You are on page 1of 10

PROJECT : ZAHID BUSINESS PARK

DRAWING SUBMITTAL
PURPOSE OF SUBMITTAL

CIVIL STRUCTURAL ARCHITECTURAL MECHANICAL ELECTRICAL OTHERS


PROVIDED DOCUMENTS
CATALOGUES CERTIFICATES SAMPLE TECHNICAL DATA
DRAWING CALCULATIONS SPECIFICATIONS OTHERS
DOC No. Date of Submittal SUBMITTED FOR
New Request
ZBP-V3-ALSAAD-HQ-DWG-SD-AR-257-REV01 28 oct 2021 APPROVAL

Resub. Request YOUR INFO

Contractor's Remarks & Exceptions


DRAWING SUBMITTAL :
No. QTY DRAWING NUMBER / REV TITLE / DESCRIPTION ACTION REMARKS
Zahid Business Park Project - HQ & CC Building
HEADQUARTERS TENTH FLOOR OVERALL CEILING LAYOUT
1 ZBP/HQ/SD/A1A-433
FLOOR PLAN
HEADQUARTERS TENTH FLOOR PARTIAL CEILING PLAN
2 ZBP/HQ/SD/A1A-433 A - PART 1
HEADQUARTERS TENTH FLOOR PARTIAL CEILING PLAN
3 ZBP/HQ/SD/A1A-433 B
- PART 2
4 HEADQUARTERS TENTH FLOOR PARTIAL CEILING PLAN
ZBP/HQ/SD/A1A-433 C
- PART 3
5 HEADQUARTERS TENTH FLOOR PARTIAL CEILING PLAN
ZBP/HQ/SD/A1A-433 D
- PART 4

6 ZBP/HQ/SD/A1A-433 D HEADQUARTERS TENTH FLOOR CEILING SECTIONS

7 ZBP/HQ/SD/A1A-439Z HEADQUARTERS TENTH FLOOR CEILING SECTIONS

8 ZBP/HQ/SD/A1A-439Zb HEADQUARTERS TENTH FLOOR CEILING SECTIONS

9 ZBP/HQ/SD/A1A-439Zc HEADQUARTERS TENTH FLOOR CEILING SECTIONS

10

ATTACHEMENTS

Submitted by Contractor: Received By: V3 M.E. Consultants


Signature: Signature:
Name : Imad Shakhshir Name :

Position : PM Position :
Date : 28 oct 2021 Date :
FOLLOW UP IS REQUIRED BY:
Consultant's Comments Remarks

A Approved As Submitted For : V3 Middle East Consultant Company Received By:


B Approved As Noted Resubmission not required Signature: Signature:
ACTION
ACTION

C Resubmission required Name: Name :


D Disapproved Position: Position:
E No Action Taken Date : Date :

F-V3ME/SUB/ZBP/001- Rev. 00
GENERAL NOTES

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SHOWN


IN THE DRAWING.
2. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
STRUCTURAL , MECHANICAL, ELECTRICAL AND ID DRAWINGS.
3. FOR CEILING PLANS AND DETAILS, REFER TO DRAWING NOS.
ZBP/HQ/SD/ID401 TO 414.
4. ALL ARCHITECTURAL LIGHTING FIXTURE ARE DALI EQUIPPED.
5. FOR INTERRIOR ROOM BY ROOM TO BE SUBMITTED SEPARATELY.
6. FOR TOILET AREA REFER TO ENLARGEMENT PLAN.

LEGEND:

8.5W LED DOWN LIGHTER

MATCHLINE
24W LED DOWN LIGHTER

14W LED ADJUSTABLE SPOT LIGHT

7W LED SUSPENDED LUMINARIE


20W LED SUSPENDED LUMINARIE
LINEAR LED LIGHTING, 14.4 W/m WITH
WITH DALI POWER DRIVER AS NEEDED
5W/10W/15W LED RECESSED TRIMLESS
GIMBLE LIGHT- IP44 IN TOILETS
200x600mm RECESSED LED LIGHTING-22W
SUSPENDED LED LIGHTING PROFILE
35W or 44W
RECESSED LIGHTING MODULE

PART-1 PART-2
33 W LED LUMINAIRE-585x585mm
1
A1A-202 LUMINARIE FED FROM GENERATOR
PANEL
LUMINARIES FED FROM EMERGENCY
BATTERY PANEL
A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1
3 4 5 6 7 8 9 10 10' 11 12 13 14 15 16 SUPPLY & RETURN
CEILING DIFFUSER
8000 8000 8000 4000 4000 5400 2600 50 7950 3000 2100 2900 8000 8000

SUPPLY & RETURN


LINEAR DIFFUSER

FIRE ALARM FLASHER

SMOKE DETECTOR
RATE OF RISE
FIXED TEMPERATURE HEAT DETECTOR
SPRINKLER

OCCUPANCY SENSOR

A1 A1 SPEAKER
H H EXIT SIGNAGE
73 72 71
A1A-439Zb A1A-439Zb A1A-439Z
C01-a CEILING TYPE
3000

3000
3000 CEILING HEIGHT
GYPSUM BOARD
C01-a
TO RECEIVE PAINT - WHITE COLOR
GYPSUM BOARD
C01-b
A1 C01-a
3100
A1 TO RECEIVE PAINT - SILVER GREY COLOR

I I C02-a ACOUSTICAL CEILING


C01-a
3150
10F.41 C03-a PERFORATED TILED CEILING 600 x 600 MM
C01-a 10F.40
C01-a
3000 C04-a STRETCHED CEILING
C01-a C01-a
3320 10F.26 10F.26A C01-a
3200 3000
C01-a 10F.42 3100 C05-a ACOUSTICAL WOOD PANEL
C01-a
3000 C01-a
C01-a 3000
3150
3150 C05-b ACOUSTICAL WOOD PANEL - WHITE
5850

5850
C01-a C01-a 10F.38 10F.37
74 3000 3000
C01-a
A1A-439Zb C05-c ACOUSTICAL WOOD PANEL - GREY
3150 C01-a
3100
C06-a PAINT FINISHED MOISTURE RESISTANT GB
10F.39
C01-a C01-a C07-a BOTTOM OF SLAB (PLASTER & PAINT FINISH)
2950 C01-a C01-a 3000
C01-a C01-a C01-a
2850 2950
3000 3150 3000 C08-a STAINLESS STEEL
C01-a
3000

A1 C01-a A1 KEYPLAN:
J 3000
10F.11 C01-a
10F.04 J
750

750
3150
C01-a C01-a
C01-a
2850 3300
2850
10F.05
A1 C01-a C01-a
10F.06
C01-a
3150
C01-a
3300
A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1

K K
3 4 5 6 7 8 9 10 10' 11 12 13 14 15 16

2850
2850
10F.36
10F.09
C01-a 70 A1
H

10F.28 3050
C01-a C01-a
A1A-439Za A1

2850 2600 I

C07-a C07-a
C01-a
3750
3150
3750 PART-1 PART-2
10F.33
A1
J

C01-a C01-a C01-a 1


A1
K

C01-a 3150 3100 2950


C01-a 2950
3050 C01-a C01-a A1

C01-a C01-a L

3000 3150
10F.27 C01-a
C01-a
3000
C01-a
3000
C01-a PART-3 PART-4
3050 10F.13
8000

8000
A1

3000 3150 3000


M

C01-a 10F.01 10F.30B A1

10F.12
N

C01-b C01-b
10F.16 3050
2950 2950 C01-a
A1
O

C01-a C01-a
3150 2400
3050 C01-a
C01-a
10F.13A 3150 10F.03 2800
C01-a
2850

C01-a 10F.10 10F.35


10F.17 3050
C01-a
10F.07
C07-a C07-a
5760 2400 5760 C01-a
C01-a
10F.34 C01-a 3300

MATCHLINE A1 C01-a
3150

10F.02 C01-a
2800
2800

A1 MATCHLINE NAME:
SIGNATURE/
10F.08 2850
L L DATE:
C01-a C01-a C01-a C01-a C01-a
C01-a 3000 3150 2950 2850 2950
A Approved As Submitted D Disapproved
3000
C01-a
3000
C01-a
Approved as Noted No Action Taken
10F.15
C01-a C01-a C01-a C01-a
C01-a
C01-a
1
3000
B Resubmission not required E
3100 C01-a
3000 3000 C01-a 2950 3000 2850
C01-a C01-a C01-a 2800
10F.14
6000

6000
3000 3170 3170
3100 1 C Resubmission required
1 C03-a C03-a
C01-a
3000
C01-a
3170
10F.19 C03-a 10F.20 C03-a
C01-a
2800
10F.31 C01-a
2800 10F.32 2
A1A-203 10F.18A 3000 10F.18 3000 2950 3000 10F.30A A1A-203
10F.24 C01-a
10F.21 2700
10F.30
10F.25 C01-a
3000

A1 C01-a
2700 A1
M M
C01-a C01-a Oct.17.2021 1 Revised as per comments
3000 3150 69 Sept.15.2021 000 Issued For Approval
A1A-439Z
DATE REVISION NO. REMARKS

75 CLIENT
A1A-439Zc C01-a C01-a
3150 3150
1
6000

6000
C01-a C01-a
3000 3100 10F.29

10F.22 1

C01-a 10F.23 [T] +966 26681765


3000
[F] +966 26681732
P.O. Box 3896 - Jeddah 21481

ARCHITECTS & INTERIORS [E] info@kaosarchitects.com


A1 C01-a A1
N 3150
N
3000

3000
77 76
A1A-439Zc A1A-439Zc

MEP CONSULTANT
A1 A1
O O

PROJECT MANAGEMENT & SUPERVISION

CONTRACTOR
G
Limited Liability Co.

1 P.O. Box 13028, Jeddah 21493, Saudi Arabia


A1A-201 P.O. Box 16910, Riyadh 11474, Saudi Arabia

JOB NUMBER

PART-3 PART-4 2013-154


MATCHLINE

PROJECT NAME

ZAHID BUSINESS PARK

LOCATION: PLOT NUMBER


JEDDAH KSA
DESIGN BY
ARCHITECT TK
STRUCTURAL ENGINEER MF
ELECTROMECHANICAL ENGINEER DM
DRAWN: MM
CHECKED: IS

1 TENTH FLOOR OVERALL CEILING PLAN DESIGN PHASE


CONSTRUCTION PHASE CP
- SCALE: 1 : 150 REVISION NUMBER
REVIEW CYCLE: 001
FORMAT SCALE DATE

A1 1:150 Sept.15.2021
DRAWING TITLE AND NUMBER
HEADQUARTERS
TENTH FLOOR
OVERALL CEILING LAYOUT FLOOR PLAN
TRANSMITTAL #: DRAWING NUMBER
ZBP-V3-ALSAAD-HQ-DWG-SD-AR-257-REV01 ZBP/HQ/SD/A1A-433
SIZE A1 594MM x 841MM
GENERAL NOTES

DRAWING NO. ZBP-HQ-SD-A1A-433B


1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SHOWN

FOR CONTINUATION SEE PART-2


IN THE DRAWING.
2. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
STRUCTURAL , MECHANICAL, ELECTRICAL AND ID DRAWINGS.
3. FOR CEILING PLANS AND DETAILS, REFER TO DRAWING NOS.
ZBP/HQ/SD/ID401 TO 414.

MATCHLINE
4. ALL ARCHITECTURAL LIGHTING FIXTURE ARE DALI EQUIPPED.
5. FOR INTERRIOR ROOM BY ROOM TO BE SUBMITTED SEPARATELY.
6. FOR TOILET AREA REFER TO ENLARGEMENT PLAN.

LEGEND:

8.5W LED DOWN LIGHTER

24W LED DOWN LIGHTER

1 14W LED ADJUSTABLE SPOT LIGHT

7W LED SUSPENDED LUMINARIE


A1A-202
20W LED SUSPENDED LUMINARIE
LINEAR LED LIGHTING, 14.4 W/m WITH
WITH DALI POWER DRIVER AS NEEDED
5W/10W/15W LED RECESSED TRIMLESS
GIMBLE LIGHT- IP44 IN TOILETS
A1 A1 A1 A1 A1 A1 A1 A1 A1 200x600mm RECESSED LED LIGHTING-22W

3 4 5 6 7 8 9 10 10' SUSPENDED LED LIGHTING PROFILE


35W or 44W
RECESSED LIGHTING MODULE
33 W LED LUMINAIRE-585x585mm

8000 8000 8000 4000 4000 5400 2600 50 LUMINARIE FED FROM GENERATOR
PANEL
LUMINARIES FED FROM EMERGENCY
BATTERY PANEL

SUPPLY & RETURN


CEILING DIFFUSER

SUPPLY & RETURN


LINEAR DIFFUSER

PART-1 PART-2
FIRE ALARM FLASHER

SMOKE DETECTOR
RATE OF RISE
FIXED TEMPERATURE HEAT DETECTOR
SPRINKLER

OCCUPANCY SENSOR

SPEAKER

EXIT SIGNAGE
C01-a CEILING TYPE

A1 CEILING HEIGHT
3000
GYPSUM BOARD
C01-a
TO RECEIVE PAINT - WHITE COLOR
H C01-b
GYPSUM BOARD
TO RECEIVE PAINT - SILVER GREY COLOR
73 72 C02-a ACOUSTICAL CEILING
A1A-439Zb A1A-439Zb
C03-a PERFORATED TILED CEILING 600 x 600 MM
3000

C04-a STRETCHED CEILING

C05-a ACOUSTICAL WOOD PANEL

C05-b ACOUSTICAL WOOD PANEL - WHITE

C05-c ACOUSTICAL WOOD PANEL - GREY

A1 C06-a

C07-a
PAINT FINISHED MOISTURE RESISTANT GB

BOTTOM OF SLAB (PLASTER & PAINT FINISH)


I C08-a STAINLESS STEEL
C01-a
3150 10F.41 KEYPLAN:
C01-a 10F.40
3000
C01-a
10F.26
A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1
3 4 5 6 7 8 9 10 10' 11 12 13 14 15 16

3320
10F.26A
C01-a 10F.42 A1
H

A1
I

3000 C01-a
C01-a
3150
A1
J

A1
PART-1 PART-2
3150
5850

C01-a
74 3000 A1
L

C01-a
A1A-439Zb
3150
A1

PART-3 PART-4
M

C01-a
3100 A1
N

A1
O

C01-a
2950 C01-a C01-a
C01-a C01-a C01-a
2850 2950
3000 3150 3000

NAME:
A1 C01-a SIGNATURE/
DATE:
J 3000
10F.11 C01-a
750

3150
A Approved As Submitted D Disapproved

A1 C01-a
B
Approved as Noted
Resubmission not required E No Action Taken

K 2850 C Resubmission required


10F.09
C01-a
10F.28 3050
C01-a
2850
C07-a
C01-a
3750
3150

C01-a
C01-a Oct.17.2021 1 Revised as per comments
2950
3050 C01-a C01-a Sept.15.2021 000 Issued For Approval
3000 3150 DATE REVISION NO. REMARKS
10F.27 C01-a
C01-a CLIENT
3050 10F.13
8000

3000

C01-a
10F.16 3050 10F.12
C01-a
3050 C01-a [T] +966 26681765
10F.13A 3150 [F]
P.O. Box
+966 26681732
3896 - Jeddah 21481
C01-a
2850 ARCHITECTS & INTERIORS [E] info@kaosarchitects.com

C01-a 10F.10
10F.17 3050
C07-a
5760 C01-a
3150
MEP CONSULTANT

MATCHLINE A1 C01-a
10F.08 2850
FOR CONTINUATION SEE PART-3
DRAWING NO. ZBP-HQ-SD-A1A-433C
L
PROJECT MANAGEMENT & SUPERVISION

C01-a C01-a C01-a


C01-a 3000 3150 2950
3000
CONTRACTOR
10F.15 G
C01-a C01-a C01-a Limited Liability Co.

3000 3000 C01-a 2950


C01-a C01-a
10F.14
6000

3000 3170 3170 P.O. Box 13028, Jeddah 21493, Saudi Arabia
P.O. Box 16910, Riyadh 11474, Saudi Arabia

1 C03-a C03-a
C01-a
3000
C01-a
3170
10F.19 C03-a 10F.20
JOB NUMBER

2013-154
A1A-203 10F.18A 3000 10F.18 3000 2950
PROJECT NAME

ZAHID BUSINESS PARK

PART-3 PART-4 LOCATION:


JEDDAH KSA
DESIGN BY
ARCHITECT
PLOT NUMBER

TK
STRUCTURAL ENGINEER MF

1 TENTH FLOOR PARTIAL FLOOR PLAN - PART 1 ELECTROMECHANICAL ENGINEER


DRAWN:
DM
MM
CHECKED: IS
- SCALE: 1 : 75 DESIGN PHASE
CONSTRUCTION PHASE CP
REVISION NUMBER
REVIEW CYCLE: 001
FORMAT SCALE DATE

A1 1:75 Sept.15.2021
DRAWING TITLE AND NUMBER
HEADQUARTERS
TENTH FLOOR
PARTIAL CEILING PLAN - PART 1
TRANSMITTAL #: DRAWING NUMBER
ZBP-V3-ALSAAD-HQ-DWG-SD-AR-257-REV01 ZBP/HQ/SD/A1A-433A
SIZE A1 594MM x 841MM
GENERAL NOTES

DRAWING NO. ZBP-HQ-SD-A1A-433A


1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SHOWN

FOR CONTINUATION SEE PART-1


IN THE DRAWING.
2. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
STRUCTURAL , MECHANICAL, ELECTRICAL AND ID DRAWINGS.
3. FOR CEILING PLANS AND DETAILS, REFER TO DRAWING NOS.
ZBP/HQ/SD/ID401 TO 414.

MATCHLINE
4. ALL ARCHITECTURAL LIGHTING FIXTURE ARE DALI EQUIPPED.
5. FOR INTERRIOR ROOM BY ROOM TO BE SUBMITTED SEPARATELY.
6. FOR TOILET AREA REFER TO ENLARGEMENT PLAN.

LEGEND:

8.5W LED DOWN LIGHTER

24W LED DOWN LIGHTER

1 14W LED ADJUSTABLE SPOT LIGHT

7W LED SUSPENDED LUMINARIE


A1A-202
20W LED SUSPENDED LUMINARIE
LINEAR LED LIGHTING, 14.4 W/m WITH
WITH DALI POWER DRIVER AS NEEDED
5W/10W/15W LED RECESSED TRIMLESS
GIMBLE LIGHT- IP44 IN TOILETS
A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 200x600mm RECESSED LED LIGHTING-22W

6 7 8 9 10 10' 11 12 13 14 15 16 SUSPENDED LED LIGHTING PROFILE


35W or 44W
RECESSED LIGHTING MODULE
33 W LED LUMINAIRE-585x585mm

4000 4000 5400 2600 50 7950 3000 2100 2900 8000 8000 LUMINARIE FED FROM GENERATOR
PANEL
LUMINARIES FED FROM EMERGENCY
BATTERY PANEL

SUPPLY & RETURN


CEILING DIFFUSER

SUPPLY & RETURN


LINEAR DIFFUSER

FIRE ALARM FLASHER

PART-1 PART-2 SMOKE DETECTOR


RATE OF RISE
FIXED TEMPERATURE HEAT DETECTOR
SPRINKLER

OCCUPANCY SENSOR

SPEAKER

EXIT SIGNAGE
C01-a CEILING TYPE

A1 CEILING HEIGHT
3000
GYPSUM BOARD
C01-a
TO RECEIVE PAINT - WHITE COLOR
H C01-b
GYPSUM BOARD
TO RECEIVE PAINT - SILVER GREY COLOR
72 71 C02-a ACOUSTICAL CEILING
A1A-439Zb A1A-439Z
C03-a PERFORATED TILED CEILING 600 x 600 MM

3000
C04-a STRETCHED CEILING

C05-a ACOUSTICAL WOOD PANEL

C05-b ACOUSTICAL WOOD PANEL - WHITE

C05-c ACOUSTICAL WOOD PANEL - GREY

C01-a
3100
A1 C06-a

C07-a
PAINT FINISHED MOISTURE RESISTANT GB

BOTTOM OF SLAB (PLASTER & PAINT FINISH)


I C08-a STAINLESS STEEL
C01-a
3150 10F.41 KEYPLAN:
C01-a 10F.40
3000
C01-a C01-a A1
3
A1
4
A1
5
A1
6
A1
7
A1
8
A1
9
A1
10
A1
10'
A1
11
A1
12
A1
13
A1
14
A1
15
A1
16

C01-a 3200 3000


C01-a 10F.42 3100
C01-a
A1
H

A1
I

3000 C01-a 3000


3150
A1
J

A1
PART-1 PART-2

5850
K

C01-a C01-a 10F.38 10F.37


74 3000 3000
A1
L

A1A-439Zb A1

PART-3 PART-4
M

A1
N

10F.39
A1
O

C01-a C01-a
2950 C01-a C01-a 3000
C01-a C01-a C01-a
2850 2950
3000 3150 3000
C01-a
3000 NAME:
A1 SIGNATURE/
DATE:
C01-a
10F.04 J

750
3150
C01-a
C01-a C01-a A Approved As Submitted D Disapproved
2850 3300
2850
10F.05
C01-a
10F.06
C01-a
3150
C01-a
3300
A1 B
Approved as Noted
Resubmission not required E No Action Taken
2850
10F.36 K C Resubmission required

C01-a 70
2600 A1A-439Za
C07-a
C01-a
3750
3150
C01-a 10F.33 C01-a C01-a 1
C01-a 3150 3100 2950
Oct.17.2021 1 Revised as per comments
2950
C01-a Sept.15.2021 000 Issued For Approval
C01-a C01-a
3150 DATE REVISION NO. REMARKS
3000 3000
C01-a C01-a C01-a CLIENT
10F.13

8000
3000 3150 3000

10F.01 10F.30B
10F.12 C01-b C01-b
2950 2950 C01-a
C01-a
3150 2400
C01-a [T] +966 26681765
C01-a
10F.13A 3150 10F.03 2800
[F] +966 26681732
P.O. Box 3896 - Jeddah 21481

ARCHITECTS & INTERIORS [E] info@kaosarchitects.com

10F.35
C01-a
10F.07
C07-a
2400 5760 C01-a
C01-a
3150 10F.34 C01-a 3300
MEP CONSULTANT
2800
10F.02 C01-a
2800
MATCHLINE A1
FOR CONTINUATION SEE PART-4
DRAWING NO. ZBP-HQ-SD-A1A-433D
L
PROJECT MANAGEMENT & SUPERVISION

C01-a C01-a C01-a C01-a C01-a


3000 3150 2950 2850 2950

C01-a
C01-a CONTRACTOR
3000
3000
C01-a 1
G
C01-a C01-a C01-a C01-a Limited Liability Co.
3100 C01-a
3000 C01-a 2950 3000 2850
C01-a 2800

6000
3170 P.O. Box 13028, Jeddah 21493, Saudi Arabia
3100 1 P.O. Box 16910, Riyadh 11474, Saudi Arabia

C03-a
C01-a
3000
C01-a
3170
10F.19 C03-a 10F.20 C03-a
C01-a
2800
10F.31 C01-a
2800 10F.32 2 JOB NUMBER

2013-154
10F.18 3000 2950 3000 10F.30A A1A-203
10F.24 C01-a
PROJECT NAME
10F.21 2700
10F.30
10F.25 C01-a ZAHID BUSINESS PARK

PART-3 PART-4 LOCATION:


JEDDAH KSA
DESIGN BY
ARCHITECT
PLOT NUMBER

TK
STRUCTURAL ENGINEER MF

1 TENTH FLOOR PARTIAL FLOOR PLAN - PART 2 ELECTROMECHANICAL ENGINEER


DRAWN:
DM
MM
CHECKED: IS
- SCALE: 1 : 75 DESIGN PHASE
CONSTRUCTION PHASE CP
REVISION NUMBER
REVIEW CYCLE: 001
FORMAT SCALE DATE

A1 1:75 Sept.15.2021
DRAWING TITLE AND NUMBER
HEADQUARTERS
TENTH FLOOR
PARTIAL CEILING PLAN - PART 2
TRANSMITTAL #: DRAWING NUMBER
ZBP-V3-ALSAAD-HQ-DWG-SD-AR-257-REV01 ZBP/HQ/SD/A1A-433B
SIZE A1 594MM x 841MM
GENERAL NOTES

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SHOWN


IN THE DRAWING.
2. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
STRUCTURAL , MECHANICAL, ELECTRICAL AND ID DRAWINGS.
3. FOR CEILING PLANS AND DETAILS, REFER TO DRAWING NOS.
ZBP/HQ/SD/ID401 TO 414.
4. ALL ARCHITECTURAL LIGHTING FIXTURE ARE DALI EQUIPPED.

1 5.
6.
FOR INTERRIOR ROOM BY ROOM TO BE SUBMITTED SEPARATELY.
FOR TOILET AREA REFER TO ENLARGEMENT PLAN.

PART-1
A1A-202
PART-2 LEGEND:

8.5W LED DOWN LIGHTER

24W LED DOWN LIGHTER


A1 A1 A1 A1 A1 A1 A1 A1 A1 14W LED ADJUSTABLE SPOT LIGHT
3 4 5 6 7 8 9 10 10' 7W LED SUSPENDED LUMINARIE
20W LED SUSPENDED LUMINARIE
LINEAR LED LIGHTING, 14.4 W/m WITH
8000 8000 8000 4000 4000 5400 2600 50 7950 WITH DALI POWER DRIVER AS NEEDED
5W/10W/15W LED RECESSED TRIMLESS
GIMBLE LIGHT- IP44 IN TOILETS
5850

C01-a 200x600mm RECESSED LED LIGHTING-22W


74 3000 SUSPENDED LED LIGHTING PROFILE
C01-a
A1A-439Zb 35W or 44W
3150 C01-a
3100 RECESSED LIGHTING MODULE
33 W LED LUMINAIRE-585x585mm
10F.39
C01-a LUMINARIE FED FROM GENERATOR
PANEL
2950 C01-a C01-a
C01-a C01-a C01-a LUMINARIES FED FROM EMERGENCY
2850 2950 BATTERY PANEL
3000 3150 3000
C01-a
3000 SUPPLY & RETURN
A1 C01-a
CEILING DIFFUSER

J 3000
10F.11 C01-a
750

3150 SUPPLY & RETURN


LINEAR DIFFUSER

A1 C01-a
FIRE ALARM FLASHER

K 2850
SMOKE DETECTOR
10F.09 RATE OF RISE
C01-a
10F.28 3050
C01-a FIXED TEMPERATURE HEAT DETECTOR
2850
C07-a
C01-a
SPRINKLER
3750
3150
OCCUPANCY SENSOR
C01-a
C01-a 3150
SPEAKER
C01-a 2950
3050 C01-a C01-a EXIT SIGNAGE
C01-a C01-a
3000 3150
10F.27 C01-a
C01-a
3000
C01-a
3000 C01-a CEILING TYPE
3050 10F.13 3000 CEILING HEIGHT
8000

3000 3150 GYPSUM BOARD


C01-a
TO RECEIVE PAINT - WHITE COLOR
C01-a 10F.01 C01-b
GYPSUM BOARD

10F.16 3050 10F.12 C01-b C01-b TO RECEIVE PAINT - SILVER GREY COLOR
2950 2950 C02-a ACOUSTICAL CEILING
C01-a C01-a
3050 C01-a 3150 C03-a PERFORATED TILED CEILING 600 x 600 MM
10F.13A 3150 C04-a STRETCHED CEILING
C01-a
2850 C05-a ACOUSTICAL WOOD PANEL

C05-b ACOUSTICAL WOOD PANEL - WHITE


C01-a 10F.10 C05-c ACOUSTICAL WOOD PANEL - GREY
10F.17 3050
C07-a C06-a PAINT FINISHED MOISTURE RESISTANT GB
5760 C01-a C07-a BOTTOM OF SLAB (PLASTER & PAINT FINISH)
3150
C08-a STAINLESS STEEL

A1 MATCHLINE C01-a KEYPLAN:


10F.08 2850
L FOR CONTINUATION SEE PART-1
DRAWING NO. ZBP-HQ-SD-A1A-433A A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1
3 4 5 6 7 8 9 10 10' 11 12 13 14 15 16

C01-a C01-a C01-a A1


H

A1

C01-a 3000 3150 2950


I

3000 A1
J

A1
K
PART-1 PART-2

10F.15 A1
L

C01-a C01-a C01-a C01-a A1

PART-3 PART-4
M

3000 3000 C01-a 2950 3000


C01-a C01-a
10F.14
6000

A1
N

3000 3170 3170 A1


O

1 C03-a C03-a
C01-a
3000
C01-a
3170
10F.19 C03-a 10F.20 C03-a
A1A-203 10F.18A 3000 10F.18 3000 2950 3000

10F.21 NAME:
SIGNATURE/
DATE:

A Approved As Submitted D Disapproved

A1 B
Approved as Noted
Resubmission not required E No Action Taken

M C Resubmission required

75
A1A-439Zc
Oct.17.2021 1 Revised as per comments
Sept.15.2021 000 Issued For Approval
6000

DATE REVISION NO. REMARKS

CLIENT

[T] +966 26681765


[F] +966 26681732
P.O. Box 3896 - Jeddah 21481

ARCHITECTS & INTERIORS [E] info@kaosarchitects.com

A1
N
MEP CONSULTANT
3000

PROJECT MANAGEMENT & SUPERVISION

A1
O CONTRACTOR
G
Limited Liability Co.

P.O. Box 13028, Jeddah 21493, Saudi Arabia


P.O. Box 16910, Riyadh 11474, Saudi Arabia

JOB NUMBER

2013-154

PART-3 PART-4
PROJECT NAME

ZAHID BUSINESS PARK

LOCATION: PLOT NUMBER


JEDDAH KSA
DESIGN BY
ARCHITECT TK
STRUCTURAL ENGINEER MF

1 ELECTROMECHANICAL ENGINEER DM

DRAWING NO. ZBP-HQ-SD-A1A-433D


DRAWN: MM
A1A-201

FOR CONTINUATION SEE PART-4


CHECKED: IS
DESIGN PHASE
CONSTRUCTION PHASE CP

MATCHLINE
REVISION NUMBER
REVIEW CYCLE: 001
FORMAT SCALE DATE

1 TENTH FLOOR PARTIAL FLOOR PLAN - PART 3 A1


DRAWING TITLE AND NUMBER
1:75 Sept.15.2021

- SCALE: 1 : 75 HEADQUARTERS
TENTH FLOOR
PARTIAL CEILING PLAN - PART 3
TRANSMITTAL #: DRAWING NUMBER
ZBP-V3-ALSAAD-HQ-DWG-SD-AR-257-REV01 ZBP/HQ/SD/A1A-433C
SIZE A1 594MM x 841MM
GENERAL NOTES

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SHOWN


IN THE DRAWING.
2. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
STRUCTURAL , MECHANICAL, ELECTRICAL AND ID DRAWINGS.
3. FOR CEILING PLANS AND DETAILS, REFER TO DRAWING NOS.
ZBP/HQ/SD/ID401 TO 414.
4. ALL ARCHITECTURAL LIGHTING FIXTURE ARE DALI EQUIPPED.

1 5. FOR INTERRIOR ROOM BY ROOM TO BE SUBMITTED SEPARATELY.

PART-1
6. FOR TOILET AREA REFER TO ENLARGEMENT PLAN.

PART-2
A1A-202
LEGEND:

8.5W LED DOWN LIGHTER

24W LED DOWN LIGHTER


A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 14W LED ADJUSTABLE SPOT LIGHT
6 7 8 9 10 10' 11 12 13 14 15 16 7W LED SUSPENDED LUMINARIE
20W LED SUSPENDED LUMINARIE
LINEAR LED LIGHTING, 14.4 W/m WITH
4000 4000 5400 2600 50 7950 3000 2100 2900 8000 8000 WITH DALI POWER DRIVER AS NEEDED
5W/10W/15W LED RECESSED TRIMLESS
GIMBLE LIGHT- IP44 IN TOILETS

5850
C01-a C01-a 10F.38 10F.37 200x600mm RECESSED LED LIGHTING-22W
74 3000 3000 SUSPENDED LED LIGHTING PROFILE
A1A-439Zb 35W or 44W
RECESSED LIGHTING MODULE
33 W LED LUMINAIRE-585x585mm
10F.39
C01-a C01-a
LUMINARIE FED FROM GENERATOR
PANEL
2950 C01-a C01-a 3000
C01-a C01-a C01-a LUMINARIES FED FROM EMERGENCY
2850 2950 BATTERY PANEL
3000 3150 3000
C01-a
3000 SUPPLY & RETURN
A1 CEILING DIFFUSER

C01-a
10F.04 J

750
3150 SUPPLY & RETURN
C01-a C01-a
C01-a LINEAR DIFFUSER
2850 3300
2850
10F.05
C01-a
10F.06
C01-a
3150
C01-a
3300
A1 FIRE ALARM FLASHER
2850
10F.36 K SMOKE DETECTOR
RATE OF RISE
C01-a 70 FIXED TEMPERATURE HEAT DETECTOR
2600 A1A-439Za
C01-a
C07-a SPRINKLER
3750
3150
C01-a 10F.33 C01-a C01-a 1
OCCUPANCY SENSOR

C01-a 3150 3100 2950


SPEAKER
2950
C01-a EXIT SIGNAGE
C01-a C01-a
3150
3000 3000 C01-a CEILING TYPE
C01-a C01-a C01-a
10F.13 3000 CEILING HEIGHT

8000
3000 3150 3000 GYPSUM BOARD
C01-a
TO RECEIVE PAINT - WHITE COLOR
10F.01 10F.30B C01-b
GYPSUM BOARD
10F.12 C01-b C01-b TO RECEIVE PAINT - SILVER GREY COLOR
2950 2950 C01-a C02-a ACOUSTICAL CEILING
C01-a
3150 2400 C03-a PERFORATED TILED CEILING 600 x 600 MM
C01-a
C01-a
10F.13A 3150 10F.03 2800 C04-a STRETCHED CEILING

C05-a ACOUSTICAL WOOD PANEL

C05-b ACOUSTICAL WOOD PANEL - WHITE

10F.35 C05-c ACOUSTICAL WOOD PANEL - GREY


C01-a
10F.07
C07-a C06-a PAINT FINISHED MOISTURE RESISTANT GB
2400 5760 C01-a
C01-a C07-a BOTTOM OF SLAB (PLASTER & PAINT FINISH)
3150 10F.34 C01-a 3300
2800 C08-a STAINLESS STEEL
10F.02 C01-a
2800
MATCHLINE A1 KEYPLAN:

FOR CONTINUATION SEE PART-2


DRAWING NO. ZBP-HQ-SD-A1A-433B
L
A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1
3 4 5 6 7 8 9 10 10' 11 12 13 14 15 16

C01-a C01-a C01-a C01-a C01-a A1


H

A1

3000 3150 2950 2850 2950


I

A1
J
PART-1 PART-2
C01-a
A1
K

C01-a
3000
3000 A1
L

C01-a 1
C01-a C01-a C01-a C01-a A1

PART-3 PART-4
M

3100 C01-a
3000 C01-a 2950 3000 2850
C01-a 2800

6000
A1
N

3170 A1

3100
O

C03-a
C01-a
3000
C01-a
3170
10F.19 C03-a 10F.20 C03-a
C01-a
2800
10F.31 C01-a
2800 10F.32 2
10F.18 3000 2950 3000 10F.30A A1A-203
10F.24 C01-a
10F.21 2700
10F.30 NAME:
10F.25 C01-a SIGNATURE/
3000 DATE:

A Approved As Submitted D Disapproved


C01-a
2700 A1 B
Approved as Noted
Resubmission not required E No Action Taken

M C Resubmission required
C01-a C01-a
3000 3150 69
A1A-439Z

75
A1A-439Zc C01-a C01-a
3150 3150
1 Sept.15.2021 000 Issued For Approval

6000
DATE REVISION NO. REMARKS
C01-a C01-a CLIENT
3000 3100 10F.29

10F.22 1

C01-a 10F.23
3000 [T] +966 26681765
[F] +966 26681732
P.O. Box 3896 - Jeddah 21481

ARCHITECTS & INTERIORS [E] info@kaosarchitects.com

C01-a A1
3150
N
MEP CONSULTANT

3000
77 76
A1A-439Zc A1A-439Zc
PROJECT MANAGEMENT & SUPERVISION

A1
O CONTRACTOR
G
Limited Liability Co.

P.O. Box 13028, Jeddah 21493, Saudi Arabia


P.O. Box 16910, Riyadh 11474, Saudi Arabia

JOB NUMBER

2013-154
PROJECT NAME

PART-3 PART-4 LOCATION:


ZAHID BUSINESS PARK

PLOT NUMBER
JEDDAH KSA
DESIGN BY
ARCHITECT TK
STRUCTURAL ENGINEER MF

1 ELECTROMECHANICAL ENGINEER DM
DRAWING NO. ZBP-HQ-SD-A1A-433C

DRAWN: MM
A1A-201
FOR CONTINUATION SEE PART-3

CHECKED: IS
DESIGN PHASE
CONSTRUCTION PHASE CP
MATCHLINE

REVISION NUMBER
REVIEW CYCLE: 000
FORMAT SCALE DATE

1 TENTH FLOOR PARTIAL FLOOR PLAN - PART 4 A1


DRAWING TITLE AND NUMBER
1:75 Sept.15.2021

- SCALE: 1 : 75 HEADQUARTERS
TENTH FLOOR
PARTIAL CEILING PLAN - PART 4
TRANSMITTAL #: DRAWING NUMBER
ZBP-V3-ALSAAD-HQ-DWG-SD-AR-257-REV01 ZBP/HQ/SD/A1A-433D
SIZE A1 594MM x 841MM
GENERAL NOTES

+ 3.45
ID A.F.F.L. LEGEND:

150
FOR LINEAR LIGHT

+ 3.100
A.F.F.L. + 2.95
A.F.F.L.
163 150
3.8.m HT.=150Wx150D
TYPICAL CURTAIN BOX DET.

SITE KEYPLAN:

69 SECTION (PART-1)
TO BASEMENT
TO BASEMENT
17

TO BASEMENT
TRASH

2 HC PARKING
ZBP/HQ/SD
SCALE 1 : 10

157 CARS
DROP OFF
A1A-433

DROP OFF
SAND
HQ VOLLEYBALL
COMMUNITY CENTER

12 CARS

DROP-OFF
PARKING

LANDSCAPED
AREA

CEILING VOID

75
NAME:
150

SIGNATURE/
DATE:

A Approved As Submitted D Disapproved


+ 3.100 + 3.100
Approved as Noted No Action Taken
+ 2.95 A.F.F.L. A.F.F.L. B Resubmission not required E
20 A.F.F.L.
GYPSUM BOARD CEILING GYPSUM BOARD CEILING C Resubmission required
20 836 GYPSUM BOARD CEILING
WALL FINISHING SEE (ID-308)

A DETAIL - A 69 SECTION (PART-2) Oct.17,2021 1 Revised as per comments


Sept.15,2021 0 Issued for Approval
- SCALE 1:5 ZBP/HQ/SD
SCALE 1 : 10 DATE REVISION NO. REMARKS
A1A-433
CLIENT

[T] +966 26681765


[F] +966 26681732
P.O. Box 3896 - Jeddah 21481

ARCHITECTS & INTERIORS [E] info@kaosarchitects.com

MEP CONSULTANT

PROJECT MANAGEMENT & SUPERVISION

CONTRACTOR
G
CEILING VOID Limited Liability Co.

P.O. Box 13028, Jeddah 21493, Saudi Arabia


P.O. Box 16910, Riyadh 11474, Saudi Arabia

JOB NUMBER

XXXX-XXX
CEILING VOID + 3.20 PROJECT NAME

A.F.F.L. ZAHID BUSINESS PARK


100

LOCATION: PLOT NUMBER


JEDDAH KSA
+ 3.20
100

FOR LINEAR LIGHT FOR LINEAR LIGHT DESIGN BY


A.F.F.L. ARCHITECT SD
STRUCTURAL ENGINEER 0
ELECTROMECHANICAL ENGINEER 0
+ 3.00 + 3.00 DRAWN: VP

A.F.F.L. A.F.F.L. FOR LINEAR LIGHT CHECKED: MK

GYPSUM BOARD CEILING GYPSUM BOARD CEILING GYPSUM BOARD CEILING DESIGN PHASE

3.8.m HT.=150Wx150D CONSTRUCTION PHASE CP


20 1330 3580 1686.2 TYPICAL CURTAIN BOX DET. 150
REVISION NUMBER
REVIEW CYCLE: 001
FORMAT SCALE DATE

A1 1 : 10 Sept.15,2021

SEE DETAIL - A 71 S E C T I O N DRAWING TITLE AND NUMBER

ZBP/HQ/SD HEADQUARTERS
A1A-433 SCALE 1 : 15
CEILING SECTIONS

TRANSMITTAL #: DRAWING NUMBER


ZBP-V3-ALSAAD-HQ-DWG-SD-AR-257-REV01 ZBP/HQ/SD/A1A-439Z
SIZE A1 594MM x 841MM
GENERAL NOTES

LEGEND:

+ 3.50
A.F.F.L.
CEILING VOID

FOR LINEAR LIGHT

+ 3.10
A.F.F.L. 150 + 2.95 150
A.F.F.L. FOR LINEAR LIGHT

GYPSUM BOARD CEILING 3.8.m HT.=150Wx150D


3915 TYPICAL CURTAIN BOX DET. 150

SITE KEYPLAN:

70 SECTION (PART-1)
TO BASEMENT
17
TO BASEMENT

TO BASEMENT
TRASH

2 HC PARKING
ZBP/HQ/SD
SCALE 1 : 10

157 CARS
DROP OFF
A1A-433

DROP OFF
SAND
HQ VOLLEYBALL
COMMUNITY CENTER

12 CARS

DROP-OFF
PARKING

LANDSCAPED
AREA

CEILING VOID

CEILING VOID
NAME:
SIGNATURE/
DATE:
FOR LINEAR LIGHT FOR LINEAR LIGHT
A Approved As Submitted D Disapproved
Approved as Noted No Action Taken
+ 3.10 + 3.10 B Resubmission not required E
+ 2.95 150 A.F.F.L. A.F.F.L. 150 + C Resubmission required
A.F.F.L. A.

GYPSUM BOARD CEILING GYPSUM BOARD CEILING


20 1125 3790

70 SECTION (PART-2) Oct.17,2021


Aug.28,2021
1
0
Revised as per comments
Issued for Approval
ZBP/HQ/SD
A1A-433 SCALE 1 : 10 DATE REVISION NO. REMARKS

CLIENT

[T] +966 26681765


[F] +966 26681732
P.O. Box 3896 - Jeddah 21481

ARCHITECTS & INTERIORS [E] info@kaosarchitects.com

MEP CONSULTANT

PROJECT MANAGEMENT & SUPERVISION

CONTRACTOR
G
CEILING VOID Limited Liability Co.

P.O. Box 13028, Jeddah 21493, Saudi Arabia


P.O. Box 16910, Riyadh 11474, Saudi Arabia

JOB NUMBER

XXXX-XXX
+ 3.20
A.F.F.L. PROJECT NAME

ZAHID BUSINESS PARK


70

LOCATION: PLOT NUMBER


JEDDAH KSA
80

FOR LINEAR LIGHT DESIGN BY


ARCHITECT SD
STRUCTURAL ENGINEER 0
+ 3.00 + 3.15 ELECTROMECHANICAL ENGINEER 0
A.F.F.L. A.F.F.L. FOR LINEAR LIGHT DRAWN: VP
CHECKED: MK

GYPSUM BOARD CEILING GYPSUM BOARD CEILING 3.8.m HT.=150Wx150D DESIGN PHASE
TYPICAL CURTAIN BOX DET. CONSTRUCTION PHASE CP
REVISION NUMBER
REVIEW CYCLE: 001
FORMAT SCALE DATE

72 S E C T I O N A1
DRAWING TITLE AND NUMBER
1 : 10 Aug.28,2021

ZBP/HQ/SD
A1A-433 SCALE 1 : 10
HEADQUARTERS
CEILING SECTIONS

TRANSMITTAL #: DRAWING NUMBER


ZBP-V3-ALSAAD-HQ-DWG-SD-AR-257-REV01 ZBP/HQ/SD/A1A-439Za
SIZE A1 594MM x 841MM
GENERAL NOTES

CEILING VOID
LEGEND:

+ 3.20
FOR LINEAR LIGHT FOR LINEAR LIGHT A.F.F.L.

+ 3.320
FOR LINEAR LIGHT GYPSUM BOARD CEILING A.F.F.L.

GYPSUM BOARD CEILING GYPSUM CORNICE GYPSUM CORNICE GYPSUM BOARD CEILING
406.8 1238.2 3485 1068.8 430 150
+ 3.15
GYPSUM BOARD CEILING A.F.F.L.
+ 3.00
A.F.F.L. FOR LINEAR LIGHT

3.8.m HT.=150Wx150D
TYPICAL CURTAIN BOX DET.

73 S E C T I O N SITE KEYPLAN:
ZBP/HQ/SD
A1A-433 SCALE 1 : 10
TO BASEMENT
TO BASEMENT
17

TO BASEMENT
TRASH

2 HC PARKING

157 CARS
DROP OFF

DROP OFF
SAND
HQ VOLLEYBALL
COMMUNITY CENTER

12 CARS

DROP-OFF
PARKING

LANDSCAPED
AREA

200
300
50
CEILING VOID CEILING VOID

200
80 50

80 50

NAME:
SIGNATURE/
230 150 750 150 3000 3900 DATE:

A Approved As Submitted D Disapproved


Approved as Noted No Action Taken
B Resubmission not required E
C Resubmission required

Sept.15,2021 0 Issued for Approval


DATE REVISION NO. REMARKS

74 SECTION (PART-1) CLIENT

ZBP/HQ/SD
A1A-433 SCALE 1 : 10

[T] +966 26681765


[F] +966 26681732
P.O. Box 3896 - Jeddah 21481

ARCHITECTS & INTERIORS [E] info@kaosarchitects.com

MEP CONSULTANT
200

PROJECT MANAGEMENT & SUPERVISION


300

CONTRACTOR
G
Limited Liability Co.

50
CEILING VOID CEILING VOID P.O. Box 13028, Jeddah 21493, Saudi Arabia
P.O. Box 16910, Riyadh 11474, Saudi Arabia

JOB NUMBER

XXXX-XXX
200

PROJECT NAME

ZAHID BUSINESS PARK

80 50

80 50
LOCATION: PLOT NUMBER
JEDDAH KSA
DESIGN BY
3900 3000 150 750 150 250
ARCHITECT SD
STRUCTURAL ENGINEER 0
ELECTROMECHANICAL ENGINEER 0
DRAWN: VP
CHECKED: MK
DESIGN PHASE
CONSTRUCTION PHASE CP
REVISION NUMBER
REVIEW CYCLE: 000
FORMAT SCALE DATE

A1 1 : 10 Sept.15,2021
DRAWING TITLE AND NUMBER

74 SECTION (PART-2) HEADQUARTERS


ZBP/HQ/SD CEILING SECTIONS
A1A-433 SCALE 1 : 10
TRANSMITTAL #: DRAWING NUMBER
ZBP-V3-ALSAAD-HQ-DWG-SD-AR-257-REV01 ZBP/HQ/SD/A1A-439Zb
SIZE A1 594MM x 841MM
GENERAL NOTES

LEGEND:

+ 3.20
CEILING VOID
A.F.F.L. + 3.170 + 3.170
A.F.F.L. A.F.F.L.

100
70
+ 3.00 + 3.00
FOR LINEAR LIGHT A.F.F.L. A.F.F.L.
GYPSUM BOARD CEILING
3.8.m HT.=150Wx150D
150 TYPICAL CURTAIN BOX DET. 2085 300 2065 150 20

75 S E C T I O N SITE KEYPLAN:
ZBP/HQ/SD
A1A-433 SCALE 1 : 10
TO BASEMENT
17
TO BASEMENT

TO BASEMENT
TRASH

2 HC PARKING

157 CARS
DROP OFF

DROP OFF
SAND
HQ VOLLEYBALL
COMMUNITY CENTER

12 CARS

DROP-OFF
PARKING

LANDSCAPED
AREA

+ 3.300
A.F.F.L.
CEILING VOID CEILING VOID
80

+ 3.150 + 3.150
A.F.F.L. A.F.F.L.
70

NAME:
80

80
SIGNATURE/
DATE:
FOR LINEAR LIGHT + 3.150 + 3.150
70

70
A.F.F.L. A.F.F.L. A Approved As Submitted D Disapproved
Approved as Noted No Action Taken
3.8.m HT.=150Wx150D B Resubmission not required E
TYPICAL CURTAIN BOX DET. + 3.00 + 3.00
A.F.F.L. A.F.F.L. C Resubmission required
GYPSUM BOARD CEILING
150 1255 2075 300 2075 755 20

Oct.17,2021 1 Revised as per comments


Sept.15,2021 0 Issued for Approval

76 S E C T I O N CLIENT
DATE REVISION NO. REMARKS

ZBP/HQ/SD
A1A-433 SCALE 1 : 10

[T] +966 26681765


[F] +966 26681732
P.O. Box 3896 - Jeddah 21481

ARCHITECTS & INTERIORS [E] info@kaosarchitects.com

MEP CONSULTANT

PROJECT MANAGEMENT & SUPERVISION

CONTRACTOR
G
Limited Liability Co.

P.O. Box 13028, Jeddah 21493, Saudi Arabia


P.O. Box 16910, Riyadh 11474, Saudi Arabia

CEILING VOID CEILING VOID CEILING VOID JOB NUMBER

XXXX-XXX
PROJECT NAME

+ 3.150 ZAHID BUSINESS PARK


A.F.F.L.
LOCATION: PLOT NUMBER
JEDDAH KSA
80

50 100
DESIGN BY
70

ARCHITECT SD
STRUCTURAL ENGINEER 0
ELECTROMECHANICAL ENGINEER 0
3.8.m HT.=150Wx150D GYPSUM BOARD CEILING DRAWN: VP
TYPICAL CURTAIN BOX DET. + 3.00 + 3.00 CHECKED: MK
A.F.F.L. A.F.F.L. DESIGN PHASE
CONSTRUCTION PHASE CP
150 1090 4000 1370 20 REVISION NUMBER
REVIEW CYCLE: 001
FORMAT SCALE DATE

A1 1 : 10 Sept.15,2021
DRAWING TITLE AND NUMBER
77 S E C T I O N HEADQUARTERS
ZBP/HQ/SD
A1A-433 SCALE 1 : 10 CEILING SECTIONS

TRANSMITTAL #: DRAWING NUMBER


ZBP-V3-ALSAAD-HQ-DWG-SD-AR-257-REV01 ZBP/HQ/SD/A1A-439Zc
SIZE A1 594MM x 841MM

You might also like