F - ABCD - 43FLBLDG - 58

ABC Construction Corporation


Project:
TYPE YOUR PROJECT NAME

REQUEST FOR INSPECTION RFIPE No. :


OF PASSENGER ELEVATOR

Contract Package : Date of inspection :


Contractor : Location / Floor level :

SYSTEM / SERVICES :

Buffer/ Base Stopper Support Door Jamb / Hall Assy. Wireway / trunking
Guide Rails and Bracket Main, Sub-Weight Assy. Supervisory Panel
Machine Beams / Support Car, Panel Assy. Remote Contol Conduit/ Wiring
Traction Machine and Sheave Assy. Control Panel Assy. Shaft Wireway / Wiring
Power / Travelling Rope Assy. Power System Wiring Others
Car Sheave Assy. Control Wiring

ITEM NO. ITEM FOR INSPECTION Accptd Rejected REMARKS

1.0 Plumbness

2.0 Alignment

3.0 Spacing

4.0 Bracket

5.0 Anchor Bolt

6.0 Weld Points

7.0 Painting Primer

8.0 Tightness

9.0 Others

REFERENCES / ATTACHMENTS :

Requested by: Inspected by:

CONTRACTOR

Noted by:
QC

PROJECT SUPERVISOR

Approved by: Noted by:

VP-CONSTRUCTION OPERATIONS

Rev. 0 August 27,2019