Industry & Facilities Division

Inspection Report N°: 091790-IN-PO-001-IR-019 Date of issuance: 26th Mar. 2017

Initial Interim Final


Rev. n°: Reason of revision: N/A

Inspection requested by: BV Korea

BV Inspection performed as Recognized Authority: No Yes


P/o nr:6018244-1326 P/o nr:091790-IN-PO-001
(client to BV) (client to Manufacturer)
Inspection performed on: March 21 & 23 , 2017 Location: At METCO, Ardiya Industrial Area
Previous Inspection: December 7,2016 Next Inspection: To be advise

MATERIAL / SUPPLY / SUBJECT OF INSPECTION ITEM / TAG Nr QTY


TPI of IP & LAN SYSTEM AZZOUR WDC1 1 lot

REFERENCE DOCUMENTS: See continuation sheet for additional documents: Yes No


Title Reference n° Rev. Approved by Date
Microwave & Networking ITP 091790-VP-IN-001-018 0 H. CRIS 30-11-16

INSPECTION RESULT
Satisfactory Unsatisfactory: Non Conformities Raised (Total number of NCR :…..)

BV Inspector: Armand G.SALVADOR BV Coordinator: Jeen Jose


Attachments:
BV Office: Kuwait
Yes (Total number of pages: ) No

Distribution: CLIENT MANUFACTURER BV OTHER …… ( specify)

Stage of inspection :

Before manufacturing During manufacturing Final Packing

Type of inspection :

Pre-inspection meeting Document and QC record review Visual examination, checks


Witnessing tests Manufacturing progress status Vendor assessment
Final inspection Packing

Stamping :

No

GM SI 101 - INSP 002 rev.1 August 2015 1 / 12


Industry & Facilities Division

Inspection Report N°: 091790-IN-PO-001-IR-019 Date of issuance: 26th Mar. 2017

Initial Interim Final


Rev. n°: Reason of revision: N/A

Results of inspection :

Satisfactory Unsatisfactory

Non Conformities Reports (NCR):


 NCR’s issued during reported period :

 List of outstanding NCR’s :

Main Conclusions & Remarks: (for details see continuation sheet)

Following our inspection of the AVAYA Networking system test & AVIAT Microwave System test along with the List of
materials as mentioned above and found satisfactory. However PUNCH LIST was issued.

Next visit scheduled : To be Advice

INSPECTION DETAILS:

ATTENDEES : See continuation sheet for additional documents: Yes No


Name Company Title (*) Note
Armand G.SALVADOR BV-Kuwait Industrial Surveyor
Chris Baleta METCO Team Leader
Dennis Fernandez METCO Networking-SPL
Mohammed Ibrahim METCO Microwave
(*) specify if BV inspector has role as supervisor or mentor (e.g. “BV Inspector – supervisor –”)

MEASURING EQUIPMENT USED: See continuation sheet for additional documents: Yes No
Equipment Type Equipment Identity n° Last Calibration date Expiry date
HANDHELD Ethernet Test set VM8A00N0210965 10-2-2014 N/A

LIST OF NON CONFORMITIES ISSUED:


NC
Description of the Anomaly
identification n°
NC01
NC02
….

LIST OF NON CONFORMITIES CLOSED:


GM SI 101 - INSP 002 rev.1 August 2015 2 / 12
Industry & Facilities Division

Inspection Report N°: 091790-IN-PO-001-IR-019 Date of issuance: 26th Mar. 2017

Initial Interim Final


Rev. n°: Reason of revision: N/A

LIST OF NON CONFORMITIES CLOSED:


NC id number Ref report n° Issued on Description

LIST OF ATTACHEMENTS
Type of document Identification number Description
Avaya Networking System test 26032017-01 Test Certificate
Customer Punch points Customer Punch points
Microwave & Networking
091790-VP-IN-001-018 ITP
Inspection Procedure
Microwave Factory Acceptance
Appendix-1 FAT Test NCC & ADAILIYA
test
Microwave Checklist MEW 39 Microwave link FAT TEST Checklist
Overall Networking Checklist DI-92-TELE-001 ADAILIYA
Overall Networking Checklist P2-93-TELE-001 HAWALLY
Overall Networking Checklist NCC-91-TELE-001 NCC
FAT Network test
Customer Punch points Customer Punch points

Description of the inspections carried out :


Introduction:

On March 21 & 23, 2017 Bureau Veritas Inspector arrived at METCO –Ardiya for the Inspection of
Avaya Networking System test & Aviat Microwave system test.

Scope of Inspection:

 Approved Bill of Materials was not present at the time of inspection


 Approved Engineering Drawing was not present at the time of inspection
 Inspection carried out as per Microwave and Networking Inspection Procedure
 Factory test Set-up
 Traffic Switching from microwave to fiber
 Traffic on Microwave
 FAT Network test
 Overall networking simulation test

GM SI 101 - INSP 002 rev.1 August 2015 3 / 12


Industry & Facilities Division

Inspection Report N°: 091790-IN-PO-001-IR-019 Date of issuance: 26th Mar. 2017

Initial Interim Final


Rev. n°: Reason of revision: N/A

- Scope of Inspection includes the below :


 Visual inspection and Dimensional check.
 Quantity check.
 Documents review.
 Other inspection as per client requirements
 Issue of Attestation Certificate / Inspection Report.

- Inspection Details:
1- Visual inspection and dimensional check have been done as shown below
 Panel Verification: all equipment located inside cabinet enclosure and found
satisfactory.
 Wiring Verification: All wiring and cabling have been checked as per drawing and
found satisfactory.
2- Quantity check has been done for five items and found satisfactory.
3- Documents review have been done and found satisfactory.
4- Verification of traffic flow using Ethernet test set with microwave link and found
satisfactory.
5- Verification of Networking link functionality test and found satisfactory.
6- Verification of traffic path protection and redundancy of Integrated network test
including alarms on network management system and found satisfactory.
7- Overall networking simulation test was carried with satisfactory result.

All test are documented by METCO test report and attached to the Inspector’s report
Result of FAT: Satisfactory with punch points.

- Photos:

NCC-Shuwaikh Cabinet Some of the cabinet ready for inspection


GM SI 101 - INSP 002 rev.1 August 2015 4 / 12
Industry & Facilities Division

INSPECTION REPORT N°
BV Job nr: BV.KWT. 40.16.TPI.033.004 Date of issuance: 26/3/2017 Page 5 of 12
Project: Construction and Maintenance of Ref: BV.KWT. 40.16.TPI.033.004
Water Distribution Complex at AZZOUR WDC II
BV Client: MINISTRY OF ELECTRICITY & Supplier : METCO
WATER

During the visual inspection of cabinet for material list


During the visual inspection of cabinet for material list
List as per G.A. Drawing List as per G.A. Drawing

At Dimensional check as per G.A.Drawing At Dimensional check as per G.A.Drawing

GM SI 101 - INSP 002 rev.1 August 2015


Industry & Facilities Division

INSPECTION REPORT N°
BV Job nr: BV.KWT. 40.16.TPI.033.004 Date of issuance: 26/3/2017 Page 6 of 12
Project: Construction and Maintenance of Ref: BV.KWT. 40.16.TPI.033.004
Water Distribution Complex at AZZOUR WDC II
BV Client: MINISTRY OF ELECTRICITY & Supplier : METCO
WATER

At Dimensional check as per G.A.Drawing Some of the Spare part

Some of the Spare part Some of the Spare part

GM SI 101 - INSP 002 rev.1 August 2015


Industry & Facilities Division

INSPECTION REPORT N°
BV Job nr: BV.KWT. 40.16.TPI.033.004 Date of issuance: 26/3/2017 Page 7 of 12
Project: Construction and Maintenance of Ref: BV.KWT. 40.16.TPI.033.004
Water Distribution Complex at AZZOUR WDC II
BV Client: MINISTRY OF ELECTRICITY & Supplier : METCO
WATER

LCD Monitor Some of the Spare part

Some of the Spare part Some of the Spare part

GM SI 101 - INSP 002 rev.1 August 2015


Industry & Facilities Division

INSPECTION REPORT N°
BV Job nr: BV.KWT. 40.16.TPI.033.004 Date of issuance: 26/3/2017 Page 8 of 12
Project: Construction and Maintenance of Ref: BV.KWT. 40.16.TPI.033.004
Water Distribution Complex at AZZOUR WDC II
BV Client: MINISTRY OF ELECTRICITY & Supplier : METCO
WATER

Some of the Spare part Some of the Spare part

Some of the Spare part Visual Inspection of Cabinet internal parts

GM SI 101 - INSP 002 rev.1 August 2015


Industry & Facilities Division

INSPECTION REPORT N°
BV Job nr: BV.KWT. 40.16.TPI.033.004 Date of issuance: 26/3/2017 Page 9 of 12
Project: Construction and Maintenance of Ref: BV.KWT. 40.16.TPI.033.004
Water Distribution Complex at AZZOUR WDC II
BV Client: MINISTRY OF ELECTRICITY & Supplier : METCO
WATER

HANDHELD Ethernet test tester During the Microwave and Networking test

Result of Functional test appear on LCD Monitor HANDHELD Ethernet test tester at fault situation with red li
Red light indicator visible.

GM SI 101 - INSP 002 rev.1 August 2015


Industry & Facilities Division

INSPECTION REPORT N°
BV Job nr: BV.KWT. 40.16.TPI.033.004 Date of issuance: 26/3/2017 Page 10 of 12
Project: Construction and Maintenance of Ref: BV.KWT. 40.16.TPI.033.004
Water Distribution Complex at AZZOUR WDC II
BV Client: MINISTRY OF ELECTRICITY & Supplier : METCO
WATER

At fault scene situation. A 19’’ LCD Monitor

GM SI 101 - INSP 002 rev.1 August 2015


Industry & Facilities Division

INSPECTION REPORT N°
BV Job nr: BV.KWT. 40.16.TPI.033.004 Date of issuance: 26/3/2017 Page 11 of 12
Project: Construction and Maintenance of Ref: BV.KWT. 40.16.TPI.033.004
Water Distribution Complex at AZZOUR WDC II
BV Client: MINISTRY OF ELECTRICITY & Supplier : METCO
WATER

During the actual Demonstration in-case of any fault in networking link

GM SI 101 - INSP 002 rev.1 August 2015


Industry & Facilities Division

INSPECTION REPORT N°
BV Job nr: BV.KWT. 40.16.TPI.033.004 Date of issuance: 26/3/2017 Page 12 of 12
Project: Construction and Maintenance of Ref: BV.KWT. 40.16.TPI.033.004
Water Distribution Complex at AZZOUR WDC II
BV Client: MINISTRY OF ELECTRICITY & Supplier : METCO
WATER

END OF REPORT

Inspected by: Checked by:

Name : Armand G.Salvador Name: Ahmed Saleh

Signature:

Signature:

Inspection Office: BV -Kuwait Supervision during performance No Yes

GM SI 101 - INSP 002 rev.1 August 2015