3 (DP)
Unit 1 - Celtic Park - Newport
Sheet Nr 1 of 14
Calculation Design by KW Checked by DG/SD
Pile Design
Date 20/07/15 Date 20/07/15
Green Piling Limited · Smithy Brook Road · Renishaw · Sheffield S21 3JS · Tel: 08450 511 800 · Fax: 08450 511 811
Validation 3.1
Contents
pages 1 Front Cover
2 Contents & References
3 Project details
4 General soils profile and design approach
5 Extract borehole section
6 Set calculation 177 OD Tube compression load load case 1
7 Set calculation 177 OD Tube compression load load case 2
8 Set calculation 177 OD Tube compression load load case 3
9 Suggested pile head detail
10 Structural axial capacity
11 Horizontal load capacity
12 Corrosion calculation
13 Eccentic check
14 Pile test report summary
References
British Standards Date Title Used
1 BS8004 1996 Code of Practice for Foundations
2 BS5400 2005 Steel Concrete and Composite Bridges
3 BS 8110 1997 Structural Use of Concrete
Euro Codes Date Title Used
4 BS EN 1994-1-1 2004 Design of Composite Steel and Concrete Structures - Buildings
5 BS EN 1993-5 2007 Design of Steel Structures Part 5 -Piling
6 BS EN 1993-1-12 2007 Additional Rules for Steel Grades upto S700
7 BS EN 1997-1 2004 Geotechnical Design
8 BS EN 12699 2001 Execution of Special Geotechnical Work Displacement Piles
9 BS EN 12794 2005 Precast Concrete products- Foundation Piles
10 BS EN 14688 2004 Identification and Classification of Soils
11 BS EN 14689 2003 Identification and Classification of Rocks
CIRIA Reports Date Title Used
12 C504 1999 Engineering in Glacial Till
13 C570 2001 Engineering in Mercia Mudstone
14 C574 2002 Engineering in Chalk
15 Report 181 1999 Piled Foundations in Weak Rock
16 Report 32 1984 Construction over Abandoned Mine Workings
17 Report 103 1984 Design of Laterally Loaded Piles
Highways Date Title Used
18 1600 Series 1998 Piling and Embedded Retaining Walls
19 1800 Series 2004 Structural Steelwork
Others Date Title Used
20 M J Tomlinson 2001 Foundation Design and Construction 7th Edition
21 NHBC 2006 Chapter 4 Foundations
22 SCI 1997 Steel Bearing Piles Guide
26 Hiley 1967 Pile Driving Calculations
Project Contract Nr 1104 Revision 1.3 (DP)
Unit 1 - Celtic Park - Newport
Sheet Nr 3 of 14
Calculation Design by KW Checked by DG/SD
Pile Design
Date 20/07/15 Date 20/07/15
Green Piling Limited · Smithy Brook Road · Renishaw · Sheffield S21 3JS · Tel: 08450 511 800 · Fax: 08450 511 811
Project Details
Green Piling have been appointed to design, supply, install and test (where required) driven open ended
steel tubular piles to form part of foundation for a new build industrial unit. The works will be undertaken
with due cognisance of the Atkins' Technical Note 179
Ground Investigation
Specification
As Green Piling technical proposal SA/7659/001 dated 28th April 2015 and this design.
Drawings
7545 01 - pile layot
7546 02 - pile schedule
Pile Loadings
Vertical Load Horizontal Load Tension Load NSF assessment
Load Case kN kN kN kN
1 150 20 0 0
2 290 13 0 0
3 540 0 0 0
All piles are restrained in two directions by ground beams such that bending moments due to pile positional
tolerances need not be considered in the design of piles.
Pile Type
1 to 3 177 mm diameter driven tubular 8.9 wt Ab = 0.025 m2 As = 0.557 m2/m
Pile Specification
Steel Tube Piles are previously used API (American Petroleum Institute) casing to 5L spec
The grades are generally N80 to L80 which produces yield stresses of upto 552
kN/m2
Layer 4 Clay
Layer 5 Mudstone
The soils information available is not extensive enough to enable static geotechnical
calculations for bearing capacity to be provided therefore for compressive loads piles will be
driven to a set calculated on page 6,7 & 8.
-1.0 MADE
GROUND
MADE
GROUND
MADE MADE
-2.0 GROUND GROUND
CLAY
-3.0
CLAY
PEAT
CLAY
-4.0
CLAY
CLAY
PEAT
-5.0 PEAT
PEAT
-6.0 CLAY
PEAT
PEAT
-7.0
Depth (m)
CLAY
-8.0
SAND
CLAY
-9.0
CLAY SANDY
CLAY CLAY
-10.0
GRAVELLY CLAY
CLAY
SAND & SAND
GRAVEL
SAND &
-11.0
GRAVEL
MUDSTONE
GRAVEL
MUDSTONE MUDSTONE
-12.0 CLAY
GRAVEL
-13.0
CLAY
-14.0
-15.0
SET
CALCULATION
which states
Therefore
S= 13800 - 10
1080 2
S= 7.8 mm/Blow
Set for 10 Blows = 75 mm/ 10 blows
Project Contract Nr 1104 Revision 1.3 (DP)
Unit 1 - Celtic Park - Newport
Sheet Nr 7 of 14
Calculation Design by KW Checked by DG/SD
Pile Design
Date 20/07/15 Date 20/07/15
Green Piling Limited · Smithy Brook Road · Renishaw · Sheffield S21 3JS · Tel: 08450 511 800 · Fax: 08450 511 811
SET
CALCULATION
which states
Therefore
S= 6900 - 10
580 2
S= 6.9 mm/Blow
Set for 10 Blows = 65 mm/ 10 blows
Project Contract Nr 1104 Revision 1.3 (DP)
Unit 1 - Celtic Park - Newport
Sheet Nr 8 of 14
Calculation Design by KW Checked by DG/SD
Pile Design
Date 20/07/15 Date 20/07/15
Green Piling Limited · Smithy Brook Road · Renishaw · Sheffield S21 3JS · Tel: 08450 511 800 · Fax: 08450 511 811
SET
CALCULATION
which states
Therefore
S= 6900 - 10
300 2
S= 18.0 mm/Blow
Set for 10 Blows = 180 mm/ 10 blows
Project Contract Nr 1104 Revision 1.3 (DP)
Unit 1 - Celtic Park - Newport
Sheet Nr 9 of 14
Calculation Design by KW Checked by DG/SD
Pile Design
Date 20/07/15 Date 20/07/15
Green Piling Limited · Smithy Brook Road · Renishaw · Sheffield S21 3JS · Tel: 08450 511 800 · Fax: 08450 511 811
Steel tubular pile driven open ended do not require any particular head detail as part of
the pile design as the structural element of the pile is the steel tube itself. However in some
cases an unprepared pile head will cause punching shear overstressing in ground beams or
pile caps. We therefore recommend that the pile-sub structure connection is specifically
designed in conjunction with the sub-structure. For guidance purposes only we suggest
the following details to transfer loads to piles and to create some fixity between pile and
structure. reinforcement ( min 1no. T12/T16@1500mm)
blinding level
OPTION TWO
Plugged Material
Plan
Project Contract Nr 1104 Revision 1.3 (DP)
Unit 1 - Celtic Park - Newport
Sheet Nr 10 of 14
Calculation Design by KW Checked by DG/SD
Pile Design
Date 20/07/15 Date 20/07/15
Green Piling Limited · Smithy Brook Road · Renishaw · Sheffield S21 3JS · Tel: 08450 511 800 · Fax: 08450 511 811
3 2
Mu=0.95 S fy(1+0.01m) where S = t ( De/t -1)
ultimate bending moment section m from Figure A2 using r and De/t
r =0.4fcu/0.95fy
Section ModuluS=t3(De/t-1)2 S 139106.3 mm3
r 0.023
m From Figure A.2 Chart with D 33 m 2.8
Mu=0.95 S fy(1+0.01m) 74.8 kNm
Mx = Mu( 1- k1 Nx/Nu) assuming k2 k3 = 0 obtaining k1 from chart 37 using l
0.45EcIc+ 0.95 EsIs = 1984.41 kNm2 LE = 3343 mm l= 0.90
75.5 l= 68 k1 = 0.8 from chart 37
Mx = design ultimate including axial 69.7 kNm
Youngs modSteel Es 210.0 kN/mm2
Youngs modConcreEc =450fcu Ec 13.5 kN/mm2
Moment InertiaSte I=p/64(De4-d4) Is 8986746 mm4
Moment InertiaConI=pd4/64 Ic 31531320 mm4
P OD De Nu fos Mu Mx
290 177 169.5 1752 6.0 74.8 64.9
540 177 169.5 1752 3.2 74.8 56.4
Project Contract Nr 1104 Revision 1.3 (DP)
Unit 1 - Celtic Park - Newport
Sheet Nr 11 of 14
Calculation Design by KW Checked by DG/SD
Pile Design
Date 20/07/15 Date 20/07/15
Green Piling Limited · Smithy Brook Road · Renishaw · Sheffield S21 3JS · Tel: 08450 511 800 · Fax: 08450 511 811
Tomlinson equation 6.23 gives the ultimate lateral load on a pile as ref(20)
Hu `= Mx/(e+zf)
N where Mx=design ultimate moment of section
e= ecentricity of load =0
H zf= depth to point of fixity
normally 1.5m in stiff clays and compact cohesionless material
zf or upto 3m in soft clays and silts
Brohms analysis can be used to predict the imposed moment developed by horizontal loading
In more complicated cases or where otherwise required programs such as LPILE or ALP
can be used to model moment throughout pile
Project Contract Nr 1104 Revision 1.3 (DP)
Unit 1 - Celtic Park - Newport
Sheet Nr 12 of 14
Calculation Design by KW Checked by DG/SD
Pile Design
Date 20/07/15 Date 20/07/15
Green Piling Limited · Smithy Brook Road · Renishaw · Sheffield S21 3JS · Tel: 08450 511 800 · Fax: 08450 511 811
CORROSION CALCULATION
INTERNAL CORROSION
EXTERNAL CORROSION
Corus Construction & Industrial
A corrosion protection guide for steel bearing piles in temperate climates
More recently, corrosion rates can be derived from the corrosion allowances published in
Eurocode 3 for service lives up to 100 years in non-aggressive and aggressive non-compacted
fills (long-term rates approximately 0.02mm/year/side and 0.06mm/year/side respectively)
ENV1993-5: 1997 Eurocode 3: Design of Steel Structures - Part 5: Piling /15/ (Table 8).
Table 8. Thickness loss from corrosion [mm] of piles and sheet piling in soils, above and below
water table.
Required service life 5 years 25 years 50 years 75 years 100 years
Undisturbed natural soil (sand,
0.00 0.30 0.60 0.90 1.20
silt, clay,schist, etc.)
Contaminated natural soil and soil
0.15 0.75 1.50 2.25 3.00
of industrial areas
Aggressive natural soil (marsh,
0.20 1.00 1.75 2.50 3.25
bog, peat, etc.)
Non-compacted, non-aggressive
0.18 0.70 1.20 1.70 2.20
fill (clay, schist, sand, silt, etc.)
Non-compacted, aggressive fill
0.50 2.00 3.25 4.50 5.75
(ash, slag, etc.)
Note!
Corrosion rates are slower in compacted fills than in non-compacted fills. In the case of
compacted fills the above values are to be divided by two.
The values given are only indicative. Local conditions must always be considered.
The values for service lives of 5 and 25 years are based on measurements while the
rest are extrapolations
The affect of additional loads on pile sections as a result of eccentric loading for say
when piles are deflected out of tolerance should be assessed by the structural engineer
in relation to cap or beam design and by the pile designer with respect to imposed
moment on the pile section
P
The tables below are extracts from dynamic pile load test reports for testing carried out. From inspection of
the below and the formal report it can be seen that the mobilsed resistances are in excess of those
required offering a factor of safety in line with this design submission.
Test results
Pile No Installation Installation set (mm for Restrike set (mm for 10
Date 10 blows) Restrike date blows)
From inspection it can be seen that the pile rewstrikes have indicated pile set up and show no signs of relaxation.