Job Plan
MPC02-3M Description
Code
PM Content
Job Plans
Job Plan Description
Code Interval
References
1.
2.
Re Action by
Ser # Description Action-1 Action by Title Signature Date
v Names
Notes:
1. Action: Prepare / Edit / Review / Approval
Rev # Document Name Approved by Title Approved by Name Signature Date Page
1 of 6
E/OHSP-11-F-??
Work Order #: Machinery Maintenance & Inspection Work Instructions
PM Code PM Name PM Description Rev Date
MPC02
Asset Type Asset Type Description Manufacturer Model
Job Plan
MPC02-3M Description
Code
Rev # Document Name Approved by Title Approved by Name Signature Date Page
2 of 6
E/OHSP-11-F-??
Work Order #: Machinery Maintenance & Inspection Work Instructions
PM Code PM Name PM Description Rev Date
MPC02
Asset Type Asset Type Description Manufacturer Model
Job Plan
MPC02-3M Description
Code
E. Permits Forms:
It’s recommended to scan the forms and attach to the maximo work order
Permits Name Serial No.
1.
2.
3.
4.
F. Isolation Certificate Forms:
It’s recommended to scan the forms and attach to the maximo work order
Isolation Certificate Name Serial No.
1.
2.
Done
(2) Work Instructions Y/N
Comments
Operational Checks While Equipment RUNNING:
1. Check pump suction, discharge pressure and flow rate as specified in
pump specifications.
2. Check DE & NDE bearing temperature for overheating.
3. Check all related pressure and temperature gauges.
4. Check DE & NDE Mechanical Seal and their Plan System.
5. Check Lube oil system – Add Oil if necessary.
6. Check the pump cooling system – if exist.
7. Check and Clean Lube Oil Filter – Replace if necessary.
Visual Inspection:
8. Check pump for unusual sound and collect vibration data.
9. Inspect pump casing external coating for deterioration.
10.If vibration analysis involves misalignment probability Stop the pump to
carry out alignment.
Maintenance instructions while the Equipment STOPPED:
11.Check the alignment.
12.Check tightness of coupling fasteners, hub / transmission unit.
13.Check proper fixing of coupling guards.
14.Check base plate securing bolts tightness.
15.Clean the unit.
16. Run the pump in sequence and operation procedure.
G. Extra Work
Rev # Document Name Approved by Title Approved by Name Signature Date Page
3 of 6
E/OHSP-11-F-??
Work Order #: Machinery Maintenance & Inspection Work Instructions
PM Code PM Name PM Description Rev Date
MPC02
Asset Type Asset Type Description Manufacturer Model
Job Plan
MPC02-3M Description
Code
Done
(2) Work Instructions Y/N
Comments
Report any extra work and explain in the Clarification the reason for this extra work
Extra Work Clarification
1
2
H. Mandatory Recommendation
Report mandatory recommendation for enhancement of this Job Plan or PM
Recommendation’s Clarification
1
2
(3) Failure
Use Maximo Failures Codes (while feedback in Maximo)
Failure Problem Cause Remedy Failed MESC Item
Description Description Description Description Component Code
(4) Resources
A. Manpower
Planned Actual
Maximo Trade Position/Title No. of Duration Employee
SN
Trade Code Description Persons Hours Code Name Hours
1.
2.
3.
B. Tools
Only hold by other party OR requires request, permit, certification OR calibration as:
Cranes, Ultrasonic Thickness Gauge, hydro Test Pump, etc.
Planned Actual
Maximo Tool Duration Duration
SN Tool Description Qty
Code Hours Hours
1.
2.
3.
C. Spare Parts/ Materials
Also; define new items (items without MESC) by item description or part number
Rev # Document Name Approved by Title Approved by Name Signature Date Page
4 of 6
E/OHSP-11-F-??
Work Order #: Machinery Maintenance & Inspection Work Instructions
PM Code PM Name PM Description Rev Date
MPC02
Asset Type Asset Type Description Manufacturer Model
Job Plan
MPC02-3M Description
Code
Planned Actual
MESC Stock Item Part
SN Item Description Qty Qty
Item Code Number
1.
2.
3.
4.
5.
D. Services
Only provided through Contract or service order as: Inspection, Certification OR Renting Equipment, etc.
Planned Actual
Service code Service Description Service Order no.
(6) Observations
Report Observations that requires action to the Maintenance Supervisor
Observation Required Action
1.
2.
Rev # Document Name Approved by Title Approved by Name Signature Date Page
5 of 6
E/OHSP-11-F-??
Work Order #: Machinery Maintenance & Inspection Work Instructions
PM Code PM Name PM Description Rev Date
MPC02
Asset Type Asset Type Description Manufacturer Model
Job Plan
MPC02-3M Description
Code
Signature Signature
Signature Signature
Rev # Document Name Approved by Title Approved by Name Signature Date Page
6 of 6
E/OHSP-11-F-??