Professional Documents
Culture Documents
Checked by
Approved by
Foreman/Superviso : Robby Prianggodo : Alek Sander
Plant Departement
r
PART NUMBER PART NAME QTY DESC,* GROUP NUMBER GROUP NAME DID THIS INCIDENT DESCRIPTIVE COMMENTS (20
RESPONSIBLE CODE CONTAINING MAKE THE PRODUCT SPACES MAXIMUM PER
PART INOPERABLE INCIDENT)
Engine 1 C Yes No Broken
Yes No
Yes No
DESCRIPTION CODES * A – Structural C – Leaks E – System Malfunction G – General Repair K - Serviceability X – Operator
B – Surface D – Factory Assembly F – Factory Shipping H – Adjustment N - Abuse Complaint
Component Information
Component Description : PCR Schedule Hrs :
Comp Serial No / ID : Comp Hours :
Comp Arr / Gp No : Life Remaining :
Mach Hrs Install : Comp New Price :
Mach Hrs Removed : Cost To Repair :
Date Comp Installed : Cost/Hr Remaining :
Date Comp Failed :
Supporting Documentation Required
# Description Y/N Comments
1 Installation Check List
2 Repair & Maintenance History N
3 SOS History N
4 Magnetic Plug Inspections N
5 ET/VIMS Data
6 TPMS / Payload Data
7 Performance Test Data
8 Others Visual check Engine
1 of 4
Technician report
Failure Outline:.
Fuel at engine oil
Background / Research:
Agter check found that,
- Unit operation at Bumi Merapi Energi at 29 August 2021
- Unit on site Bumi Merapi Energi effective 40 Hrs (08 - 48,8)
- No indicated error at engine panel
- Info from Operation team that engine leaks fuel, after check found that engine oil was over fill
(fuel dilution at oil pan)
Suggest to check & inspect fuel Nozzle by Dealer (unit under warranty Periode)
OBSERVATION
Part Number -Name – Modifier Code To Help Explain Progression/Stage of Failure, Use – Notes
(RH/LH/Upper/Lower etc) /Photos/Parts Book Illustration.
Identify Type, Amount, Location of Wear, Deposits, Damage,
Fractures etc.
Engine condition
Generator range
2 of 4
Technician report
Engine HM : 48,8
3 of 4
Technician report
4 of 4