Code Interval
1 SEX01-1Y 1Y Annual external inspection, Heat Exchanger
2 SEX01-2Y 2Y 2-Year visual external&internal inspection, hydrotest, maintenance, Heat Exchanger
3 SEX01-4Y 4Y 4-Year visual external inspection, thickness, Heat Exchanger
4 SEX01-10Y 10Y 10- Year PT for weld, Heat Exchanger
References
1.
2.
Re Action by
Ser # Description Action-1 Action by Title Signature Date
v Names
Notes:
Exec. Dept. stationary Est. Duration Hrs. 3Hr. Permit to Work Cold
Interval (calendar/ Meter) calendar Stop (Y/N) N Plant/ Unit Shutdown (Y/N) N
Coordinate With inspection, Engineering Service
Rev # Document Name Approved by Title Approved by Name Signature Date Page
2 of 5
E/OHSP-11-F-??
Work Order #: Static Maintenance & Inspection Work Instructions
PM Code PM Name PM Description Rev Date
SEX01 HEAT EXCHANGER visual external inspection
Standard
Asset Type Asset Type Description Sub Type
Classification
SEX Stationary, HEAT EXCHANGER
Job Plan Code SEX01-1Y Description Annual external inspection, Heat Exchanger
E. Permits Forms:
It’s recommended to scan the forms and attach to the maximo work order
Permits Name Serial No.
1.
2.
3.
4.
5.
6.
F. Isolation Certificate Forms:
It’s recommended to scan the forms and attach to the maximo work order
Isolation Certificate Name Serial No.
1.
2.
Done
(2) Work Instructions Y/N
Comments
Check following procedures:
1. Heat Exchanger Inspection Procedure No 1002
2.
G. Extra Work
Report any extra work and explain in the Clarification the reason for this extra work
Extra Work Clarification
1
2
H. Mandatory Recommendation
Report mandatory recommendation for enhancement of this Job Plan or PM
Recommendation’s Clarification
1
2
(3) Failure
Use maximo Failures Codes (while feedback in maximo)
Failure Problem Cause Remedy Failed MESC Item
Rev # Document Name Approved by Title Approved by Name Signature Date Page
3 of 5
E/OHSP-11-F-??
Work Order #: Static Maintenance & Inspection Work Instructions
PM Code PM Name PM Description Rev Date
SEX01 HEAT EXCHANGER visual external inspection
Standard
Asset Type Asset Type Description Sub Type
Classification
SEX Stationary, HEAT EXCHANGER
Job Plan Code SEX01-1Y Description Annual external inspection, Heat Exchanger
(4) Resources
A. Manpower
Planned Actual
Maximo Trade Position/Title No. of Duration Employee
SN
Trade Code Description Persons Hours Code Name Hours
1.
2.
B. Tools
Only hold by other party OR requires request, permit, certification OR calibration as:
Cranes, Ultrasonic Thickness Gauge, hydro Test Pump, etc.
Planned Actual
Maximo Tool Duration Duration
SN Tool Description Qty
Code Hours Hours
1.
2.
C. Spare Parts/ Materials
Also; define new items (items without MESC) by item description or part number
Planned Actual
MESC Stock Item Part
SN Item Description Qty Qty
Item Code Number
1.
2.
3.
4.
5.
6.
D. Services
Only provided through Contract or service order as: Inspection, Certification OR Renting Equipment, etc.
Planned Actual
Service code Service Description Service Order no.
Rev # Document Name Approved by Title Approved by Name Signature Date Page
4 of 5
E/OHSP-11-F-??
Work Order #: Static Maintenance & Inspection Work Instructions
PM Code PM Name PM Description Rev Date
SEX01 HEAT EXCHANGER visual external inspection
Standard
Asset Type Asset Type Description Sub Type
Classification
SEX Stationary, HEAT EXCHANGER
Job Plan Code SEX01-1Y Description Annual external inspection, Heat Exchanger
(6) Observations
Report Observations that requires action to the Maintenance Supervisor
Observation Required Action
1.
2.
Signature Signature
Signature Signature
Rev # Document Name Approved by Title Approved by Name Signature Date Page
5 of 5