TUV INDIA PRIVATE LIMITED

INSPECTION RELEASE NOTE / CERTIFICATE


Number: 8116864113/100 – IRN – 20.09.2018 – Niraj Vyas – Revision 0

TUV SAP & 8116864113/100 & Date: 20.09.2018


Control Number: TUV/19-085

Project Name & M – UTKAL-BG-II & TUVIPL Branch Vadodarai


Location M – UTKAL-GSC –II, M – UTKAL- Name:
MWP –II

TUVIPL Client Name: FL-SMIDTH Pvt. Ltd. End User Name: UTKAL ALUMINA INTERNATIONAL
LTD.

DEC / PMC / EPC Not Applicable DEC / PMC / EPC Not Applicable
Name: (If Applicable) Asgmt. Number:

Vendor Name & Voltamp Transformer Ltd - P.O. Number: 5440019273, 5440019627 &
Location: Garadhiya, Ta:Savli, Vadodara (Client on Vendor) 5440019309

Sub Vendor Name & Not Applicable P.O. Number: Not Applicable
Location: (If applicable) (Vendor on Sub Vendor)

Item Description:

Cumulative
PO P.O. Offered Accepted
Item Code & accepted
Item Quantity Quantity Quantity
Item Description Quantity
No.
Unit: Nos
825 KVA/412.5-412.5,6.6KV/0.720-0.720 Kv Converter
01 Cast resin Dry type Transformer Dy11do ( Sr no : 03 03 03 03
64224/01-02- 03
100 KVA 0.415kv-0.380 kv , Dyn11 Cast resin Dry type
02 06 06 06 06
Transformer ( Sr no : 64225-1 -2 , 64226-1-2 , 64244-1-2

Reference Documents:

Sr. Document Name Document Number Approval Status


No.
1) PR / MR / ARM
2) QAP / ITP / QCP JNC64224/R:02, JN64225:R:02, JN64226:R:02, JN64244:R02 Approved by FL-SMIDTH
3) Drawing(s) GA:64244 , FTL-ELT-240-DZ-0014-001/R:01 Approved by FL-SMIDTH

4) Datasheet(s) JN64224/ :R:01 Approved by FL-SMIDTH


5) Procedure(s) Not Applicable Not Applicable
6) Others (Specify) Not Applicable Not Applicable

Stages Witnessed:

1) All Inspection activity are jointly carried out for All Transformer units.
2) Measurement of Winding Resistance on HV & LV Tap and found as per data sheet
3) 100% Transformer quantity selected for Dimensional, BOM Checks, Paint thickness and Paint shade verification done and
found and recorded on observation sheet.
4) Voltage Ratio & Vector Checks & Polarity checks found in order.
5) Measurement of % Impedance & Load loss at Principal tap found as per data sheet
6) Measurement of no load current and loss rated voltage & Frequency and measurement of magnetizing current.
7) Induced over Voltage test withstood.
8) Separate source withstand test
9) Insulation resistance before & after HV Test & PI Test found in order.

Disclaimer: The inspection by TUV India Pvt. Ltd., review of Test Certificates / Reports and issue of Inspection Release Note / Certificate does not relieve the Client/ End User/ Supplier /
Manufacturer from their responsibility towards the Client / End User to supply / Use the genuine material / item(s) and document(s) in full compliance with applicable Order, Specification,
Technical, Quality, Quantity, Warranty, Guarantee requirements. Supplier / Manufacturer / stockist is wholly legally responsible for genuineness of the material / item (s) supplied and
document(s) submitted. TÜV India’s responsibility is only limited to correctness of inspection results including review of the documents, within its agreed scope against written requirements and
neither TUV India nor any of its group companies, associates or employees are in any way/ legally responsible for genuineness of the material / item(s) and document(s).
Copyright: This document is the property of TUV India and should not be reproduced, except in full without the consent of TUV India Pvt. Ltd.
TUV IPL (TÜV NORD GROUP): (REGD. & HEAD OFFICE), 801, Raheja Plaza - I, LBS Marg, Ghatkopar (West), Mumbai – 400086, Maharashtra, India.
Tel: + 91 22 66477000, Email: inspection@tuv-nord.com Website: www.tuv-nord.com/in
Form No. : F / INSP / IRN / 03 – R4; Revision Date: 28/09/2018 Page 1 of 2
TUV INDIA PRIVATE LIMITED
INSPECTION RELEASE NOTE / CERTIFICATE
Number: 8116864113/100 – IRN – 20.09.2018 – Niraj Vyas – Revision 0

10) Temperature Rise test ( Transformer Sr 64225/01 & 64224/03 ) found as per datasheet
11) Noise level test (Transformer Sr 64225/01 & 64224/03 ) found within limit.
12) Zero sequence impedance test (Transformer Sr 64225/01 & 64224/03 )
13) Measurement of Harmonics in no load current. (Transformer Sr 64225/01 & 64224/03 )
14) WTI Controller functional test.
15)
16)

Documents Reviewed:

1) Bought out items Test certificate , Calibration summary sheet,.

NCR / Waiver Acceptance: Client Email dated 19.09.2019 regarding compliance report.

Identification:
All Transformer are soft stamped near WTI Controller as “ “ .

Order Status:  Complete  Incomplete

Dates Of Inspection: 16.09.2019 to 18.09.2019

Conclusion: All items were inspected within the scope defined in approved QAP/ITP & found to meet the
requirements of Purchase Order & Specifications.

Niraj Vyas

Surveyor(S) to TUV India Private Limited

Distribution List:  TUVIPL Client/End User  TUVIPL Executing Branch/TUV Originating Branch  Vendor/Sub Vendor
Revision – 0 (If Applicable) – Type Justification. This Document Supersedes IRN No. type Number Dated 00.00.0000

Disclaimer: The inspection by TUV India Pvt. Ltd., review of Test Certificates / Reports and issue of Inspection Release Note / Certificate does not relieve the Client/ End User/ Supplier /
Manufacturer from their responsibility towards the Client / End User to supply / Use the genuine material / item(s) and document(s) in full compliance with applicable Order, Specification,
Technical, Quality, Quantity, Warranty, Guarantee requirements. Supplier / Manufacturer / stockist is wholly legally responsible for genuineness of the material / item (s) supplied and
document(s) submitted. TÜV India’s responsibility is only limited to correctness of inspection results including review of the documents, within its agreed scope against written requirements and
neither TUV India nor any of its group companies, associates or employees are in any way/ legally responsible for genuineness of the material / item(s) and document(s).
Copyright: This document is the property of TUV India and should not be reproduced, except in full without the consent of TUV India Pvt. Ltd.
TUV IPL (TÜV NORD GROUP): (REGD. & HEAD OFFICE), 801, Raheja Plaza - I, LBS Marg, Ghatkopar (West), Mumbai – 400086, Maharashtra, India.
Tel: + 91 22 66477000, Email: inspection@tuv-nord.com Website: www.tuv-nord.com/in
Form No. : F / INSP / IRN / 03 – R4; Revision Date: 28/09/2018 Page 2 of 2