File No. ECR/114/2022-O/o Dy.CE/CON/S/DDU/ECR (Computer No.

166960 ) 6

Elevation Drawing Barun Side Sheet-4.pdf

Details of Geostrip Sheet-5.pdf

Typical Cross Section of RE wall Sheet -6.pdf

Material Specification of RE Wall Sheet- 7.pdf

Details of Crash Barier sheet -8.pdf

Panel Reinforcement Details sheet- 9.pdf

Panel Reinforcement Details Sheet-10.pdf

Panel Reinforcement Details Sheet -11.pdf

06/07/2022 10:43 PM
AJEET KUMAR SINGH
(AEN/CON/S/DDU/ECR)

Note No. #13

Compliance of Note #7 is in juxta position in note #12, submitted for approval


pl,

07/07/2022 10:08 AM
RAMESHWAR SINGH
(DY.CE/CON/S/DDU/ECR)

Note No. #14

Pl check.

07/07/2022 10:34 AM
PRAVIN KUMAR PREM
(DY.CE/CON/DEGN/S/MHX/ECR)

Note No. #15

Design Section Comments

After scrutinizing the RE Wall design & drawing, some observations were sent
vide Norte#7. Now revised drawing along with compliance in juxta-position have
been received vide Note#12.
List of drawings attached at Note#12 are as under:-

Sl. Item Sheet Remarks

Generated from eOffice by RAMESHWAR SINGH, DY.CE/CON/S/DDU/ECR, CONSTRUCTION on 22/07/22 02:54 PM


File No. ECR/114/2022-O/o Dy.CE/CON/S/DDU/ECR (Computer No. 166960 ) 7

No.
No.

1. GAD of RE Wall 1/11

2. LHS (A1 & A2) 2/11 Ok.

3. RHS (A1 & A2) 3/11

Design of Trough Wall has not been


submitted.
Trough Wall at the
Vertical reinforcement proposed in stem
junction towards Barun
towards earth side seems insufficient and
4. Side and RE Wall 4/11
vertical reinforcement proposed in stem
details towards Barun
towards other side is excessive. Also main
Side.
reinforcement proposed in foundation slab is
less. However it will be finalized after
scrutiny of the design calculation.

Design Height of RE
5. 5/11
Wall

Ok.
6. Typical Cross Section 6/11

7. Specification of RE Wall 7/11

Either Design or reference of standard


8. Crash Barrier 8/11 drawing of crash barrier should be
submitted.

9. Panel 9/11

10. Panel reinforcement 10/11 Ok.

11. Panel reinforcement-1 11/11

Field unit may be advised for submission of proof checked structural design &
drawing of RE Wall along with Trough Wall from IIT/NIT along with proof checked
certificate. After getting proof checked design & drawing, it will be processed for
approval from competent authority.

21/07/2022 11:09 AM
DAVID MURMU
(SSE/DRG./CON/S/MHX/ECR)

Note No. #16

Generated from eOffice by RAMESHWAR SINGH, DY.CE/CON/S/DDU/ECR, CONSTRUCTION on 22/07/22 02:54 PM


File No. ECR/114/2022-O/o Dy.CE/CON/S/DDU/ECR (Computer No. 166960 ) 8

May be forwarded to field unit for submission of proof checked structural design
& drawing of RE Wall along with Trough Wall from IIT/NIT along with proof
checked certificate. After getting proof checked design & drawing, it will be
processed for approval from competent authority.

21/07/2022 11:17 AM
SHAILESH KUMAR
(XEN/CON/DESN/S/MHX/ECR)

Note No. #17

May be forwarded to Dy.CE/C/DDU for submission of proof checked structural


design & drawing of RE Wall along with Trough Wall from IIT/NIT along with
proof checked certificate. After getting proof checked design & drawing, it will be
processed for approval from competent authority.

21/07/2022 12:22 PM
PRAVIN KUMAR PREM
(DY.CE/CON/DEGN/S/MHX/ECR)

Note No. #18

For immediate necessary action.

21/07/2022 4:06 PM
ASHUTOSH KUMAR MISHRA
(CE/CON/S/MHX/ECR)

Note No. #19

Pl ask

22/07/2022 12:02 PM
RAMESHWAR SINGH
(DY.CE/CON/S/DDU/ECR)

Generated from eOffice by RAMESHWAR SINGH, DY.CE/CON/S/DDU/ECR, CONSTRUCTION on 22/07/22 02:54 PM