Rail Vikas Nigam Limited

(A Govt. of India Undertaking)


Corporate Office: 1st Floor, ‘B’ Block, August Kranti Bhawan, Bhikaji Cama Place, New Delhi– 110066.
Tel: +91 11 2673850553, Fax +91 11 26738573,Email: pramodkumar.sharma@rvnl.org
No. C/Policy/Estimate & BOQ/2011/24 Pt.II Dated: 31.12.2018

All EDs(Projects)/CPMs/GGM/GMs
AGMs & DGMs/RVNL

Sub: RVNL’s Standard Bill of Quantities for Civil Engineering – December


2018
Ref: This office Letter of even No. 13.12.2017

1. The yearly exercise for updation of rates of Standard Bill of Quantities of RVNL has
already been completed and circulated vide letter no. C/Policy/Estimate &
BOQ/2011/24 Pt.III dated 31.10.2018. The Committee constituted for revision of
bidding documents in its final report, has considered necessary to revise certain
items of SBOQ, include few new items and also to issue revised SBOQ for all
disciplines duly updated upto March 2018.
2. Accordingly, the revised SBOQ for Civil Engineering works updated upto March
2018 is now being issued. Descriptions of item no. 1002, 2012, 2063a to 2063d,
2064a, 2076, 4029, 4029a, 5007, 5009, 5015, 5022, 5023, 5031, 6001e, 6003,
6004, 6005, 7001, 7002, 7005, 7018, 7027, 7028, 7061, 7063, 7064, 9003a, 9003b
& 9004 have been modified. Rates of item no. 1002d, 1003, 5007, 5031b, 5031c &
9004 have been revised. Item no. 2039, 6003, 6004, 6005, 7007c, 7018, 7021,
7027, 7028 & 7063 have been made site specific. Item no. 5031d & 5031e have
been deleted. The standard rate analysis for item no. 2012 and 7003 has been
revised. Standard rate analysis for item no. 2039, 7007c, 7021 have been
developed.

3. The revised SBOQ (Civil Engg.) contains a Preamble followed by SBOQ grouped
under 15 sub heads as under:-

S.No. Bill No. Heading of Bill


1 Bill No.1 Earthwork in Formation
2 Bill No.2 A Bridge work (Other than Steel Items)
3 Bill No.2 B Bridge work (Steel Items involving Fabrication and
Erection)
4 Bill No.2 C Supply of Steel Items
5 Bill No.3 Ballast Supply
6 Bill No.4 A P.Way Supply (Other than Steel Items)
7 Bill No.4 B P.Way Supply (Steel Items)
8 Bill No.5 A Permanent Way Linking: (Installation Works)
9 Bill No.5 B Permanent Way Linking: (Supply and Installation Works)
Page 1 of 19
10 Bill No.6 Buildings
11 Bill No.7 A Platform, Passenger Amenities and Misc. works (Other
than Steel Items)
12 Bill No.7 B Platform, Passenger Amenities and Misc. works (Steel
Items)
13 Bill No.8 Supply of Cement
14 Bill No.9 Site Facilities
15 Bill No. 10 Other items of work not covered in Bill No. 1 to 9

4. The SBOQ should be followed uniformly for preparation of Estimates, including


Detailed Estimates and preparation of BOQ for invitation of works tenders.

5. The rates for items as in the SBOQ should be strictly followed. However, the rates
for the following items are considered as site specific and should be analyzed
separately for each project.

Bill Bill Name Item Short description of item


No. No.
1 Earthwork in formation 1001 Earthwork in filling
1005 Blanketing
1011 Filling of sand
2 Bridge Works 2003 M-10 Concrete
2004 M-20/M-25 Concrete
2005 RCC
2006 PSC Girders
2011 M-45 PSC Slabs
2012 PSC Blocks
2014 CC/RCC for precast members
2015 Stone backing
2016 Backfill behind abutments
2017 Stone pitching
2022 Pile boring and installation
2029 Supply and filling sand in well/box
culvert)
2039 Random rubble masonry
3 Ballast supply 3001 Supply of ballast on cess
3002 supply of ballast in depot
6 Buildings (see para 7 6001 Service Buildings
below) 6002 Residential Buildings
6003 Water booths
6004 Precast RCC platforms fencing
6005 Precast RCC benches
7 Platform, Passenger 7001 Platform Wall

Page 2 of 19
Bill Bill Name Item Short description of item
No. No.
amenities and 7002 1:3:6 Nominal Mix Concrete
miscellaneous works 7003 1:2:4 Nominal Mix Concrete
7004 Earthwork in filling for platform etc
7007c Vacuum dewatered cement concrete
7018 station name board
7021 Brick work
7027 RCC Hectometre & Reference Posts
7028 cement concrete STEPS for FOB
7033 Re-grading and widening of existing LC
7063 MS benches
8 Supply of Cement 8001 OPC 43 grade Cement
8002 OPC 53 grade Cement
8003 Portland Pozzolana Cement
8004 Portland Slag Cement
10 Other items of works 10001 Unified SOR Items (see para 8 below)
not covered in Bill No.
1 to 9

6. Two new items (No. 2047 & 2048) for exploratory boreholes and one new item (no.
9005) for large format plotter have been included in the SBOQ. Item no. 2047 is for
drilling boreholes in all type of soils except hard rock and item no. 2048 is for rock.

7. The rate for site specific items for Bill no. 1, 2, 3, 6 (except item no. 6001 & 6002),
7 & 8 should be analyzed based on the standard rate analysis (as issued from time
to time and being uploaded on website) by adopting local market rates of inputs
and labour. However, while proposing the rates, the rates being obtained for
similar items of work on Zonal Railways in adjacent sections should be kept in view
and any substantial deviations in the rates should be justified. If no such rate is
available, CPM may certify the same. Revised standard rate analysis for item no.
2012 and 7003 along with new standard rate analysis for item no. 2039, 7007c,
7021 is enclosed herewith. However, no standard rate analysis for site specific
item no. 6003, 6004, 6005, 7018, 7027, 7028 & 7063 have been prepared as the
rate for these items to be worked out by PIUs themselves depending upon the
drawing which is to be mentioned in respective item by PIU while preparing the
BOQ for a tender.

8. The rate for supply of Cement in Bill No.8 may be worked out as an average of the
prevailing market rates of three popular brands of cement in the area at the time of
preparation of BOQ/Detailed Estimate. While working out such rates, instructions
issued vide this office letter no. C/Standard/BOQ/2008 Pt.V dated 17.06.2015
should also be kept in view.

Page 3 of 19
9. As the payment for item no. 6001 & 6002 Bill No.6 (Buildings) is to be made on
plinth area basis, the specifications for buildings are required to be incorporated in
the bidding document so that the scope of work is clear to the bidders. The model
specifications as specified in SBD are to be adopted. However, if the concerned
Zonal Railway insists for changes as per their laid down specifications, these
changes may be incorporated in the Bidding document specifically bringing out the
changes from the model specifications and the financial implications of the same at
the time of submission of Detailed Estimate for approval of Corporate Office.

The rates for item no. 6001 & 6002 of Bill No. 6 should be site specific and rates
adopted as per rates/building cost indices circulated by zonal Railway(s) for
preparation of estimates. In case, such rates/cost indices are not available, rates of
CPWD, state PWD, Govt. departments/PSUs etc as applicable in /around project
area may be obtained or rate analysis may be done.

10. Bill no. 10 is for items of work not covered in Bill no. 1 to 9 required to be executed
which cannot be foreseen at the time of inviting tender. Execution of such items of
works shall be done through various items covered by chapters 1 to 25 of Unified
SOR of Zonal Railway in whose jurisdiction majority of the project length falls,
which shall be indicated in this schedule with year of USOR. The amount of item
no. 10001 is to be arrived at by considering the prevailing percentage above/below
in the area. The total amount/value of the USOR items should not exceed 1% of
the total contract value subject to a maximum of Rs. 1 (one) crore.

PIUs may also include specific Unified SOR items with specific quantity and
rate as per requirement as NS items in this bill.

This bill will be operated for only those works, which cannot be executed by
operation of BOQ items in other bills.

11. In the bill of quantities, if any new item is required to be added the same should be
incorporated at the end of the relevant bill, duly justifying the same.

12. While submitting estimate or BOQ to the Corporate Office for approval/sanction,
the following certificate should invariably be recorded in the forwarding letter by
CPM/GM in-charge of the project.

“No charges have been made in the description, Unit and rate of items of the
SBOQ, except for the following: -

i) The rates of item No(s)…………………..have been analyzed and


vetted by Finance and the same has been adopted in the BOQ.

Page 4 of 19
The rates being obtained for similar items of works on Zonal Railways
in adjacent sections have been kept in view and any substantial
deviation in rates have been justified (if no such rate is available,
CPM may certify the same).

ii) New item No……..in Bill No…….and item No………in Bill No……have
been added for which rates have been analyzed and vetted by
Finance.”

13. Soft copies of the above mentioned documents are being sent through email and
also being uploaded on the website.

This issues with the approval of CMD/RVNL.

Encl: As above in Annexure-A

(P. K. Sharma)
Group General Manager/P-II

Copy to:

1. Secy to CMD – for kind information of CMD please.


2. DP, DO, DPE & CFO – for kind information please.
3. All PEDs & EDs in Corporate Office – for kind information please.
4. All GMs/DGMs(Finance)

Page 5 of 19
Annexure-A
STANDARD RATE ANALYSIS FOR SITE SPECIFIC ITEMS

Item no. 2012:

(based on item no. 4.1.3, 4.7.1, 5.9.1, 6.1.1, 6.4.1 & 11.1.2 of CPWD Delhi DAR 2016 )
S. Description Unit Quantity Rate Amount Remarks
No.

Details of cost for 1:2:4 Analysis based on item no.


concrete 20mm aggregates 4.1.3 of CPWD Delhi DAR 2016.
1 1 cum without cement        
  MATERIALS:          
The material rates as per basic
Stone Aggregate (Single
1.1 cum 0.67 1300.0 871 rates for materials Code No.
size) : 20 mm nominal size
0295 of CPWD Delhi DAR 2016.

Stone Aggregate (Single The material rates as per basic


1.2 size) : 10 mm nominal size cum 0.22 1300.0 286 rates for materials Code No.
at site of work 0297 of CPWD Delhi DAR 2016.

The material rates as per basic


Carriage of stone
1.3 cum 0.89 103.77 92.36 rates for materials Code No.
aggregates
2202 of CPWD Delhi DAR 2016.

The material rates as per basic


1.4 Coarse sand at site of work cum 0.445 1200.0 534 rates for materials Code No.
0982 of CPWD Delhi DAR 2016.

The material rates as per basic


1.5 Carriage of sand cum 0.445 103.77 46.18 rates for materials Code No.
2203 of CPWD Delhi DAR 2016.
  LABOUR:          
Rates as per basic rates for
1.6 Mason (average) day 0.1 467 46.7 labour Code No. 0155 of
CPWD Delhi DAR 2016.
Rates as per basic rates for
1.7 Beldar day 1.63 368 599.84 labour Code No. 0114 of
CPWD Delhi DAR 2016.
Rates as per basic rates for
1.8 Bhisti day 0.7 407 284.9 labour Code No. 0101 of
CPWD Delhi DAR 2016.
Rates as per basic rates for
Hire charges of Concrete
hire charges for plant and
1.9 Mixer 0.25 to 0.40 cum day 0.07 800 56
machinery Code No. 0002 of
with hopper
CPWD Delhi DAR 2016.
Rates as per basic rates for
1.1 Vibrator (Needle type 40 hire charges for plant and
day 0.07 350 24.5
0 mm) machinery Code No. 0012 of
CPWD Delhi DAR 2016.

Page 6 of 19
S. Description Unit Quantity Rate Amount Remarks
No.
1.1
Sundries L.S. 14.3 1.73 24.74  
1
Cost of 1 cum 1:2:4
A       2,866.22  
concrete
             

Details of cost for 25 nos.


Analysis based on item no.
2 blocks, 25x25x20 cm size        
4.7.1 of CPWD Delhi DAR 2016.
1:2:4 concrete 20mm
aggregates
Volume =25 no x 0.25 m x
  0.25 m x 0.2 m = 0.3125          
cum
2.1 Cement Concrete cum 0.3125 2,866.22 895.69 Rate as per (A) above
  Centering and Shuttering          
  (1) Mould          
(i) Plate 3 mm thick
  (4x0.25x0.20)=0.2 sqm @          
23.55 kg/sqm = 4.71 kg
(ii) Flat 10x5mm handle
  2x0.25m = 0.5m @ 0.4          
kg/m = 0.2 kg
  total steel = 4.91 kg          
Assuming shuttering will
become unserviceable after
use of 40 times and taking Rate as per item no. 10.1 of
2.2 kg 0.0921 58.45 5.38
75% credit, qty taken for CPWD Delhi DAR 2016.
cost for using once
=4.91x0.75/40=0.0921 kg
(2) Moulding Platform
Assuming platform will
become unserviceable after
AOR as per item no. 11.1.2 of
use of 40 times. (i) Brick on
CPWD Delhi DAR 2016
2.3 edge flooring cement        
(quantity taken only for 0.1
mortar 1:6 - 1x2.0x2.0m = 4
sqm)
sqm
Qty taken for cost of using
once = 4/40 = 0.1 sqm
Rates as per basic rates for
2.3. Common burnt clay FPS 1000
0.00565 4500 25.43 materials Code No. 2602 of
1 bricks designation 75 nos.
CPWD Delhi DAR 2016.
Rates as per basic rates for
2.3. 1000
Carriage of bricks 0.00565 276.72 1.56 materials Code No. 2201 of
2 nos.
CPWD Delhi DAR 2016.
Rates as per rate analysis for
2.3.
Cement Mortar 1:6 Cum 0.00434 1769.5 7.68 cement mortar 1:6 (below
3
AOR for item no. 2039).
2.3. Mason (brick layer) 2nd day 0.01080 448 4.84 Rates as per basic rates for

Page 7 of 19
S. Description Unit Quantity Rate Amount Remarks
No.
labour Code No. 0124 of
4 class
CPWD Delhi DAR 2016.
Rates as per basic rates for
2.3.
Beldar day 0.00250 368 0.92 labour Code No. 0114 of
5
CPWD Delhi DAR 2016.
Rates as per basic rates for
2.3.
Coolie day 0.01620 368 5.96 labour Code No. 0115 of
6
CPWD Delhi DAR 2016.
Rates as per basic rates for
2.3.
Bhisti day 0.00270 407 1.10 labour Code No. 0101 of
7
CPWD Delhi DAR 2016.
(ii) 25mm thick cement Rate as per (A) above. Labour
concrete 1:2:4 in pavement for fixing blocks in Item no.
2.00x2.00x0.025 = 0.100 2.6 to 2.8 above taken as
Qty taken for cost of using average of that for brickwork
2.4 once = 0.100/40 = 0.0025 cum 0.0025 2,866.22 7.17 Item no. 6.1.1 & 6.4.1 of
cum CPWD Delhi DAR 2016 as
labour element of item no.
4.7.1 is for lifting, hoisting and
fixing manually.
Rates as per rate analysis for
cement mortar 1:6 (below
Cement Mortar 1:2 for
AOR for item no. 2039). Qty
2.5 Fixing 0.1625/100x25 = cum 0.0410 1769.5 72.55
taken half of surface area with
0.041
10 mm thick mortar for 25
blocks.
Rates as per basic rates for
labour Code No. 0115 of
CPWD Delhi DAR 2016. Qty
2.6 Coolie day 0.495 368 182.16 reduced in proportion of
0.325/1.0 from average of
quantities given for CPWD
item no. 6.1.1 & 6.4.1.
Rates as per basic rates for
labour Code No. 0123 of
CPWD Delhi DAR 2016. Qty
Mason (brick layer) 1st
2.7 day 0.13 487 63.31 reduced in proportion of
class
0.325/1.0 from average of
quantities given for CPWD
item no. 6.1.1 & 6.4.1.
Rates as per basic rates for
labour Code No. 0124 of
CPWD Delhi DAR 2016. Qty
Mason (brick layer) 2nd
2.8 day 0.07 448 32.7 reduced in proportion of
class
0.325/1.0 from average of
quantities given for CPWD
item no. 6.1.1 & 6.4.1.
Rates as per basic rates for
2.9 Bhisti day 0.063 407 25.64 labour Code No. 0101 of
CPWD Delhi DAR 2016. Qty
Page 8 of 19
S. Description Unit Quantity Rate Amount Remarks
No.
reduced in proportion of
0.325/1.0 from average of
quantities given for CPWD
item no. 6.1.1 & 6.4.1.
Rates of carriage of bricks as
2.1 1000 per basic rates for materials
Carriage of blocks 0.025 276.72 6.92
0 nos. Code No. 2201 of CPWD Delhi
DAR 2016.
  TOTAL       1339.01  
  Add 1% Water charges       13.39  
  TOTAL       1352.40  
Add 15% Contractor's profit
        202.86  
and overheads
  Cost for 0.3125 cum       1555.26  
  Cost per cum       4976.83  
  Say       4977  

Item No. 2039:

(based on item no. 7.1.1 of CPWD DAR 2016 )

S. Description Unit Quantity Rate Amount Remarks


No.
  Details of cost for 1.00 cum          
  MATERIALS:          
Stone for masonry work cum 1 865.00 865 The material rates as per
basic rates for materials
1
Code No. 1157 of CPWD
Delhi DAR 2016.
Through and bond stone size 100 0.07 1260.00 88.2 The material rates as per
24x24x39 cm (@7 nos. per Nos basic rates for materials
cum) Code No. 1154 of CPWD
Delhi DAR 2016. The
2
quantity corrected from
0.007 to 0.07 cum as rate
is for 100 nos. i.e.
7/100=0.07.
Carriage: Carriage of Soling cum 1.16 122.08 141.61 Rates as per basic rates
stone & masonry stone 7.00 x for materials Code No.
24cm x 24cm x 39cm = 0.16 2215 of CPWD Delhi DAR
3
cum. 2016.
1.00 cum + 0.16 cum = 1.16
cum.
Cement Mortar 1:6 (1 cum 0.33 1769.50 583.94 Rates as per rate analysis
4 cement : 5 coarse sand) for 1:5 cement mortar
(given below)

Page 9 of 19
S. Description Unit Quantity Rate Amount Remarks
No.
Pointing with 1:3 cement sqm 3.5 139.35 487.73 Rates as per rate analysis
mortar (@3.5 sqm for 1 cum of for flush pointing with 1:3
5 RR masonry considering wall cement mortar (given
thickness of 40 cm and inside below)
and top face to be pointed)
  LABOUR:          
6 Mason (for plain stone work) day 1.07 448.00 Rates as per basic rates
2nd class   for labour Code No. 0125
of CPWD Delhi DAR 2016.
7 Beldar day 1.07 368.00
Rates as per basic rates
393.76 for labour Code No. 0114
of CPWD Delhi DAR 2016.
8 Coolie day 0.71 368.00 Rates as per basic rates
261.28 for labour Code No. 0115
of CPWD Delhi DAR 2016.
9 Bhisti day 0.09 407.00
Rates as per basic rates
36.63 for labour Code No. 0101
of CPWD Delhi DAR 2016.
10 Cement concrete 1:6:12 L.S. 0 1.73 0 Not applicable
11 Sundries L.S. 4.42 1.73 7.65  
  Total       2,865.80  
12 Add Water charges @ 1%       28.66  
  Total       2,894.46  
13 Add CPOH @ 15%       434.17  
  Total       3,328.63  
  Cost of 1 Cum       3,328.63  
  Say       3,329  

Rate Analysis for Cement Mortar (1:3 or 1:4 or 1:5 or 1:6):

(based on item no. 3.10 of CPWD DAR 2016, Note:-Rate analysis for 1:5 and 1:3 is same as cement cost
is not included)
S. Description Unit Quantity Rate Amount Remarks
No.
  Details of cost for 1 cum          
  Material          
             
1 tonn 0 5700.00 0.00
 
Portland Cement e
2 tonn 0 92.24 0.00
 
Carriage of cement e
3 Coarse sand (zone III) cum 1.07 1200.00 1284.00 Rates as per basic rates
Page 10 of 19
S. Description Unit Quantity Rate Amount Remarks
No.
for materials Code No.
982 of CPWD Delhi DAR
2016.
4 cum 1.07 103.77 111.03 Rates as per basic rates
for materials Code No.
2203 of CPWD Delhi DAR
Carriage of Coarse sand 2016.
  LABOUR          
         
For measuring, carrying,
depositing and mixing-  
5 day 0.75 368.00 276.00 Rates as per basic rates
for labour Code No. 0114
of CPWD Delhi DAR 2016.
Beldar
6 day 0.07 407.00 28.49
Rates as per basic rates
for labour Code No. 0101
of CPWD Delhi DAR 2016.
Bhisti
7 L.S. 26.91 1.73 46.55
Hire and running charges of  
mechanical mixer
8 Sundries L.S. 13.52 1.73 23.39  
  Cost of 1.00 cum       1769.47  
  Say       1769.50  

Rate Analysis for Flush/Ruled Pointing on Stone work (1:3 cement mortar):

(based on item no. 13.33.1 of CPWD DAR 2016 )


S. Description Unit Quantity Rate Amount Remarks
No.
  Details of cost for 10 sqm          
  Material          
1 Cement mortar 1:3 (1 cement : cum 0.023 1769.50 40.70 Rates as per rate analysis
3 fine sand) for 1:3 cement mortar
(given above)
2 Sundries L.S. 7.15 1.73 12.37  
  LABOUR          
3 Mason (average) day 0.92 467.00 429.64 Rates as per basic rates
for labour Code No. 0155
of CPWD Delhi DAR 2016.

Page 11 of 19
4 Coolie day 1.37 368.00 504.16 Rates as per basic rates
for labour Code No. 0115
of CPWD Delhi DAR 2016.

5 Bhisti day 0.93 407.00 378.51 Rates as per basic rates


for labour Code No. 0101
of CPWD Delhi DAR 2016.

6 Scaffolding and racking out L.S. 16.12 1.73 27.89  


joints including sundries
  TOTAL       1393.27  
  Add 1% water charges       0.00 Not to be considered here
  TOTAL       1393.27  
  Add 15% Contractor's Profit       0.00 Not to be considered here
and overheads
  Cost of 10.00 sqm       1393.27  
  Cost of 1.00 sqm       139.33  
  Say       139.35  

Page 12 of 19
Item no. 7003:

(based on item no. 4.1.3, 5.9.2 of CPWD Delhi DAR 2016 )

S.
No. Description Unit Quantity Rate Amount Remarks
1 CONCRETE          

Analysis based on item no.


  Details of cost for 1:2:4 4.1.3 of CPWD Delhi DAR
concrete 20mm aggregates 1 2016.
cum without cement        
  MATERIALS:          
The material rates as per
Stone Aggregate (Single size) basic rates for materials
1.1 cum 0.67 1300.0 871
: 20 mm nominal size Code No. 0295 of CPWD
Delhi DAR 2016.

The material rates as per


Stone Aggregate (Single size)
basic rates for materials
1.2 : 10 mm nominal size at site cum 0.22 1300.0 286
Code No. 0297 of CPWD
of work
Delhi DAR 2016.

The material rates as per


basic rates for materials
1.3 Carriage of stone aggregates cum 0.89 103.77 92.36
Code No. 2202 of CPWD
Delhi DAR 2016.

The material rates as per


basic rates for materials
1.4 Coarse sand at site of work cum 0.445 1200.0 534
Code No. 0982 of CPWD
Delhi DAR 2016.

The material rates as per


basic rates for materials
1.5 Carriage of sand cum 0.445 103.77 46.18
Code No. 2203 of CPWD
Delhi DAR 2016.

  LABOUR:          
Rates as per basic rates for
labour Code No. 0155 of
1.6 Mason (average) day 0.1 467 46.7
CPWD Delhi DAR 2016.

Rates as per basic rates for


labour Code No. 0114 of
1.7 Beldar day 1.63 368 599.84
CPWD Delhi DAR 2016.

Page 13 of 19
S.
No. Description Unit Quantity Rate Amount Remarks
Rates as per basic rates for
labour Code No. 0101 of
1.8 Bhisti day 0.7 407 284.9
CPWD Delhi DAR 2016.

Rates as per basic rates for


Hire charges of Concrete hire charges for plant and
1.9 Mixer 0.25 to 0.40 cum with day 0.07 800 56 machinery Code No. 0002
hopper of CPWD Delhi DAR 2016.

Rates as per basic rates for


hire charges for plant and
Vibrator (Needle type 40
1.10 day 0.07 350 24.5 machinery Code No. 0012
mm)
of CPWD Delhi DAR 2016.

1.11 Sundries L.S. 14.3 1.73 24.74  

A Cost of 1 cum 1:2:4 concrete       2,866.22  

             
Analysis based on item no.
2         5.9.2 of CPWD Delhi DAR
2016.
SHUTTERING
  Details of cost for          

Details for 7.9m long and


  1.00m high wall (thickness          
=55 cm reducing to 25 cm)

Area of contact
2.0mx7.9mx1.00m = 15.8
sqm.
           
Volume of Concrete =
7.9x1x(0.55+0.25)/2 = 3.16
cum

  Material:          

Assuming shuttering of
Material will become
unserviceable after use of 40
  times, Adding for          
maintenance @ 10% of cost,
Taking salvage value after
full use of material @ 25%

Page 14 of 19
S.
No. Description Unit Quantity Rate Amount Remarks

Wall form panel 1250x500


Rates as per basic rates for
mm - 2x3x2x2 = 24 nos., Qty
2.1 Each 0.51 900 459 materials Code No. 7319 of
taken for cost of using once
CPWD Delhi DAR 2016.
= 24x0.85/40=0.51

100 mm channel shoulder


Rates as per basic rates for
2.5 m long - 4x2 = 8 nos.,
2.2 Each 0.17 950 161.5 materials Code No. 7327 of
Qty taken for cost of using
CPWD Delhi DAR 2016.
once = 8x0.85/40=0.17

Double clip (bridge clip) -


Rates as per basic rates for
2x6x2 = 24 nos., Qty taken
2.3 Each 0.51 80 40.8 materials Code No. 7328 of
for cost of using once =
CPWD Delhi DAR 2016.
24x0.85/40=0.51

Single clip - 2x3x2 = 12 nos., Rates as per basic rates for


2.4 Qty taken for cost of using Each 0.255 62 15.81 materials Code No. 7329 of
once = 12x0.85/40=0.255 CPWD Delhi DAR 2016.

M.S. tube 40 mm dia - 2x2x8


Rates as per basic rates for
= 32 nos., Qty taken for cost metr
2.5 0.68 225 153 materials Code No. 7330 of
of using once = e
CPWD Delhi DAR 2016.
32x0.85/40=0.68

Nut & bolts - Qty taken for


2.6 cost of using once = L.S. 27.62 1.73 47.78  
1300x0.85/40=27.62
  Carriage L.S. 78.00000 1.73 134.94  
  Labour:          
Rates as per basic rates for
labour Code No. 0116 of
2.7 Fitter (Grade-1) Day 3.5 487 1704.5
CPWD Delhi DAR 2016.

Rates as per basic rates for


labour Code No. 0114 of
2.8 Beldar Day 6 368 2208
CPWD Delhi DAR 2016.

2.9 Shuttering oil L.S. 78 1.73 134.94  


2.1 Sundries L.S. 52 1.73 89.96  
  Total       5150.23  

  Add for Water Charges @ 1%       51.50  

  Total       5201.73  

Page 15 of 19
S.
No. Description Unit Quantity Rate Amount Remarks
Add for Contractor’s Profit
  and Overheads @ 15% (no       780.26  
rates reqd.)
  cost for3.16 cum       5981.99  
B cost per cum cum     1893.04  

Total cost of Concreting


C cum     4759.26 Add (A) & (B)
including shuttering

  Say       4759  

Item No. 7007C:

(based on item no. 16.75 of CPWD DAR 2016 )


S. Description Unit Quantity Rate Amount Remarks
No.
  Details of cost for 1.00 cum          
  MATERIALS:          
1 cum 1.00 4786.0 4786 Rates as per rate analysis
0 for item no. 2004 of BOQ
Concrete M 25 = 1.00 cum
i/c placing of concrete,
vibrating, levelling etc
2 Operational charges for L.S. 57.2 1.73 98.96  
vacuum dewatering system
i/c screed vibration, placing
of filter mat, top mat,
vacuum process, floating,
trowelling, Brooming etc.

3 T&P charges i/c consumable L.S. 41.6 1.73 71.97  


power charges, loading,
unloading and hire charges
of equipments

             
  Total       4,956.93  

4 Add 1% water charges on all       1.71  


except (1)
  Total       4,958.64  

Page 16 of 19
S. Description Unit Quantity Rate Amount Remarks
No.

Add 15% Contractor's Profit


5       25.9  
and overheads on all except
(1)
  Total       4,984.54  
  Cost of 1 Cum       4,984.54  
  Say       4,985  

BOQ Item No. 7021a and 7021b


(based on item no. 6.26.2 of CPWD DAR 2016 )
S.
No. Description Unit Quantity Rate Amount Remarks
  Details of cost for 1.00 cum          
  MATERIALS:          
1 Common burnt clay F.P.S. 1000 0.494 4,500.0 2223.00
(non modular) bricks class Nos 0 Rates as per basic rates for
designation 7.5 or 75 materials Code No. 2602 of
CPWD Delhi DAR 2016.

2 Carriage of bricks 1000 0.494 276.72 136.70


Rates as per basic rates for
Nos
materials Code No. 2201 of
CPWD Delhi DAR 2016.
3 Cement mortar 1:4/1:6 cum 0.25 1769.5 442.38 Rates as per rate analysis
0 for cement mortar (below
AOR for item no. 2039).
4 Sundries including L.S. 16.38 1.73 28.34  
steel/wooden strips for
making grooves.

  LABOUR:          
  For selection of bricks          
5 Beldar day 0.50 368 184.00 Rates as per basic rates for
labour Code No. 0114 of
CPWD Delhi DAR 2016.

6 Mason (brick layer) 1st class day 0.46 487 224.02 Rates as per basic rates for
labour Code No. 0123 of
CPWD Delhi DAR 2016.

7 Mason (brick layer) 2nd class day 0.46 448 206.08 Rates as per basic rates for
labour Code No. 0124 of
CPWD Delhi DAR 2016.

Page 17 of 19
S. Description Unit Quantity Rate Amount Remarks
No.
8 Coolie day 1.60 368 588.80 Rates as per basic rates for
labour Code No. 0115 of
CPWD Delhi DAR 2016.

9 Bhisti day 0.20 407 81.40 Rates as per basic rates for
labour Code No. 0101 of
CPWD Delhi DAR 2016.

  Extra labour for lifting of      


material (above floor two
level up to floor five level)    

10 Coolie day 0 368 0.00 not applicable


11 Sundries L.S. 0 1.73 0.00 not applicable
  Total       4,114.72  
12 Add 1% water charges       41.15  
  Total       4,155.87  

13 Add 15% Contractor's Profit       623.38  


and overheads
  Total       4,779.25  
  Cost of 1 Cum       4,779.25  
  Say       4,779  

Item No. 7021c:

(based on item no. 6.13.1 of CPWD DAR 2016 )


S.
No. Description Unit Quantity Rate Amount Remarks
  Details of cost for 10 sqm          
  MATERIALS:          
1 Common burnt clay F.P.S. 1000 0.565 4,500.0 2542.50
(non modular) bricks class Nos 0 Rates as per basic rates for
designation 7.5 or 75 materials Code No. 2602 of
CPWD Delhi DAR 2016.

2 Carriage of bricks 1000 0.565 276.72 156.35


Rates as per basic rates for
Nos
materials Code No. 2201 of
CPWD Delhi DAR 2016.
3 Cement mortar 1:3 cum 0.28 1769.5 495.46 Rates as per rate analysis
0 for cement mortar (below
AOR for item no. 2039).
Page 18 of 19
S.
No. Description Unit Quantity Rate Amount Remarks
4 Sundries & Scaffolding L.S. 13.52 1.73 23.39  
  LABOUR:          
5 Mason (brick layer) 1st class day 0.60 487 292.20 Rates as per basic rates for
labour Code No. 0123 of
CPWD Delhi DAR 2016.

6 Mason (brick layer) 2nd class day 0.60 448 268.80 Rates as per basic rates for
labour Code No. 0124 of
CPWD Delhi DAR 2016.

7 Coolie day 2.00 368 736.00 Rates as per basic rates for
labour Code No. 0115 of
CPWD Delhi DAR 2016.

8 Bhisti day 0.70 407 284.90 Rates as per basic rates for
labour Code No. 0101 of
CPWD Delhi DAR 2016.

  Extra labour for lifting of      


material (above floor two
level up to floor five level)    

9 Coolie day 0 368 0.00 not applicable


  Total       4,799.60  
10 Add 1% water charges       48  
  Total       4,847.60  

11 Add 15% Contractor's Profit       727.14  


and overheads
  Cost of 10 sqm       5,574.74  
  Cost of 1 sqm       557.47  
  Say       557  

Page 19 of 19