1. AUDIT REQUIREMENTS
The self-audit (including all applicable job audits for the applicable slash
audit criteria first, and the balance to 10 jobs using AC7102) must be
completed prior to the audit in accordance with the requirements of OP
1105 – Audit Process and submitted through eAuditNet.
PRI operating procedures provide that "This report is published by PRI to advance the state of technical, engineering, and quality
sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent
infringement arising there from, is the sole responsibility of the user.”
PRI values your input. To provide feedback on this document, please contact the appropriate commodity staff engineer. (Contact
information is located at http://www.eauditnet.com under “Contact Us”.)
t-frm-1115 19-Mar-2021
Nadcap AC7102 Revision K -2-
1.1.2 Were all of the non-conformances identified by the Auditee's self-audit YES NO NA
addressed by their corrective action system prior to this Nadcap audit?
1.1.3 The Auditee must provide the following documents to the Auditor 30
days prior to the audit: (Info)
(All the above documents must be uploaded into the temporary secure
storage location of eAuditNet).
1.2.1 For definitions and interpretations see Heat Treating Task Group Audit
Handbook.
1.3.1 In addition to the commodity audit criteria noted herein, there may be
other pertinent data such as audit handbooks, attachments, and
preparatory instructions necessary for the completion of the audit.
These can be found and downloaded from eAuditNet under “Public
Documents”.
1.3.2 Questions marked with (UXX) Codes are applicable to all Auditees.
These Codes indicate that corresponding questions from AC7102/S are
also to be answered "as applicable."
2. AUDITEE INFORMATION
COMMENTS:
Guidance: Ensure that the scope has been reviewed and signed off in
eAuditNet with the Auditee.
2.2 Attachments
3.1.1 Are the applicable revisions of the appropriate documents available at YES NO
the appropriate workstation?
3.2.1 Are contracts and incoming purchase orders reviewed to ensure that:
(U22)
3.2.1.1 The quality and technical requirements, including any unique customer YES NO
requirements, are adequately defined and documented?
3.2.1.2 Adequate capability, customer approvals, and resources are in place to YES NO
meet the requirements?
3.2.1.3 Any deviations from the proposal/contract are resolved in writing by YES NO
authorized personnel/customer/Auditee?
3.2.1.4 There is adequate definition of the work statement to identify the YES NO NA
specific process(es) to be performed including specification number(s),
applicable Type(s), Class(es), Grade(s), etc.?
3.2.2 Does the Auditee flow down contractual requirements internally and to YES NO
sub-tier providers?
3.3.1 Is the nonconforming material controlled, and the customer notified of YES NO
each instance of nonconforming product in accordance with the
contractual requirements?
3.4.1 Are split orders controlled in accordance with the customer YES NO
requirement?
3.4.2 Is there objective evidence that split orders are tested in accordance YES NO
with the customer requirement?
3.5.1 Are planned and documented internal quality audits performed on a YES NO
scheduled basis by knowledgeable personnel not directly responsible
for the work?
3.5.2 Are all Nadcap elements within the scope of the Auditee’s accreditation YES NO
properly addressed in the internal audit?
3.6 Quality Planning – These requirements must be checked through all job
audits performed.
3.6.1 Is the facility performing heat treatment subject to approval by the YES NO NA
relevant cognizant organization associated with the design authority
before commencing the work, when required?
3.6.2 Is only the heat treating equipment which meets the requirements of YES NO
the applicable specifications for instrumentation and temperature
uniformity used for processing? (U14, U22)
3.6.3 Are specified process times based on the appropriate thickness of the YES NO
hardware or other criteria in accordance with the applicable
specification?
3.6.4 Are tensile specimens and other test specimens included with YES NO NA
production loads when required? (U22)
3.6.5 Are there procedures that address the use and placement of load YES NO NA
thermocouples when required by specification or customer
requirements? (U14)
3.7.1 When customer approved fixed processes are required, is the Auditee YES NO
working to the latest revision approved by the customer and is the
evidence of this approval on file? (U22)
3.7.2 Does an internal procedure address the requirements for fixed YES NO
processes?
3.7.3 Does any violation of a fixed process requirement lead to review of YES NO
concerned product and customer notification?
3.8.1 Is engineering first lot inspection and approval documented when YES NO
required by the customer?
3.8.2 Are records maintained for the development of fixturing and racking YES NO
sketches, for first article inspection when required by specification or
customer requirements?
3.9 Purchasing
Nadcap AC7102 Revision K -6-
3.9.1 Are all facilities used for subcontracted testing and processing YES NO NA
approved by either the customer or Subscriber, as required?
3.10.2 Is there evidence that software used to control and record Heat YES NO
Treatment equipment (programmable controller, electronic charts, etc.),
is compliant with approved procedure?
3.10.3 Are all software revisions verified by first lot inspection to ensure YES NO
compliance with specification requirements?
4. PERSONNEL
4.1 Training
4.1.1 Are there training procedures that assure personnel performing YES NO
contract review, job planning, heat treating, and associated quality and
test functions are competent to perform assigned tasks?
4.2.2 Do records indicate that the evaluations are performed at documented YES NO
frequencies and the results reviewed with employees in a program of
continuous improvement of personnel?
5.1.1 Are identification, count and quality discrepancies resolved prior to YES NO
processing hardware?
5.2.2 Does the job planning have provisions for inspection prior to heat YES NO
treatment when inspection or conditional cleaning is specified in the
applicable specification?
5.2.3 Does the Auditee have a procedure that addresses the cleaning or YES NO
cleanliness inspection of hardware in accordance with the applicable
specification requirements? (U18, U22)
5.2.4 Are procedures in place to provide removal of salt residue from YES NO NA
hardware heated in salt baths?
5.2.5 Do records and observations indicate that the contract review for these YES NO
requirements is effective and the procedure is followed?
5.3.5 Do procedures specify that racks, fixtures and/or baskets must be free YES NO NA
from entrapped quenchant before being loaded into the furnace?
5.3.6 Do procedures require that the racks/fixtures/baskets are examined for YES NO
integrity, and repaired or scrapped as necessary?
5.4.1 Are there internal procedures, racking sketches, or other means to YES NO
ensure that spacing between hardware is adequate for circulation of the
heating medium and coolant/quenchant?
5.4.2 Are there internal procedures to preclude loading furnaces with YES NO NA
hardware when the furnace of intended use is hotter than the set
temperature for the process?
Nadcap AC7102 Revision K -8-
5.4.3 Do records indicate that the procedures are followed and meet YES NO
industry/customer and specification requirements?
5.5.1.1 A method to determine the quantity of product to check in the lot? YES NO
5.5.2 Are sampling plans approved by the customer, when required? YES NO NA
5.5.3 Is there documented training in the use of the sampling plan which YES NO
includes sample size and selection, reduced and tightened plans, and
when to implement them?
5.5.4 Does a sampling of jobs where sample inspection is permitted indicate YES NO
that customer requirements have been flowed down correctly to the
inspector or delegated operator and are met?
5.6.1 Is each heat treatment cycle reviewed for job traceability, correct YES NO
temperature, time at temperature and all other related parameters?
(U7, U11, U14, U22)
5.6.3.1 Does the data manually recorded match the actual data recorded on YES NO NA
the chart recorder?
5.6.5 Are the acceptance status and any test data recorded only after the YES NO
operation for that job has been completed?
Nadcap AC7102 Revision K -9-
6.1 Does the Auditee have procedures or other documentation in place that YES NO
addresses all required Heat Treat process control testing? (See Heat
Treating Audit Handbook)
6.2.1 All applicable specifications when testing is specified? (See section 3.2) YES NO NA
6.2.2 All qualification, periodic, and lot/batch acceptance testing as required YES NO
by specifications?
6.2.4 Documentation that tests were performed per the schedule? YES NO
(INFO) For information only, does the Auditee perform in-house YES NO
hardness testing?
6.4.1 The following questions apply when the Auditee is accredited by SECTION NA
Nadcap Materials Testing Laboratories Task Group to AC7101/5:
6.4.1.2 Is the equipment, base and support designed such that no rocking or YES NO
lateral movement occurs while load is being applied or removed?
6.4.1.4 Is there objective evidence that the maintenance plan is followed? YES NO
6.4.1.8 Is the number of indentations on standard blocks relatively the same or YES NO
more than those reported for periodic verifications?
6.4.1.9 Are alternative methods used only when permitted by one of the YES NO NA
following? (Check all that apply)
6.4.1.9.2 Customer
6.4.1.10 If portable hardness testers are used, is the use of portable hardness YES NO NA
testers approved by the customers?
6.4.1.11 Do test reports show the hardness values and appropriate scale per YES NO NA
customer requirements?
6.4.1.12 If conditions are other than normal operating conditions (ball YES NO NA
diameter/load/load time/etc.), are those conditions reported as
required?
6.4.1.14 Is test temperature reported if ambient temperature was outside of 10° - YES NO NA
35°C (50° - 95°F) (unless it has been shown not to affect the
measurement result)?
6.4.2 (INFO) For information only, does the Auditee perform in-house YES NO
conductivity testing?
Nadcap AC7102 Revision K - 11 -
6.5 Metallography/Microhardness
6.5.1 (INFO) For information only, does the Auditee perform in-house YES NO
metallography and microhardness testing? (U18)
6.5.2 The following questions apply when AC7101/4 is executed as part of SECTION NA
this audit:
6.5.2.1 Does the Auditee have a system of statistical metrics (Round Robin) in YES NO NA
place that demonstrates proficiency in Metallography/Microhardness
across the machines and test personnel employed, and is conducted at
an interval not to exceed every two years?
6.5.2.2 Is there objective evidence that the Round Robin plan is followed? YES NO NA
6.6.1 (INFO) For information only, does the Auditee perform in-house YES NO
mechanical testing? (U11)
6.6.2 The following questions apply when AC7101/3 is executed as part of SECTION NA
this audit:
Nadcap AC7102 Revision K - 12 -
6.6.2.1 Does the Auditee have a system of statistical metrics (Round Robin) in YES NO
place that demonstrates proficiency in Mechanical Testing across the
machines and test personnel employed, and is conducted at an interval
not to exceed every two years?
6.6.2.2 Is there objective evidence that the Round Robin plan is followed? YES NO
6.7.1 (INFO) For information only, does the Auditee prepare the specimens YES NO
for the mechanical testing?
7.1.1.1 Are the current operating manuals or instructions available to furnace YES NO
operators, maintenance personnel and other personnel requiring the
information? (U25)
7.1.2.1 Does the internal procedure specify the method for determining heat-up YES NO
rate, start of soaking time, end of soaking time and cooling rate? (U14)
7.1.2.2 Do records on the furnace chart or furnace log indicate compliance to YES NO
the above procedure and customer requirements?
7.2 Maintenance
7.2.1 Are all components of each furnace that can affect the functionality YES NO
inspected and maintained in accordance with a documented
preventative maintenance schedule? (U3)
7.2.2 Do records indicate that the inspection and maintenance have been YES NO
performed in accordance with the schedule?
7.3.1 Does the internal procedure specify how atmospheres are to be YES NO
controlled and monitored to ensure conformance to the requirements?
7.4.1 Are the flow meters operational and appropriate for the gas and flow YES NO
rates used?
7.4.2 Do the inspection and maintenance schedule include periodic checks of YES NO
flow meters to ensure that they are functioning?
7.4.3 Does the internal procedure address the safety shut-off valves and the YES NO
emergency gas purges?
7.5.1 When the atmosphere is changed, is the furnace purged in accordance YES NO
with an internal procedure that assures elimination of the effects of
previous atmosphere?
7.6.1 Are the quench mechanisms operational and capable of meeting YES NO
maximum quench delay provisions of the specifications? (U14)
7.7.1 Does the internal procedure specify that quenchant temperatures are to YES NO
be controlled and documented?
7.8.1 Is there a system in place that ensures polymer quenching is only used YES NO
when permitted by the particular specification for the alloy and metal
thickness?
7.8.2 Do procedures define the polymer concentration in accordance with the YES NO
requirements?
7.8.4 Do procedures specify the frequency and methods for determining the YES NO
polymer concentration in accordance with the requirements?
7.9 Water/Polymer Quenchant used in conjunction with the Salt Baths SECTION NA
7.9.1 Do the records show that the contamination does not exceed 6% YES NO
Nadcap AC7102 Revision K - 14 -
7.10.1 Do procedures specify the frequency and methods for the testing of YES NO
quenchants in accordance with all customer requirements?
7.10.2 Do the records indicate that quenchant effectiveness meets the YES NO
specifications’ requirements?
7.10.3 If the quench media differs from the requirements of the applicable YES NO NA
specifications, is there a qualification test in place that substantiates its
equivalence?
7.10.3.1 Has the use of different quenchants and related qualification tests been YES NO NA
approved by the customer, when required?
7.10.4 Does the Auditee have procedures that address qualification and re- YES NO
qualification requirements to industry and/or customer specifications?
7.10.4.1 Is there objective evidence of compliance with these qualification and YES NO
re-qualification requirements?
7.11.1 Is there a system in place to ensure that the fasteners are only YES NO
processed in qualified containers to approved procedures and
customer requirements, or, when qualified, in a continuous furnace?
7.12.1.5 The specified plate thickness and method(s) of its measurement? YES NO
7.12.2.1 Are the fixtures, racks and masking materials defined and identified? YES NO
7.12.2.2 Do fixtures and masking prevent the entrapment of air or process YES NO
solutions, and protect hardware from corrosion and unwanted
coverage?
7.12.2.3 Does the fixturing and racking facilitate solution neutralization and YES NO
removal during rinsing, and minimize solution and rinse water drag-out
and cross contamination of process tanks?
7.12.2.4 Do the fixturing, racking, electric circuit design and lifting equipment YES NO
preclude mechanical damage or electrical arcing?
7.12.3.1 Are processing tanks identifiable for their contents and specified YES NO
temperature ranges?
7.12.3.2 Are the tanks with specified temperature ranges operating within those YES NO
ranges at the time of processing?
7.12.3.3 Are tanks of sufficient volume and dimensions to contain hardware YES NO
during processing and assure sufficient coverage of hardware?
7.12.3.4 Are tanks that require uniform temperature and solution concentration YES NO
agitated?
7.12.3.5 Are tanks for electrolytic coatings equipped and configured to promote YES NO
the required uniform deposition rate?
7.12.4 Are anodes controlled and specific to each process solution to avoid YES NO
cross contamination?
7.12.5 Are equipment and solutions in compliance with applicable customer YES NO
requirements?
7.12.6 Do the records show that the specified thickness of plate is achieved? YES NO
7.12.7.1 Are the methods and materials for removal of plating as specified or YES NO
approved by the customer?
8.1.1.1 Are the furnaces used for solution heat treating, annealing or stress YES NO NA
relieving designed and operated such that products of combustion that
could contaminate the load do not enter the heat-treating furnaces
when required by specification?
8.1.1.2 When required, is there a procedure that includes the use of protective YES NO NA
compounds (ammonium or sodium fluoroborate, or other equivalent
moisture reducing compound)?
8.1.1.3 Are there records indicating that the procedure is followed? YES NO NA
8.1.2 When specified, are all periodic metallographic tests in compliance with YES NO NA
requirements?
8.2.1 Is the grade of salt compliant with applicable material and heat treating YES NO NA
process specification requirements?
8.2.2 Do the records indicate that each salt bath is tested periodically for pH YES NO NA
in accordance with the applicable heat treating specification?
8.3.2 Are there records to show that cooling after quench is in compliance YES NO
with customer requirements specified in procedures or shop planning?
8.3.3 Do procedures specify the requirements for time/temperature limits for YES NO
retention of the “as quenched” condition?
8.3.5 Do the records indicate that the procedures are followed? YES NO
8.4 Solution heat treating furnaces with the heat source in walls SECTION NA
8.4.1 Are radiant tubes and/or electric heating elements shielded or YES NO
positioned to prevent the radiation heating of hardware?
8.4.2 Are the radiation tests made in accordance with AMS2750 prior to initial YES NO
production use and after any repair or adjustments that might alter
radiation characteristics?
Nadcap AC7102 Revision K - 17 -
9.1 Facilities/Equipment
9.1.1 Are electrical heating elements and radiant tubes shielded to prevent YES NO NA
direct radiation from striking any production hardware?
9.1.2 When heat treating above 750°F (399°C), is there a protective YES NO NA
atmosphere containing sufficient sulfur dioxide, carbon dioxide, or
satisfactory oxidation inhibitor used to prevent oxidation?
9.1.3 Does the soaking time start when all temperature control sensing YES NO
elements are within uniformity range of the set or offset temperature?
9.1.4 Is the quench delay 30 seconds or less (except otherwise approved by YES NO
the cognizant quality assurance organization associated with the
design authority)?
9.1.5 Is the quenchant agitated during the quench (except otherwise YES NO
approved by the cognizant quality assurance organization associated
with the design authority)?
9.2 When specified, are all periodic metallographic tests in compliance with YES NO NA
requirements?
10.1 Facilities/Equipment
10.1.1 If fuel-fired furnaces are available for use in the facility, are there YES NO NA
procedures in place to assure that fuel-fired furnaces are of the muffled
type if used for solution heat treating of Cu-Be alloys in an air
atmosphere?
10.1.2 If still air oven type furnaces are available for use in the facility are YES NO NA
there procedures in place that preclude their use for age hardening of
Cu-Be alloys?
10.1.3 When specified for bright luster hardware, are there procedures in YES NO NA
place to either provide subsequent brightening operations to remove
oxides, stains and tarnishes that are not detrimental to the finished
hardware or to conduct a ‘bright hardening’ heat treatment utilizing non-
oxidizing and non-combustible atmosphere in a chamber-type furnace?
10.1.4 Are bright hardening procedures in place that require the control of YES NO NA
atmosphere flow rate and dew point as needed to provide the required
finish?
10.2.1 If salt bath furnaces are available for use in the facility, are there YES NO
procedures in place that preclude their use for the solution heat treating
of Cu-Be alloys?
10.2.2 Are procedures in place requiring that the salt bath be inspected at YES NO
least once each month to determine the presence of objectionable
contaminants which attack the material and that replenishment or
replacement of the entire bath is made, as required?
10.2.3 Are procedures in place and appropriate equipment provided to assure YES NO
removal of all salt from hardware and with sufficient inflow of fresh
water to prevent concentration of dissolved salts in the rinse?
10.2.4 When required, are neutralizing baths provided to remove all active salt YES NO NA
residues from hardware?
11.1 Facilities/Equipment
11.1.1 Does an internal procedure specify when an atmosphere (including air YES NO
or vacuum) has to be used in accordance with any applicable
specifications?
11.1.2 When applicable, does an internal procedure forbid the use of salt YES NO NA
baths and exothermic atmosphere except otherwise stated by the
cognizant quality assurance organization associated with the design
authority for non-age hardening alloys?
11.1.3.1 When load thermocouples are not used, were tests performed in order YES NO NA
to establish the heat-up time for the load?
11.1.4 When required by any applicable specification, for continuous furnaces, YES NO NA
is TUS test performed with a representative production load conditions
(weight and traverse speed) and instrumented by load sensors?
11.1.5 When applicable, do leak rate results meet 20 microns per hour, or YES NO NA
other criteria required by any applicable specification?
11.2.1 Does the internal testing procedure conform to the specifications? YES NO
12.1 Facilities/Equipment
12.1.1 Does the internal procedure require protection of hardware from YES NO NA
corrosion during processing and storage?
12.1.3 Is there a procedure that assures reactive atmospheres are properly YES NO NA
purged prior to heating hardware when prior atmosphere can have a
deleterious effect on hardware to be processed?
12.2.1 Does the internal procedure require that all PH steel hardware with any YES NO
finish machined surfaces be handled with clean gloves after cleaning?
(U11)
12.2.2 Do records and observations indicate that the procedure is followed? YES NO
12.3.1 Is each salt bath tested periodically in accordance with the applicable YES NO
heat treatment specifications?
12.3.2 Do the salt bath test results demonstrate conformance to carburization, YES NO
decarburization, nitriding, and intergranular attack requirements?
Nadcap AC7102 Revision K - 20 -
12.3.5 Do procedures require that the quench bath be monitored weekly? YES NO
12.3.5.1 Do procedures require salt concentration in the bath to be less than or YES NO
equal to 2% for a water quench or less than or equal to 6% for polymer
quench?
12.3.6 Do procedures require that hardware be cleaned of any residual salt YES NO
after quenching?
12.4.2 Do procedures and job planning specify time/temperature limits for sub- YES NO
ambient/sub-zero treatments?
12.5.2 Do records indicate that the maintenance and calibrations are YES NO
performed as required by the procedures and applicable specifications?
12.5.3 Is the accuracy of the carbon control system confirmed by the results of YES NO
tests required by the heat treatment specifications?
12.6.1 Are there procedures that address snap tempering within the time limits YES NO
required by the customers’ specifications? (U11)
12.7.1 Are the expander pressure, the cylinder pressure, and the number and YES NO
force of hold down springs, and applicable tolerances documented on
or traceable to the traveler for each job?
12.8.1 Are there procedures that address mechanical testing required by the YES NO
customers’ specifications?
Nadcap AC7102 Revision K - 21 -
12.9.3 Is there a system in place to ensure that decarburization tests are YES NO NA
performed at the proper frequency, whether it is periodic or with the
load? (U11)
13.1 Facilities/Equipment
13.1.1 Do procedures address the use of getter materials when required by YES NO NA
specifications?
13.1.2 When getter materials are used, do procedures address the lifespan or YES NO NA
checks to assure that the getter material is still absorbing
contaminants?
13.1.4 Do records and observations indicate that the procedure is followed? YES NO NA
13.2.1 Does the internal procedure for cleaning titanium surfaces preclude the YES NO
use of halogenated substances or other prohibited materials?
13.2.2 Does the internal procedure require that all titanium hardware cleaned YES NO NA
either by the Auditee or the customer prior to heat treatment are
handled with clean gloves after cleaning?
13.2.3 Do records and observations indicate that the procedure is followed? YES NO
13.3 Processing
13.3.1 Do procedures preclude the use of fixturing that may contaminate YES NO NA
Nadcap AC7102 Revision K - 22 -
13.3.2 Do procedures limit the use of air atmosphere above 1000°F (538°C), YES NO NA
unless there is subsequent sufficient stock removal, or allowed by
specification?
13.3.4 Does the inert atmosphere or quench gas used (when processing in a YES NO NA
vacuum furnace) meet the required purity requirements?
13.4.1 Is there a system in place to control the test coupons and their use YES NO NA
when required?
13.4.2 Does the internal documentation support that the test coupons are YES NO
used in accordance with the procedures/specifications?
13.4.3 Is there a system in place and adequate procedures for the control of YES NO NA
hydrogen pick up that meets the method and frequency specified by the
customers’ requirements?
13.4.4 Is there a procedure for periodic testing for alpha case determination in YES NO
heat treatment of titanium alloys?
14.1 The Auditor shall execute Nadcap AC7102/8 Audit Criteria as part of
this audit.
15.1 Procedures
15.1.1 Does the internal procedure or other documentation specify cleaning of YES NO
hardware, tooling and baskets by methods and with materials that
ensure freedom from contamination during vacuum heat treating?
15.2.1.2 Calibration of vacuum instruments, flowmeters, dew point meter(s) and YES NO
the related master gauges as appropriate? (U7, U10, U14)
15.2.1.3 Quench, partial pressure and backfill gas purity and/or dew point (i.e., YES NO
does the gas certification meet specification requirements)?
15.2.2 Is the dew point of the gas periodically checked as the gas enters the YES NO
furnace?
15.2.3 Does the calibration interval of the vacuum system’s sensor, control YES NO
panel and recorder meet the frequency of the customer specification?
15.2.4 Are calibration acceptance criteria defined in the internal procedure? YES NO
15.2.5 Do records indicate that the tests and calibrations are performed as YES NO
required by the internal procedure and all applicable specifications?
(U25)
15.2.6 Is the vacuum level in the heating and cooling chambers recorded YES NO
during all thermal cycles requiring vacuum? (U10, U14)
15.3.1 Does the Auditee have documentation of customer or cognizant quality YES NO NA
assurance organization associated with the design authority approval,
as applicable, when required?
15.3.2 Does the Auditee have procedures that address the applicable YES NO
qualification and requalification requirements that meet industry or
customer specifications?
15.3.3 Does the Auditee’s technique sheet meet the requirements of the YES NO
applicable industry or customer specifications?
The Auditor shall execute two (2) completed long job audits (including
final testing), except when completed job audit is replaced by an equal
amount of other processing jobs (see AC7102/1, AC7102/3, AC7102/4,
AC7102/6, AC7102/7 and AC7102/9) performed in conjunction with
AC7102 Audit Criteria.
Nadcap AC7102 Revision K - 24 -
16.1.2 Customer:
16.1.3 Subscriber:
16.1.4.2 If the job is a split job, were all required tests performed for each split YES NO NA
job?
16.1.5.1 (Info) Is the hardware controlled under U.S. Export Control Regulation YES NO
as declared by the Auditee?
16.1.14 (EC) Heat treat and other process and test requirements specified by
customer specification (e.g. fixed process approval):
16.1.17 When the heat treating specification has cleaning requirements prior to YES NO NA
or after heat treatment, are they properly flowed to the job planning
including the cleaning specification?
16.2 Does the job planning contain all of the applicable items described
below?
16.2.1 Specification required parameters for the complete heat treatment cycle YES NO
listed on the specific job planning for the Part Number, or is referenced
in a controlled system traceable to the Part Number?
16.2.2 YES NO
Soak times and tolerances?
16.2.7 Test samples (Type and Quantity) identification (as applicable)? YES NO NA
16.2.8 Any changes, additions, and deletions are made by authorized YES NO
personnel?
16.3.4 Did racking ensure that air is not entrapped detrimentally during the YES NO NA
quench?
Check if used
(EC)
Control
Recorder (EC)
High/Low - Type (EC)
A or C
Instrumentation
Load (EC)
Thermocouples
16.4.5 Was the furnace kept at or below set temperature (including the room YES NO NA
temperature for vacuum furnaces) before loading the hardware?
Describe: (EC) Do not describe but answer YES or NO
16.4.6 What is the basis for determining the start and the end of the soak?
Describe:
16.4.7 Does the method for determining the start and the end of soak meet the YES NO
customer requirements?
16.6.3 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
16.6.5 Does all thermal treatment meet the specified requirements? YES NO
16.6.6 Is there evidence that heat treatment cycles are reviewed for job YES NO
traceability, correct temperature and time at temperature?
16.6.7 Was this review performed by QA or other designated personnel and YES NO
the review documented in accordance with the customer requirements?
(U11)
16.7.2.1 What is the basis for determining the tempering temperature for alloy
steels?
Check if used
Control (EC)
Recorder (EC)
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
Check if used
Control (EC)
Recorder (EC)
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
16.9.3 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
16.9.5 Does all thermal treatment meet the specified requirements? YES NO
16.9.6 Is there evidence that the heat treatment cycles are reviewed for job YES NO
traceability, correct temperature and time at temperature?
Nadcap AC7102 Revision K - 31 -
16.9.7 Was this review performed by QA or other designated personnel and YES NO
the review documented in accordance with the customer requirements?
(U11)
16.11.1 Are the load thermocouples required for this job either by the customer YES NO
or internal procedure?
16.11.2 Did the usage and placement of load thermocouples conform to YES NO
requirements?
Nadcap AC7102 Revision K - 32 -
16.12.1.1 Straightening:
16.15 Additional Periodic and Lot testing required: (Charpy impact, Tensile SECTION NA
test, Fracture toughness, Metallographic and/or Microhardness tests,
etc.)
16.15.3 Are these tests properly documented in the Auditee’s Process Control YES NO
System?
16.16.1.1 Does the certificate show compliance to all applicable drawing, YES NO
specification and PO requirements including documentation of any
exceptions (e.g. pre- and post-cleaning, straightening, testing, etc.)?
16.16.1.2 Does the certificate list the revision level of the specification to which YES NO
hardware was processed?
16.17 Did this job comply with all other requirements? YES NO
Nadcap AC7102 Revision K - 34 -
17.1.2 Customer:
17.1.3 Subscriber:
17.1.4.2 If the job is a split job, were all required tests performed for each split YES NO NA
job?
17.1.5.1 (Info) Is the hardware controlled under U.S. Export Control Regulation YES NO
as declared by the Auditee?
17.1.14 (EC) Heat treat and other process and test requirements specified by
customer specification (e.g. fixed process approval):
17.1.17 When the heat treat specification has cleaning requirements prior to or YES NO NA
after heat treatment, are they properly flowed to the job planning
including the cleaning specification?
17.2 Does the job planning contain all of the applicable items described
below?
17.2.1 Specification required parameters for the complete heat treatment cycle YES NO
listed on the specific job planning for the Part Number, or is referenced
in a controlled system traceable to the Part Number?
17.2.7 Test samples (Type and Quantity) identification (as applicable)? YES NO NA
17.2.8 Any changes, additions, and deletions are made by authorized YES NO
personnel?
17.3.4 Did racking ensure that air is not entrapped detrimentally during the YES NO NA
quench?
Check if used
Control (EC)
Recorder (EC)
17.4.5 Was the furnace kept at or below set temperature (including the room YES NO NA
temperature for vacuum furnaces) before loading the hardware?
Describe: (EC) Do not describe but answer YES or NO
17.4.6 What is the basis for determining the start and the end of the soak?
Describe:
17.4.7 Does the method for determining the start and the end of soak meet the YES NO
customer requirements?
17.6.3 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
17.6.5 Does all thermal treatment meet the specified requirements? YES NO
17.6.6 Is there evidence that heat treatment cycles are reviewed for job YES NO
traceability, correct temperature and time at temperature?
17.6.7 Was this review performed by QA or other designated personnel and the YES NO
review documented in accordance with the customer requirements?
(U11)
17.7.2.1 What is the basis for determining the tempering temperature for alloy
steels?
Check if used
(EC)
Control
Recorder (EC)
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
17.9.3 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
17.9.5 Does all thermal treatment meet the specified requirements? YES NO
17.9.6 Is there evidence that the heat treatment cycles are reviewed for job YES NO
traceability, correct temperature and time at temperature?
17.9.7 Was this review performed by QA or other designated personnel and YES NO
the review documented in accordance with the customer requirements?
(U11)
17.11.1 Are the load thermocouples required for this job either by the customer YES NO
or internal procedure?
17.11.2 Did the usage and placement of load thermocouples conform to YES NO
requirements?
17.12.1.1 Straightening:
17.15 Additional Periodic and Lot testing required: (Charpy impact, Tensile SECTION NA
test, Fracture toughness, Metallographic and/or Microhardness tests,
etc.)
17.15.3 Are these tests properly documented in the Auditee’s Process Control YES NO
System?
17.16.1.1 Does the certificate show compliance to all applicable drawing, YES NO
specification and PO requirements including documentation of any
exceptions (e.g. pre- and post-cleaning, straightening, testing, etc.)?
17.16.1.2 Does the certificate list the revision level of the specification to which YES NO
the hardware was processed?
17.17 Did this job comply with all other requirements? YES NO
Nadcap AC7102 Revision K - 45 -
The Auditor shall execute eight (8) abbreviated in-process job audits for
a single lot of in-process components, except when the abbreviated in-
process heat treating jobs are replaced by an equal amount of other
processing jobs predicated on the declared scope of the audit (see
AC7102/1, AC7102/3, AC7101/4, AC7102/6, AC7102/7 and AC7102/9)
performed in conjunction with AC7102 Audit Criteria.
18.1.2 Customer:
18.1.3 Subscriber:
18.1.4.2 If the job is a split job, were all required tests performed for each split YES NO NA
job?
18.1.5.1 (Info) Is the hardware controlled under U.S. Export Control Regulation YES NO
as declared by the Auditee?
18.1.14 (EC) Heat treat and other process and test requirements specified by
customer specification (e.g. fixed process approval) - See sections 3.2,
3.7 and 6:
Nadcap AC7102 Revision K - 47 -
18.1.18 When the heat treat specification has cleaning requirements prior to or YES NO NA
after heat treatment, are they properly flowed to the job planning
including the cleaning specification?
18.2 Does the job planning contain all of the applicable items described
below?
18.2.1 Specification required parameters for the complete heat treatment cycle YES NO
listed on the specific job planning for the Part Number, or is referenced
in a controlled system traceable to the Part Number?
18.2.7 Test samples (Type and Quantity) identification (as applicable)? YES NO NA
18.2.8 Any changes, additions, and deletions are made by authorized YES NO
personnel?
18.3.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
18.3.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?
18.4.1.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
18.4.1.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
18.4.2.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
18.4.2.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
18.6.1 Is the operation signed off or data recorded only after completion? YES NO
19.1.2 Customer:
19.1.3 Subscriber:
19.1.4.2 If the job is a split job, were all required tests performed for each split YES NO NA
job?
19.1.5.1 (Info) Is the hardware controlled under U.S. Export Control Regulation YES NO
as declared by the Auditee?
19.1.14 (EC) Heat treat and other process and test requirements specified by
customer specification (e.g. fixed process approval) - See sections 3.2,
3.7 and 6:
19.1.18 When the heat treat specification has cleaning requirements prior to or YES NO NA
after heat treatment, are they properly flowed to the job planning
including the cleaning specification?
19.2 Does the job planning contain all of the applicable items described
below?
19.2.1 Specification required parameters for the complete heat treatment cycle YES NO
listed on the specific job planning for the Part Number, or is referenced
in a controlled system traceable to the Part Number?
19.2.7 Test samples (Type and Quantity) identification (as applicable)? YES NO NA
Nadcap AC7102 Revision K - 55 -
19.2.8 Any changes, additions, and deletions are made by authorized YES NO
personnel?
19.3.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
19.3.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
19.4.1.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
19.4.1.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
Nadcap AC7102 Revision K - 57 -
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
19.4.2.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
Nadcap AC7102 Revision K - 58 -
19.4.2.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
19.6.1 Is the operation signed off or data recorded only after completion? YES NO
20.1.2 Customer:
20.1.3 Subscriber:
20.1.4.2 If the job is a split job, were all required tests performed for each split YES NO NA
job?
20.1.5.1 (Info) Is the hardware controlled under U.S. Export Control Regulation YES NO
as declared by the Auditee?
20.1.14 (EC) Heat treat and other process and test requirements specified by
customer specification (e.g. fixed process approval) - See sections 3.2,
3.7 and 6:
20.1.18 When the heat treat specification has cleaning requirements prior to or YES NO NA
after heat treatment, are they properly flowed to the job planning
including the cleaning specification?
20.2 Does the job planning contain all of the applicable items described
below?
20.2.1 Specification required parameters for the complete heat treatment cycle YES NO
listed on the specific job planning for the Part Number, or is referenced
in a controlled system traceable to the Part Number?
20.2.7 Test samples (Type and Quantity) identification (as applicable)? YES NO NA
Nadcap AC7102 Revision K - 62 -
20.2.8 Any changes, additions, and deletions are made by authorized YES NO
personnel?
20.3.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
20.3.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
20.4.1.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
20.4.1.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
Nadcap AC7102 Revision K - 64 -
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
20.4.2.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
Nadcap AC7102 Revision K - 65 -
20.4.2.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
20.6.1 Is the operation signed off or data recorded only after completion? YES NO
21.1.2 Customer:
21.1.3 Subscriber:
21.1.4.2 If the job is a split job, were all required tests performed for each split YES NO NA
job?
21.1.5.1 (Info) Is the hardware controlled under U.S. Export Control Regulation YES NO
as declared by the Auditee?
21.1.14 (EC) Heat treat and other process and test requirements specified by
customer specification (e.g. fixed process approval) - See sections 3.2,
3.7 and 6:
21.1.18 When the heat treat specification has cleaning requirements prior to or YES NO NA
after heat treatment, are they properly flowed to the job planning
including the cleaning specification?
21.2 Does the job planning contain all of the applicable items described
below?
21.2.1 Specification required parameters for the complete heat treatment cycle YES NO
listed on the specific job planning for the Part Number, or is referenced
in a controlled system traceable to the Part Number?
21.2.7 Test samples (Type and Quantity) identification (as applicable)? YES NO NA
Nadcap AC7102 Revision K - 69 -
21.2.8 Any changes, additions, and deletions are made by authorized YES NO
personnel?
21.3.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
21.3.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
21.4.1.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
21.4.1.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
Nadcap AC7102 Revision K - 71 -
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
21.4.2.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
21.4.2.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
21.6.1 Is the operation signed off or data recorded only after completion? YES NO
22.1.2 Customer:
22.1.3 Subscriber:
22.1.4.2 If the job is a split job, were all required tests performed for each split YES NO NA
job?
22.1.5.1 (Info) Is the hardware controlled under U.S. Export Control Regulation YES NO
as declared by the Auditee?
22.1.14 (EC) Heat treat and other process and test requirements specified by
customer specification (e.g. fixed process approval) - See sections 3.2,
3.7 and 6:
22.1.18 When the heat treat specification has cleaning requirements prior to or YES NO NA
after heat treatment, are they properly flowed to the job planning
including the cleaning specification?
22.2 Does the job planning contain all of the applicable items described
below?
22.2.1 Specification required parameters for the complete heat treatment cycle YES NO
listed on the specific job planning for the Part Number, or is referenced
in a controlled system traceable to the Part Number?
22.2.7 Test samples (Type and Quantity) identification (as applicable)? YES NO NA
Nadcap AC7102 Revision K - 76 -
22.2.8 Any changes, additions, and deletions are made by authorized YES NO
personnel?
processed:
22.3.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
22.3.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
22.4.1.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
22.4.1.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
22.4.2.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
Nadcap AC7102 Revision K - 79 -
22.4.2.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
22.6.1 Is the operation signed off or data recorded only after completion? YES NO
23.1.2 Customer:
23.1.3 Subscriber:
23.1.4.2 If the job is a split job, were all required tests performed for each split YES NO NA
job?
23.1.5.1 (Info) Is the hardware controlled under U.S. Export Control Regulation YES NO
as declared by the Auditee?
23.1.14 (EC) Heat treat and other process and test requirements specified by
customer specification (e.g. fixed process approval) - See sections 3.2,
3.7 and 6:
23.1.18 When the heat treat specification has cleaning requirements prior to or YES NO NA
after heat treatment, are they properly flowed to the job planning
including the cleaning specification?
23.2 Does the job planning contain all of the applicable items described
below?
23.2.1 Specification required parameters for the complete heat treatment cycle YES NO
listed on the specific job planning for the Part Number, or is referenced
in a controlled system traceable to the Part Number?
23.2.7 Test samples (Type and Quantity) identification (as applicable)? YES NO NA
Nadcap AC7102 Revision K - 83 -
23.2.8 Any changes, additions, and deletions are made by authorized YES NO
personnel?
processed:
23.3.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
23.3.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
23.4.1.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
23.4.1.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
23.4.2.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
Nadcap AC7102 Revision K - 86 -
23.4.2.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
23.6.1 Is the operation signed off or data recorded only after completion? YES NO
24.1.2 Customer:
24.1.3 Subscriber:
24.1.4.2 If the job is a split job, were all required tests performed for each split YES NO NA
job?
24.1.5.1 (Info) Is the hardware controlled under U.S. Export Control Regulation YES NO
as declared by the Auditee?
24.1.14 (EC) Heat treat and other process and test requirements specified by
customer specification (e.g. fixed process approval) - See sections 3.2,
3.7 and 6:
24.1.18 When the heat treat specification has cleaning requirements prior to or YES NO NA
after heat treatment, are they properly flowed to the job planning
including the cleaning specification?
24.2 Does the job planning contain all of the applicable items described
below?
24.2.1 Specification required parameters for the complete heat treatment cycle YES NO
listed on the specific job planning for the Part Number, or is referenced
in a controlled system traceable to the Part Number?
24.2.7 Test samples (Type and Quantity) identification (as applicable)? YES NO NA
Nadcap AC7102 Revision K - 90 -
24.2.8 Any changes, additions, and deletions are made by authorized YES NO
personnel?
24.3.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
24.3.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
24.4.1.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
24.4.1.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?
Nadcap AC7102 Revision K - 92 -
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
24.4.2.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
24.4.2.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
Nadcap AC7102 Revision K - 93 -
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
24.6.1 Is the operation signed off or data recorded only after completion? YES NO
25.1.2 Customer:
25.1.3 Subscriber:
25.1.4.2 If the job is a split job, were all required tests performed for each split YES NO NA
job?
25.1.5.1 (Info) Is the hardware controlled under U.S. Export Control Regulation YES NO
as declared by the Auditee?
25.1.14 (EC) Heat treat and other process and test requirements specified by
customer specification (e.g. fixed process approval) - See sections 3.2,
3.7 and 6:
25.1.18 When the heat treat specification has cleaning requirements prior to or YES NO NA
after heat treatment, are they properly flowed to the job planning
including the cleaning specification?
25.2 Does the job planning contain all of the applicable items described
below?
25.2.1 Specification required parameters for the complete heat treatment cycle YES NO
listed on the specific job planning for the Part Number, or is referenced
in a controlled system traceable to the Part Number?
25.2.7 Test samples (Type and Quantity) identification (as applicable)? YES NO NA
25.2.8 Any changes, additions, and deletions are made by authorized YES NO
personnel?
25.3.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
25.3.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
25.4.1.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
25.4.1.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
25.4.2.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
Nadcap AC7102 Revision K - 100 -
25.4.2.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
25.6.1 Is the operation signed off or data recorded only after completion? YES NO