1- WORK REQUEST:
CM Request No. Requested Date Requested By System / Equipment
2- WORK PERMIT:
Urgency System/Equipment GT(s) Main Assistance
CM Permit No. Issued Date Prepared By Unit
Level Shutdown Shutdown Department Department
CM-INST-23/20 21-July-2020 MORISY 10 1 YES NO INST INST
KKS 10EKD10
Maintenance
Remarks
1- 2- 3-
Work Team
Names
4- 5- 6-
Performed
Job
Engineer
Remarks
No Description Part No. Qty
1
2
Used
3
Material
4
6
MAINTENANCE ENGINEER MAINTENANCE MANAGER
Name: Name:
Date: Date:
Signature: Signature:
MINISTRY OF ELECTRICITY ENERGY
PUBLIC ELECTRICITY CORPORATION
MARIB GAS POWER GENERATION STATION
PLANNING DEPARTMENT
1- WORK REQUEST:
CM Request No. Requested Date Requested By System / Equipment
Details of Defects To repair the potable water tank level because the signal appear as bad signal.
2- WORK PERMIT:
Urgency System/Equipment GT(s) Main Assistance
CM Permit No. Issued Date Prepared By Unit
Level Shutdown Shutdown Department Department
CM-INST-24/20 27-July-2020 MORISY 10 1 YES NO INST INST
KKS 10EKB01FL001A
Maintenance
Remarks
1- 2- 3-
Work Team
Names
4- 5- 6-
Performed
Job
Engineer
Remarks
No Description Part No. Qty
1
2
Used
3
Material
4
6
MAINTENANCE ENGINEER MAINTENANCE MANAGER
Name: Name:
Date: Date:
Signature: Signature: