ACCEPTANCE CERTIFICATE

OWNER : THE BANGCHAK PETROLEUM PUBLIC CO.,LTD. JOB No. : PL-5907

PROJECT NAME : NEW DEAERATOR DRUM REPORT No. : PLP-ACT-001


ITEM No. : V-3602 DEAERATOR DATE : 01/09/2016

DRAWING No. : D-V3602-001

TANK / VESSEL / HEATEXCHANGER / STORAGE

CHECK LIST ITEM


YES N/A NO

1 Visual check for damage performed. ✘

2 Specified torque of bolt joint checked. ✘

3 Equipment cleaned. ✘

4 Internal cleaning completed. ✘

5 Internal part installed. ✘

6 Lining / Interior coating checked. ✘

7 Box-up signed by BCP : Date : ✘

REMARK :

COMPLETED BY PREVIEWED BY REVIEWED / APPROVED REVIEWED / WITNESS

COMPANY PLP (QC) PLP (QC ENGINEERING) BCP (INSPECTOR)


SIGNATURE DATE
NAME Mr.Piya W. Mr.Ramin Y. Mr.Kecha N.
DATE