INSPECTION RESULT
Satisfactory Unsatisfactory: Non Conformities Raised (Total number of NCR :…..)
Stage of inspection :
Type of inspection :
Stamping :
No
Results of inspection :
Satisfactory Unsatisfactory
Following our inspection of the AVAYA Networking system test & AVIAT Microwave System test along with the List of
materials as mentioned above and found satisfactory. However PUNCH LIST was issued.
INSPECTION DETAILS:
MEASURING EQUIPMENT USED: See continuation sheet for additional documents: Yes No
Equipment Type Equipment Identity n° Last Calibration date Expiry date
HANDHELD Ethernet Test set VM8A00N0210965 10-2-2014 N/A
LIST OF ATTACHEMENTS
Type of document Identification number Description
Avaya Networking System test 26032017-01 Test Certificate
Customer Punch points Customer Punch points
Microwave & Networking
091790-VP-IN-001-018 ITP
Inspection Procedure
Microwave Factory Acceptance
Appendix-1 FAT Test NCC & ADAILIYA
test
Microwave Checklist MEW 39 Microwave link FAT TEST Checklist
Overall Networking Checklist DI-92-TELE-001 ADAILIYA
Overall Networking Checklist P2-93-TELE-001 HAWALLY
Overall Networking Checklist NCC-91-TELE-001 NCC
FAT Network test
Customer Punch points Customer Punch points
On March 21 & 23, 2017 Bureau Veritas Inspector arrived at METCO –Ardiya for the Inspection of
Avaya Networking System test & Aviat Microwave system test.
Scope of Inspection:
- Inspection Details:
1- Visual inspection and dimensional check have been done as shown below
Panel Verification: all equipment located inside cabinet enclosure and found
satisfactory.
Wiring Verification: All wiring and cabling have been checked as per drawing and
found satisfactory.
2- Quantity check has been done for five items and found satisfactory.
3- Documents review have been done and found satisfactory.
4- Verification of traffic flow using Ethernet test set with microwave link and found
satisfactory.
5- Verification of Networking link functionality test and found satisfactory.
6- Verification of traffic path protection and redundancy of Integrated network test
including alarms on network management system and found satisfactory.
7- Overall networking simulation test was carried with satisfactory result.
All test are documented by METCO test report and attached to the Inspector’s report
Result of FAT: Satisfactory with punch points.
- Photos:
INSPECTION REPORT N°
BV Job nr: BV.KWT. 40.16.TPI.033.004 Date of issuance: 26/3/2017 Page 5 of 12
Project: Construction and Maintenance of Ref: BV.KWT. 40.16.TPI.033.004
Water Distribution Complex at AZZOUR WDC II
BV Client: MINISTRY OF ELECTRICITY & Supplier : METCO
WATER
INSPECTION REPORT N°
BV Job nr: BV.KWT. 40.16.TPI.033.004 Date of issuance: 26/3/2017 Page 6 of 12
Project: Construction and Maintenance of Ref: BV.KWT. 40.16.TPI.033.004
Water Distribution Complex at AZZOUR WDC II
BV Client: MINISTRY OF ELECTRICITY & Supplier : METCO
WATER
INSPECTION REPORT N°
BV Job nr: BV.KWT. 40.16.TPI.033.004 Date of issuance: 26/3/2017 Page 7 of 12
Project: Construction and Maintenance of Ref: BV.KWT. 40.16.TPI.033.004
Water Distribution Complex at AZZOUR WDC II
BV Client: MINISTRY OF ELECTRICITY & Supplier : METCO
WATER
INSPECTION REPORT N°
BV Job nr: BV.KWT. 40.16.TPI.033.004 Date of issuance: 26/3/2017 Page 8 of 12
Project: Construction and Maintenance of Ref: BV.KWT. 40.16.TPI.033.004
Water Distribution Complex at AZZOUR WDC II
BV Client: MINISTRY OF ELECTRICITY & Supplier : METCO
WATER
INSPECTION REPORT N°
BV Job nr: BV.KWT. 40.16.TPI.033.004 Date of issuance: 26/3/2017 Page 9 of 12
Project: Construction and Maintenance of Ref: BV.KWT. 40.16.TPI.033.004
Water Distribution Complex at AZZOUR WDC II
BV Client: MINISTRY OF ELECTRICITY & Supplier : METCO
WATER
HANDHELD Ethernet test tester During the Microwave and Networking test
Result of Functional test appear on LCD Monitor HANDHELD Ethernet test tester at fault situation with red li
Red light indicator visible.
INSPECTION REPORT N°
BV Job nr: BV.KWT. 40.16.TPI.033.004 Date of issuance: 26/3/2017 Page 10 of 12
Project: Construction and Maintenance of Ref: BV.KWT. 40.16.TPI.033.004
Water Distribution Complex at AZZOUR WDC II
BV Client: MINISTRY OF ELECTRICITY & Supplier : METCO
WATER
INSPECTION REPORT N°
BV Job nr: BV.KWT. 40.16.TPI.033.004 Date of issuance: 26/3/2017 Page 11 of 12
Project: Construction and Maintenance of Ref: BV.KWT. 40.16.TPI.033.004
Water Distribution Complex at AZZOUR WDC II
BV Client: MINISTRY OF ELECTRICITY & Supplier : METCO
WATER
INSPECTION REPORT N°
BV Job nr: BV.KWT. 40.16.TPI.033.004 Date of issuance: 26/3/2017 Page 12 of 12
Project: Construction and Maintenance of Ref: BV.KWT. 40.16.TPI.033.004
Water Distribution Complex at AZZOUR WDC II
BV Client: MINISTRY OF ELECTRICITY & Supplier : METCO
WATER
END OF REPORT