAL INSPECTION REPORT

PROJECT NAME : SENDING ULN3 TO LPGU3 JOB No. : PL-6204-24 PAGE 1 OF 3


OWNER : BANGCHAK PETROLEUM PUBLIC CO.,LTD DATE 19/2/2021 AREA : SHOP POLIN
CONTRACTOR : PILIN PROJECT CO.,LTD. DRAWING No : N/A REV. 0
Item Material Inspection
Description Dimension (mm) Sch. / Thickness (mm) Qty. Remarks
No. Specification Heat No. Mill Cert No. Visual Check
1 Flange SW/RF 3/4" 150 lb A105 200199 21905137.06 Acc. 1
2 Flange SO/RF 4" 150 lb A105 37832 108907 Acc. 2
3 90 Elbow SMLS 3" SCH40 A234-WPB 62H00M136 T-2013910477 Acc. 4
4 90 Elbow SMLS 3" SCH40 A234-WPB 63G00M211 T-2019940063 Acc. 1
5 90 Elbow SMLS 4" SCH40 A234-WPB 61M00M169 T-2014910213 Acc. 2
6 Tee Red SMLS 4"x2" SCH40 A234-WPB 63P10M088 T-2021910006 Acc. 1
7 Boss SW 1" 3000 lb A105 ACZD TC-025435-20-0001 Acc. 2
8 CAP/NPT 1" 3000 lb A105 594M 23/91/S Acc. 1
9 Gate Valve SW 1" 800 lb A105 AACV/AACX 19/06702 Acc. 1
10 Gate Valve 4" 150 lb A216-WCB BNJ39M27/BNK34J26 27331 Acc. 1
11 Pipe SMLS 4" SCH40/6.02 A106-B M41614 45219(76-3013) Acc. 1
12 Flange SW/RF 2" 150 lb A105 16/70973 2018-C MFF-0762 Acc. 1

COMPLETED BY PREPARED BY REVIEWED BY ACCEPTED BY


COMPANY PILIN PROJECT CO.,LTD. PILIN PROJECT CO.,LTD. BCP
SIGNATURE
NAME Mr.Apidet T. Mr.Ramin Y.
DATE 19/2/2021 19/2/2021

TK-QA-002
MATERIAL INSPECTION REPORT
PROJECT NAME : SENDING ULN3 TO LPGU3 JOB No. : PL-6204-24 PAGE 2 OF 3
OWNER : BANGCHAK PETROLEUM PUBLIC CO.,LTD DATE 19/2/2021 AREA : SHOP POLIN
CONTRACTOR : PILIN PROJECT CO.,LTD. DRAWING No : N/A REV. 0

ITEM NO. 1 ITEM NO. 2 ITEM NO. 3

ITEM NO. 4 ITEM NO. 5 ITEM NO. 6

ITEM NO. 7 ITEM NO. 8

ITEM NO. 9

COMPLETED BY PREPARED BY REVIEWED BY ACCEPTED BY


COMPANY PILIN PROJECT CO.,LTD. PILIN PROJECT CO.,LTD. BCP
SIGNATURE
NAME Mr.Apidet T. Mr.Ramin Y.
DATE 19/2/2021 19/2/2021

TK-QA-002
MATERIAL INSPECTION REPORT
PROJECT NAME : SENDING ULN3 TO LPGU3 JOB No. : PL-6204-24 PAGE 3 OF 3
OWNER : BANGCHAK PETROLEUM PUBLIC CO.,LTD DATE 19/2/2021 AREA : SHOP POLIN
CONTRACTOR : PILIN PROJECT CO.,LTD. DRAWING No : N/A REV. 0

ITEM NO. 10

ITEM NO. 11 ITEM NO. 12

COMPLETED BY PREPARED BY REVIEWED BY ACCEPTED BY


COMPANY PILIN PROJECT CO.,LTD. PILIN PROJECT CO.,LTD. BCP
SIGNATURE
NAME Mr.Apidet T. Mr.Ramin Y.
DATE 19/2/2021 19/2/2021

TK-QA-002