PROJECT PROGRESS STATUS

         
 
area Description of Work Progress REMARKS
Two BSI welder working in
Modul Installation of angel brace between BSI Crane beam and plastic factory
e1 butler internal column @ grid line A&B&C
 
 
     
     
     
     
     
PROGRESS REPORT Plastic factory (J‐350) December-1- 2011
full welding @ grid line -B- middle of crane -BSI welder work
Grid line B – additional bracing welding.
Grid line A-additional bracing welding.

Project Name: Plastic factory


Forman 1 crane
Erector 3 fork lift
Equipment on site

S. officer man lift


Man power

BSI welder 2 S.Lift


. Welding gen. 1

total: 6