MINISTRY OF ELECTRICITY ENERGY

PUBLIC ELECTRICITY CORPORATION


MARIB GAS POWER GENERATION STATION
PLANNING DEPARTMENT

CORRECTIVE MAINTENANCEPERMIT TO WORK (CM)

1- WORK REQUEST:
CM Request No. Requested Date Requested By System / Equipment

WR-154/20 17-November-2020 ARIF GT12_LUB OIL COOLER

Details of Defects To check and repair the Fan#1.

2- WORK PERMIT:
Urgency System/Equipment GT(s) Main Assistance
CM Permit No. Issued Date Prepared By Unit
Level Shutdown Shutdown Department Department
CM-MECH-75/20 17-November-2020 MORISY 12 0 NO NO MECH ELEC

KKS 12MBV23AN011

Maintenance
Remarks

3- WORK CONDITIONS & SAFETY PRECAUTIONS:


Condition Type BC TC IC BC / TC Certificate No. (If Applicable)
Engineer Requirements
De-Energized Earthing Connection Cooled Down De-Pressurized Drained / Vented
YES NO YES NO YES NO YES NO YES NO
Safety Engineer
Remarks

4- OPERATION & MAINTENANCE APPROVALS:


OPERATION MANAGER APPROVAL MAINTENANCE MANAGER APPROVAL
Name: Name:
Date: Date:
Signature: Signature:
Status Date Time Department Name Signature
Under IC Condition Operation
Work in Progress Maintenance
End of Work Maintenance
Back to Normal Operation Operation

5- JOB FEED BACK:


Started Date Finished Date Work Period (Hrs) Operation Hours (Before) Operation Hours (After) Prepared By

1- 2- 3-
Work Team
Names
4- 5- 6-

Performed
Job

Engineer
Remarks
No Description Part No. Qty
1

2
Used 3
Material
4

6
MAINTENANCE ENGINEER MAINTENANCE MANAGER
Name: Name:
Date: Date:
Signature: Signature:
MINISTRY OF ELECTRICITY ENERGY
PUBLIC ELECTRICITY CORPORATION
MARIB GAS POWER GENERATION STATION
PLANNING DEPARTMENT

CORRECTIVE MAINTENANCEPERMIT TO WORK (CM)

1- WORK REQUEST:
CM Request No. Requested Date Requested By System / Equipment

WR-155/20 17-November-2020 WASIM GT12_HVAC

Details of Defects To check and replac the damaged air filter.

2- WORK PERMIT:
Urgency System/Equipment GT(s) Main Assistance
CM Permit No. Issued Date Prepared By Unit
Level Shutdown Shutdown Department Department
CM-MECH-76/20 17-November-2020 MORISY 12 1 YES NO MECH ELEC

KKS 12SAA01AH001,12SAA01AH001

Maintenance
Remarks

3- WORK CONDITIONS & SAFETY PRECAUTIONS:


Condition Type BC TC IC BC / TC Certificate No. (If Applicable)
Engineer Requirements
De-Energized Earthing Connection Cooled Down De-Pressurized Drained / Vented
YES NO YES NO YES NO YES NO YES NO
Safety Engineer
Remarks

4- OPERATION & MAINTENANCE APPROVALS:


OPERATION MANAGER APPROVAL MAINTENANCE MANAGER APPROVAL
Name: Name:
Date: Date:
Signature: Signature:
Status Date Time Department Name Signature
Under IC Condition Operation
Work in Progress Maintenance
End of Work Maintenance
Back to Normal Operation Operation

5- JOB FEED BACK:


Started Date Finished Date Work Period (Hrs) Operation Hours (Before) Operation Hours (After) Prepared By

1- 2- 3-
Work Team
Names
4- 5- 6-

Performed
Job

Engineer
Remarks
No Description Part No. Qty
1

2
Used 3
Material
4

6
MAINTENANCE ENGINEER MAINTENANCE MANAGER
Name: Name:
Date: Date:
Signature: Signature:
MINISTRY OF ELECTRICITY ENERGY
PUBLIC ELECTRICITY CORPORATION
MARIB GAS POWER GENERATION STATION
PLANNING DEPARTMENT

CORRECTIVE MAINTENANCEPERMIT TO WORK (CM)

1- WORK REQUEST:
CM Request No. Requested Date Requested By System / Equipment

WR-156/20 17-November-2020 ARIF B.S.D.G#1

Details of Defects To check and repair the water leakage at hat circuit and lift side .

2- WORK PERMIT:
Urgency System/Equipment GT(s) Main Assistance
CM Permit No. Issued Date Prepared By Unit
Level Shutdown Shutdown Department Department
CM-MECH-77/20 17-November-2020 MORISY 10 0 YES NO MECH ELEC

KKS 00XKA01

Maintenance
Remarks

3- WORK CONDITIONS & SAFETY PRECAUTIONS:


Condition Type BC TC IC BC / TC Certificate No. (If Applicable)
Engineer Requirements
De-Energized Earthing Connection Cooled Down De-Pressurized Drained / Vented
YES NO YES NO YES NO YES NO YES NO
Safety Engineer
Remarks

4- OPERATION & MAINTENANCE APPROVALS:


OPERATION MANAGER APPROVAL MAINTENANCE MANAGER APPROVAL
Name: Name:
Date: Date:
Signature: Signature:
Status Date Time Department Name Signature
Under IC Condition Operation
Work in Progress Maintenance
End of Work Maintenance
Back to Normal Operation Operation

5- JOB FEED BACK:


Started Date Finished Date Work Period (Hrs) Operation Hours (Before) Operation Hours (After) Prepared By

1- 2- 3-
Work Team
Names
4- 5- 6-

Performed
Job

Engineer
Remarks
No Description Part No. Qty
1

2
Used 3
Material
4

6
MAINTENANCE ENGINEER MAINTENANCE MANAGER
Name: Name:
Date: Date:
Signature: Signature: