Pumps (Booster, Transfer, Sump, Circulating Cleanout (floor, wall & ceiling)
Pumps and Deep Well) Drains (floor, scupper, gutter, area trench, pool, deck & parking)
Tanks (Hydropneumatic, Filter Media, Manholes (sewer, drainage)
Storage & Grease) Pipe (C.I. Hubless, ASTM A-888 GI sch. 40 ASTM A-120-80,
Instrument / Devices (Gauges, Pressurization ASTM A-110-80, CDP, CSP, PVC Series 1000, 600)
Switches Meter) Pipe fittings (flanges, coupling, strainers, unions, elbows)
Valves (Gate, Butteryfly check, Pressurization Others
Reducing Air Relief, Faucet, Hose Bibbs)
SANITARY CONTRACTOR
PROJECT SUPERVISOR
APPROVED BY: QC
NOTED BY :
VP-CONSTRUCTION OPERATIONS
NOTE : This form must be submitted to The QC TEAM, duly accomplished and signed by the corresponding