You are on page 1of 6

Report No.

:
ALIGNMENT INSPECTION REPORT
(VERTICAL EQUIPMENT) Page : of

Project Name : Job No. :

Area / Unit : Date :

Equipment No. :: Subcon. Name :

0 OD (mm) :
Height (mm) :

270 90

180

+ 0 - + 0 -

Plumbing (Tolerance : 1mm/1M of Height) (Unit : mm)

Orientation Top Bottom Deviation Result Remark

Inspected /
Prepared By Approved By Witnessed By
. Sign / Date Sign / Date Owner Sign / Date

Form No. : PL-6507-EQA-01


Report No. :
ALIGNMENT INSPECTION REPORT
(HORIZONTAL EQUIPMENT) Page : of

Project Name : Job No. :

Area / Unit : Date :

Equipment No. :: Subcon. Name :

A B

C D

A B C D A B
C D

Elevation (Tolerance : 1mm/1M of Length)

Point Design Measurement Deviation Result Remarks

Inspected /
Prepared By Approved By Witnessed By
Sign / Date Sign / Date Owner Sign / Date

Form No. : PL-6507-EQA-02


Report No. :
LEVELING INSPECTION REPORT -
PUMP & COMPRESSOR (A) Page : of

Project Name : Job No. :

Area / Unit : Date :

Equipment No. :: Subcon. Name :

Pump or
270 90
Comp. Driver

180

Base Level : Before Grouting Scale : 1/100 mm


Measuring location Tolerance Actual Result Remarks

Inspected /
Prepared By Approved By Witnessed By
. Sign / Date Sign / Date Owner Sign / Date

Form No. : PL-6507-EQA-03


Report No. :
LEVELING INSPECTION REPORT -
PUMP & COMPRESSOR (B) Page : of

Project Name : Job No. :

Area / Unit : Date :

Equipment No. :: Subcon. Name :

Pump or
Comp.

270 90

Driver

180

Base Level : Before Grouting Scale : 1/100 mm


Measuring location Tolerance Actual Result Remarks

Inspected /
Prepared By Approved By Witnessed By
. Sign / Date Sign / Date Owner Sign / Date

Form No. : PL-6507-EQA-04


COUPLING ALIGNMENT Report No. :
INSPECTION REPORT - PUMP &
Page : of
COMPRESSOR (A)
Project Name : Job No. :

Area / Unit : Date :

Equipment No. :: Subcon. Name :

After Grouting After Piping After Flushing

A 0

Pump or
270 90
Comp. Driver

A
180
A-A

Alignment : Comp' / Pump - Driver Scale : 1/100 mm


Check Location
Measuring classification Tolerance Result Remarks
0 90 180 270
Parallel

Coupling Gap

Inspected /
Prepared By Approved By Witnessed By
Sign / Date P Sign / Date Owner Sign / Date

Form No. : PL-6507-EQA-05


COUPLING ALIGNMENT Report No. :
INSPECTION REPORT - PUMP &
Page : of
COMPRESSOR (B)
Project Name : Job No. :

Area / Unit : Date :

Equipment No. :: Subcon. Name :

After Grouting After Piping After Flushing

Pump or
A
Comp.

270 90

A
Driver

180
A-A
A

Alignment : Comp' / Pump - Gear Box Scale : 1/100 mm


Check Location
Measuring classification Tolerance Result Remarks
0 90 180 270
Parallel

Coupling Gap

Alignment : Gear Box - Driver Scale : 1/100 mm


Check Location
Measuring classification Tolerance Result Remarks
0 90 180 270
Parallel

Coupling Gap

Inspected /
Prepared By Approved By Witnessed By
Sign / Date Sign / Date Owner Sign / Date

Form No. : PL-6507-EQA-06