II. List of Manpower (To be filled up by Regional Planner and to be confirmed by SSPE on actual attendance)
NGCP Personnel MTD TL Other NGCP Group: __________
✓ Non-NGCP Personnel (Name of Contractor) : GEDI/TENGDA Power Construction
Member/s:
O
1 Wilson Rocha 11 Isidro Cinco Jr
2 Arnold Baylon 12 Wei Li
3 Rene Sasil 13 Mark Lester Ipili
4 Marlito Gabiana 14 Joshua Loquinio
5 Emelda Villafranca 15 Edwin Cabatas
PR
IV. Safety Measures and precautions including location where grounding clusters will be installed
(To be filled up by Substation Principal Engineer)
N/A
Equipment to be tagged/SEIL No. Equipment/Line Description Tag Control No. Tagged by: Tag Removed by:
N/A
WORK AREAS
Available
Yes No N/A
1. Documents and Clearances
✓ 1.1. For NGCP personnel
Maintenance Order
D
Other, specify:
VE
For 69kV and below, permission from District Head
✓ 6. Stringing Plan
PR
IX. Non-compliance and Correction Action (To be filled up by Substation Principal Engineer)
Remarks:
Acknowledged
Submitted by: REY JAY CARBAQUIL Submission by: ALEX ANTHONY B. PARTOSA
WG Team Lead Substation Principal Engineer
D
PARTOSA, ALEX Vis D3 Substation 12 FEB 2024 09:24 Shared
ANTHONY B. Section document.
PARTOSA, ALEX Vis D3 Substation 12 FEB 2024 09:24 Shared
ANTHONY B. Section document.
VE
BULFA, GLYNN B. Vis D3 Substation 12 FEB 2024 10:25 Approved.
Section
CAÑETE, LOPE L. Vis D3 Negros 14 FEB 2024 08:43 Approved.
O
PR