MINISTRY OF ELECTRICITY ENERGY

PUBLIC ELECTRICITY CORPORATION


MARIB GAS POWER GENERATION STATION
PLANNING DEPARTMENT
1- WORK REQUEST:
CM Request No. Requested Date CORRECTIVE
Requested By MAINTENANCEPERMIT TO WORK (CM)
System / Equipment

WR-90/20 13-August-2020 ARIF GAS HEATER#2

Details of Defects To weled the top cover of the stack for gas heater no 2

2- WORK PERMIT:
Urgency System/Equipment GT(s) Main Assistance
CM Permit No. Issued Date Prepared By Unit
Level Shutdown Shutdown Department Department
CM-MECH-49/20 13-August-2020 MORISY 12 0 yes NO MECH MECH

KKS 10EKD26

THIS TYEP OF WORK IS( HOT WORK) SO YO SHOULD TAKE CARE OF SAFTY --- 1- The primit should sign and open by safty dep. 2-
Planning Remareks
The work should carry out with presence of the safty team. 3- the safty equpment should be available

3- WORK CONDITIONS & SAFETY PRECAUTIONS: ‫ه‬ ‫أ‬ ‫تا‬ .... ‫ا‬ ‫ر‬ ‫و‬ ‫ا ا "! ا‬#‫ ھ‬% & ‫)( ان‬

Condition Type BC TC IC BC / TC Certificate No. (If Applicable)


Engineer Requirements
De-Energized Earthing Connection Cooled Down De-Pressurized Drained / Vented
YES NO YES NO YES NO YES NO YES NO
Safety Engineer
Remarks

4- OPERATION & MAINTENANCE APPROVALS:


OPERATION MANAGER APPROVAL MAINTENANCE MANAGER APPROVAL
Name: Name:
Date: Date:
Signature: Signature:
Status Date Time Department Name Signature
Under IC Condition Operation
Work in Progress Maintenance
End of Work Maintenance
Back to Normal Operation Operation

5- JOB FEED BACK:


Started Date Finished Date Work Period (Hrs) Operation Hours (Before) Operation Hours (After) Prepared By

1- 2- 3-
Work Team
Names
4- 5- 6-

Performed
Job

Engineer
Remarks
No Description Part No. Qty
1

2
Used
3
Material
4

6
MAINTENANCE ENGINEER MAINTENANCE MANAGER
Name: Name:
Date: Date:
Signature: Signature:
MINISTRY OF ELECTRICITY ENERGY
PUBLIC ELECTRICITY CORPORATION
MARIB GAS POWER GENERATION STATION
PLANNING DEPARTMENT

CORRECTIVE MAINTENANCEPERMIT TO WORK (CM)


MINISTRY OF ELECTRICITY ENERGY
PUBLIC ELECTRICITY CORPORATION
MARIB GAS POWER GENERATION STATION
PLANNING DEPARTMENT

CORRECTIVE MAINTENANCEPERMIT TO WORK (CM)

1- WORK REQUEST:
CM Request No. Requested Date Requested By System / Equipment

WR-91/20 13-August-2020 ARIF AIR COMPRESSOR SYS

Details of Defects To check and clean inlet air filter for air comressor( 1and 2)

2- WORK PERMIT:
Urgency System/Equipment GT(s) Main Assistance
CM Permit No. Issued Date Prepared By Unit
Level Shutdown Shutdown Department Department
CM-MECH-50/20 13-August-2020 MORISY 10 0 yes NO MECH MECH

KKS 10SCA

Maintenance
Remarks

3- WORK CONDITIONS & SAFETY PRECAUTIONS:


Condition Type BC TC IC BC / TC Certificate No. (If Applicable)
Engineer Requirements
De-Energized Earthing Connection Cooled Down De-Pressurized Drained / Vented
YES NO YES NO YES NO YES NO YES NO
Safety Engineer
Remarks

4- OPERATION & MAINTENANCE APPROVALS:


OPERATION MANAGER APPROVAL MAINTENANCE MANAGER APPROVAL
Name: Name:
Date: Date:
Signature: Signature:
Status Date Time Department Name Signature
Under IC Condition Operation
Work in Progress Maintenance
End of Work Maintenance
Back to Normal Operation Operation

5- JOB FEED BACK:


Started Date Finished Date Work Period (Hrs) Operation Hours (Before) Operation Hours (After) Prepared By

1- 2- 3-
Work Team
Names
4- 5- 6-

Performed
Job

Engineer
Remarks
No Description Part No. Qty
1

2
Used
3
Material
4

6
MAINTENANCE ENGINEER MAINTENANCE MANAGER
Name: Name:
Date: Date:
Signature: Signature: