MANPOWER
Foreman Shafeequl isalm & Noufal A
Group Leader
Average No. of Erectors /day 13
No. of Crane/s on Site N/A
EQPTS.
No. of Boom loader on Site N/A
No. of Man lifts / Sissorlift 4 man lift-28m
No. of Forklifts N/A
From : Supplier ATC Office
PENDING ISSUES
PHOTOS
installation of roof monitor@ grid line
building status x4:x3/Y1:Y12
installation of roof monitor @ grid sag rod fixing & purlins joint bolt fixing @
line x3:x2/Y1:Y8 grid line 01:10/X3:X2-roof monitor